Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date18 Jan 2025
Closing Soon24 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 56,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_987816_3Tender No
07/EE/SNK-4/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Centering & shuttering for C.C work in enclosed filter including cost of all material labour and T&P. etc. required for proper completion of work.
45.69
-
-
... More
Centering & shuttering for R.C.C work upto 10 m span including all taxes, cost of all material labour and T&P. etc. required for proper completion of work.
29.97
-
-
... More
Two coats of bitumen painting with two layers of tarfelt again followed by 2 coats of bitumen painting including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.
7.4
-
-
... More
Cutting, bending, binding & placing of Steel reinforcement in proper position including cost of all taxes, binding wire, steel labour and T&P. etc. required for proper completion of work.
1.55
-
-
... More
S/F 20 mm thick Joint filler board in construction joint including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
7.9
-
-
... More
Laying R.C.C. 1:1½ :3 using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, material, labour & T&P etc.
22.45
-
-
... More
Cement Pointing (Struck deep) in 1:2 CM with Hamirpur fine coarse sand including cost of all material, labour & T&P. required for proper completion of work.
123.62
-
-
... More
E/W in embackment making road diversion in all types of soil including all leads, lifts, royalty with proper dressing & manual compaction for proper completion of work.
3553
-
-
... More
E/W in embackment making ramp in all types of soil including all leads, lifts, royalty with proper dressing & manual compaction for proper completion of work.
427.8
-
-
... More
S.O.B. Brick on edge soling on diversion/ramps including preperation of subgrade and filling joints with local sand including all taxes, cost of all labour and T&P. etc. required for proper completion of work.
740.25
-
-
... More
Dismentling of SOB Brick on edge soling from diversion/ramps including all taxes, cost of all labour and T&P. etc. required for proper completion of work.
740.25
-
-
... More
Relaying dismentled SOB Brick on edge soling from diversion/ramps including prepration of surface & filling joints with local sand including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.
244.28
-
-
... More
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.
2312.81
-
-
... More
S/F Wheel guard stone including cost of all material, labour & T&P. by manufacturing at site including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%