Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Eprocure
Opening Date12 Sep 2024
Closing Date25 Sep 2024
Tender Amount₹ 70,47,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying C.C.(1:3:6) with Cement, coarse sand and Stone ballast 20 to 40mm as also including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge.

182.95

-

-

... More
Laying C.C.(1:1.5:3) with Cement, coarse sand and Stone grit 6 to 12 mm size & also including all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.

145.89

-

-

... More
Random rubble masonary work in (1:4) with Cement, coarse sand and boulder & also including all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.

204.3

-

-

... More
Supplying and laying of Non-Woven Geo Textile Sheet made of 250 GSM 100% polyproplene staple fiber (continuous filament not allowed) also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge.

1846.8

-

-

... More
Providing and laying Dry stone pitching hand packed & also including all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.

424.76

-

-

... More
Class 10/M-100 brick work in 1:5 cement and sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge.

5.12

-

-

... More
Cement Plaster in 1:4 on Brick masonary with cement sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge.

48.85

-

-

... More
Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge.

33.1

-

-

... More
Finishing walls with Acrylic smooth exterior paint applied two coat of approved make of required shade on old surface directed by Enginer-In-Charge to give even shade after throughly brushing the surface to remove all dirt and remains of loose powdered material including cost of materials labour Tools and Plants etc for proper completion of work.

424.63

-

-

... More
Earth work in embankment by power tranported earth with all lead and lift including excavation, loading, unloading, stacking, manual compaction, dressing complete also including cost of all material, labour and T&P etc. All complete as per direction of Engineer in charge.

4968.39

-

-

... More
First class/M-150 Brick flooring laid flat over 12 mm thick mortar bed 1:4 Cement mortar including preparation of base to proper slope and its ramming and including supply of all materials, labour and T&P etc. required for proper completion of the Work as per Directed by Engineer In Charge.

362.3

-

-

... More
Brick soling with brick laid on edge straight over burnt bricks laid flat and dry including prepration of sub-grade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1cm(3/8") depth of local earth of P.I. 5to7 or sand over the entire surface and including labour and T&P etc. required for proper completions of the work.

1612.5

-

-

... More
Painting two coat after 1st coat on perviously painted old surface on steel and other metal surface including cleaning the surface of all dirt, dust and other foreign matter, sand pappering and stopping including cost of materials labour Tools and Plants etc as required for proper completion of work. Paint shall be used as per standard I.S. specification.

416.86

-

-

... More
Painting on old rusted steel surface of gates and appurtenances after preparation of surface properly by sand blasting process and applying two coat of Zinc Rich primer and two coat of solvent less epoxy paint including cost of all material, labour T&P and scaffolding required for proper completion of work.

33.43

-

-

... More
Greasing oiling of component of lifting mechanism of gates (excluding rollers) after proper cleaning with replacing Grease cup/Grease Nipple as required including cost of all material, labour and T&P etc. required proper completion of work.

1

-

-

... More
Applying cardium compound on steel wire rope, teeth of drum gear and pinion of gate after proper cleaning including cot of all materail, labour, T&P and scaffolding with safety arrangement required for proper completion of work.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.