Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date1 Aug 2024
Closing Date9 Aug 2024
Tender Amount₹ 44,22,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying R.C.C M-25 (1:1:2) With 12 to 20mm size crushed stone grit , coarse sand cement including cost of all matirial, labour t&p etc .

105.21

-

-

... More
Steel for reinforcement Reinforcement with cutting,bending,binding&placing in position including cost of binding wire ,steel labour t&p etc. For 10 MM DIA T.M.T BAR

3.21

-

-

... More
Steel for reinforcement Reinforcement with cutting,bending,binding&placing in position including cost of binding wire ,steel labour t&p etc. For 12 MM DIA T.M.T BAR

2.43

-

-

... More
Steel for reinforcement Reinforcement with cutting,bending,binding&placing in position including cost of binding wire ,steel labour t&p etc. For 16 MM DIA T.M.T BAR

1.71

-

-

... More
Laying brick on edge soling with s.o.b brick for drain bed.

180

-

-

... More
Providind and fixing of wheel guard

4

-

-

... More
E/W In makng canal section, Drain section.

632

-

-

... More
E/W In removing of diversion after comletion of work.

448

-

-

... More
Dewatring by 7.5 hp deisel pump set with costof pol including cost of all matirial, labour t&p and carriage upto work site etc compete.

140

-

-

... More
S/F Of Sign Board with complete work

1

-

-

... More
E/W in back filling

122.93

-

-

... More
Construction Of New V.R.B. (Box culvert ) on Sindhwal Dy. At Km. 4.157 Earth work in foundation with all sorts of soil, all leads & lifts including its disposal as per direction of Engineer-in-charge

150.94

-

-

... More
Laying P. C. C. (1:2:4) in foundation with 20 to 40 mm size stone ballast & coarse sand. Including cost of all material, labour and T&P etc. required for proper completion of work.

19.47

-

-

... More
Centering & shuttering for slab bridge including cost of all material,labour and T&P etc. required for proper completion of work

209.16

-

-

... More
Steel for reinforcement with cutting,bending,binding & placing in position including cost of binding wire,steel,labour and T&P etc. required for proper completion of work For 8 MM DIA TMT BAR

0.19

-

-

... More
Steel for reinforcement with cutting,bending,binding & placing in position including cost of binding wire,steel,labour and T&P etc. required for proper completion of work For 10 MM DIA TMT BAR

1.33

-

-

... More
Steel for reinforcement with cutting,bending,binding & placing in position including cost of binding wire,steel,labour and T&P etc. required for proper completion of work For 12 MM DIA TMT BAR

2.03

-

-

... More
Steel for reinforcement with cutting,bending,binding & placing in position including cost of binding wire,steel,labour and T&P etc. required for proper completion of work For 16 MM DIA TMT BAR

1.1

-

-

... More
Laying R.C.C 1:1.5:3 with 10-20 mm size crushed stone grit & coarse sand including cost of all materials, labour and T&P etc. required for proper completion of work.

26.5

-

-

... More
Laying C.C. (1:1:2) in with 12-20 mm size crushed stone grit & coarse sand including cost of all materials,labour and T&P etc. required for proper completion of work.

47.93

-

-

... More
Laying C.C. (1:1:2) in W.C with 6.7 to 11.20 mm size crushed stone grit & coarse sand including cost of all materials,labour and T&P etc. required for proper completion of work.

9.71

-

-

... More
Earth work in making approach /diversion at road with all sorts of soil, all leads and lifts including manual compaction and dressing to profile.

295

-

-

... More
Earth work in making canal section with lead & lift. Including cost of all material etc.

462

-

-

... More
Brick on edge soling with S.O.B bricks including preparation of sub grade, joints filled with local earth including cost of all materials, labour, T&P etc.

266

-

-

... More
M-150 Dry brick on end pitching .including preparetion of sub grade and filling joints with local sand including cost of sand./M2

18.9

-

-

... More
Fixing of 0.20x0.15x0.75 mm size wheel guard. Including cost of all material, labour T&P etc. with proper completion of work.

4

-

-

... More
Brick work in 1:4 CM with 1st class bricks & coarse sand including cost of all material,labour and T&P etc. required for proper compltetion ofwork

3.8

-

-

... More
P/Laying brick ballast below filling 25mm to 40mm . Including Cost of material, Labour & T&P etc.

5.45

-

-

... More
Providing and fixing PVC pipe 75mm dia for weep holes .

6

-

-

... More
Fabrication and supply sign board on angle iron frame 40x40x6 mm 25x3 mm flat iron bracing and 18 SWG ms sheet including cost of all material , labour T&P etc required for proper completion of work.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.