Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date2 Jan 2025
Closing Soon9 Jan 2025
Tender Amount₹ 3,21,79,000
Costs
EMD
₹ 6,44,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_988862_1Tender No
06/S.E./2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Reinforced cement concrete M-20 (1:1.5:3) with stone grit cement, coarse sand and With maximum size of 20 mm stone gritt including cost of labour material etc. complete as per direction of Engineer in charge.
379
-
-
... More
Centering & Shuttering for reinfored cement concrete work in super structure including cost of material, labour etc. complete as per direction of Engineer in charge.
983
-
-
... More
Earth work by manual labour in embankments of more than 1.50m height on Ramp approach and Road Diversion with material and labour etc. as per direction of Engineer in charge.
4840
-
-
... More
First class brick on edge soling both side with filling joints with earth and preparation of sub grade including cost of Labour & T&P etc. complete. as per direction of Engineer in charge.
675
-
-
... More
Earth work in Restoration of Daula of Allahabad dy. From km. 0.000 to 16.100 with manual compaction and dressing including all T&P, lead and lift etc. complete As per direction of engineer in charge.
14284
-
-
... More
Supplying and Fixing 75mm. Dia P.V.C. pipe for weep holes & rain water including cost of labour material etc. as per direction of engineer in charge.
57
-
-
... More
Dewatering by hiring 5H.P. diesel pumps including operator & P.O.L. complete as per direction of Engineer-in-charge.
1800
-
-
... More
Supplying and Fixing Sign Board For Information Fabricated with steel angles, flats and plates including all material, labour T&P etc. complete as per direction of Engineer-in-charge.
6
-
-
... More
Proving and Laying 1:1:2 (M-25) cement concrete with cement, coarse sand and maximum size of 20 mm stone gritt in wearing coat including cost of material, labour etc. complete as per direction of Engineer in charge.
72
-
-
... More
Pre-Costing & fixing Boundary pillar of Allahabad dy. From Head to Tail both side every 200 m including all cost of material,labour T&P etc.work complete as per direction of engineer in charge.
184
-
-
... More
Reinforced cement concrete/ cement concrete block (M-20) 1:1.5:3 with stone grit 4.75 to 20 mm size, cement and coarse sand including cost of labour material etc. complete as per direction of site incharge.
143
-
-
... More
Plain cement concrete in 1:2:4 (M-15) cement, coarse sand and 4.75mm to 20 mm stone grit under fall bed including all cost of labour material etc. complete as per direction of site incharge.
143
-
-
... More
1st class brick work in 1:4 Cement mortar including all material, labour T&P etc. complete as per direction of site incharge.
882
-
-
... More
Deep struck pointing 1:2 Cement mortar including all material, labour T&P etc. complete as per direction of site incharge.
1260
-
-
... More
Finishing wall with two coats of water proofing cement paint of approved make & quality of required shade on wall surface over one coat of white cement primer with preparation of surface including cost of all material etc. as per direction of site in incharge.
1878
-
-
... More
Plain cement concrete in 1:3:6 (M-10) with cement, coarse sand and 20 to 40 mm stone grit including mechanical vibration, all labour and T&P etc with mechanical mixing as per direction of site in incharge.
448
-
-
... More
Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand including lift upto 1.5 meter and lead upto 30 meter including filling, watering, ramming of excaveted earth into the trenches or up to the space and sides of the foundation trenches or into charge upto a distance of 30 meter from the foundation trenches. Dry earth work in foundation as per direction of engineer in charge.
4957
-
-
... More
Laying Plain Cement Concrete in 1:3:6 in cement, coarse sand and stone grit up to 20 mm size crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour, materials, T&P etc. coppaction required for proper completion of work as per direction of site in incharge.
29
-
-
... More
Supply & Laying of LDPE Film below cement concrete Lining including all cost of material, labour T&P etc. complete. as per direction of site in incharge.
1240
-
-
... More
Casting and fixing of Reinforced cement concrete Wheel guard including all labour, materials T&P etc. complete. as per direction of site in incharge.
128
-
-
... More
Earth work in correcting internal section of Allahabad Dy. from km 0.000 to km 18.400 by Hydraulic excavator (Poclain/JCB) with side slop cutting at required slope including all lead & lift in all type of soil with proper disposal , compaction & dressing of bank and daula as directed by the site in charge .
34146
-
-
... More
Earth work in Restoration of Allahabad Dy. From km. 0.000 to 0.600 L/B and km 0.600 to km 16.200 R/B and 16.200 to 18.400 both bank of canal by hydraulic excavator (poclane/JCB) including lead upto maximum 210m and lift with proper compaction in layers and dressing etc complete as directed by the site in charge .
21662
-
-
... More
Preparation of sub grade for lining work including all cost of material, labour T&P etc. complete as directed by the site in charge .
1209
-
-
... More
Laying local sand including screening work and stacking at quarry site including all cost of labour material, T&P etc. compaction required for proper completion of work as directed by the site in charge .
121
-
-
... More
Centering & Shuttering for cement concrete work in super structure including cost of material, labour etc. complete as per direction of Engineer in charge.
409
-
-
... More
Fabrication and supplying of steel for gate including all labour, material , T&P etc. complete as per direction of Engineer in charge.
1942
-
-
... More
Threding, turning charge of 50 mm dia spindle rod including all labour, materals T&P etc. complete as per direction of Engineer in charge.
8
-
-
... More
Supplying and Fixing of bearing set for 50 mm dia spindle rod in steel gate including all cost of labour, materials, T&P etc. complete. as per direction of Engineer in charge.
16
-
-
... More
Supplying and Fixing of cost iron 10" dia coller couppling with 4 nos. 5/8" holes in equal distance for steel gate including all cost of labour ,materials, T&P etc. complete as per direction of Engineer in charge.
16
-
-
... More
Fabrication and supplying of handle including all material, labour T&P etc. Complete as per direction of Engineer in charge.
8
-
-
... More
Supplying and Fixing of cost iron housing with gun metal bush in steel gate including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
8
-
-
... More
Supplying and Fixing cost iron Coupling and housing nut bolt 3"x5/8" for steel gate including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
128
-
-
... More
Painting two coat of synthetic enamel paint on new surface(excuding cost of primer) superior quality such as luxol, highgloss, apcolite, superiac, dulux including cost of all material labour t &p etc required for proper completion of work as per direction of Engineer in charge.
51
-
-
... More
Hiring charge of tripod , chain tackle , tractor trolly for lowering of steel gate including all cost of labour, materials, T&P etc. complete. as per direction of Engineer in charge.
8
-
-
... More
Earth work in making canal section in 08 No. off taking minors from Allahabad Dy. for repairing head regulator with all type of soil including proper manual compaction and dressing with all lead , lift T&P etc. complete as per direction of Engineer in charge.
1288
-
-
... More
Oiling and greasing work steel gate including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
8
-
-
... More
Painting one coat of red oxide primer on steel surface after sand papering and cleaninig of surface including cost of all material labour and t&p etc as per direction of Engineer in charge.
51
-
-
... More
Providing and fixing 100 mm dia Reinforced cement concrete N.P.3 pipe including all cost of material, labour T&P etc. complete as per direction of Engineer in charge.
714
-
-
... More
12 mm thick Plastering work in 1:4 cement sand mortar including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
1778
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%