Irrigation Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date15 Feb 2025
Closing Soon28 Feb 2025
Tender Amount₹ 3,54,28,000 
Notes
Download

AI Insights

Technical Capacity
... View More
The required prior work experience for the bidder is related to the completion of civil engineering works. The bidder's experience is evaluated based on the maximum value of civil engineering works executed in any one year during the last five years, updated by giving 8% simple weightage per year to bring them to the current financial year price level. The bidder should have completed works with a value that can be calculated using the formula: I = T * A, where I is the maximum value of civil engineering works executed, T is the weightage factor, and A is the actual value of the work done. The bidder's average annual financial turnover during the last three years should be at least 30% of the estimated cost of the work, updated by giving 8% simple weightage per year to bring it to the current financial year price level. The bidder should have executed similar work from the following: Spillways/Dams/Barrages/ Aqueducts/Canal Bridges/ Head Regulater/Cross Regulater/ Tunnels/ Syphan, Canals Construction Works/ Canal Pacca Works/Canal Lining works/Flood protection works/ river training works/Drains Construction Works/ Drains Pacca Works/Bund (Tatbundh) Construction Works/Bundh (Tatbundh) Pacca Works, Building Work, Construction of Ghat. The values and percentages mentioned for similar works completed are as follows: - 170.10, 3.41, 2945.00 - 153.95, 3.08, 2945.00 - 118.23, 2.37, 2945.00 - 380.35, 7.79 - 364.28, 7.09 - 130.87, 2.62, 2045.00 - 441.97, 8.84, 2045.00 - 417.50, 8.35, 2945.00 - 296.58, 5.94, 2945.00 - 218.10, 4.37, 2045.00 - 263.24, 5.27, 2945.00 - 258.53, 5.18, 2945.00 - 139.43, 2.79, 2945.00 - 468.95, 9.38, 945.00 - 243.31, 4.87, 2945.00 These values seem to represent the amount and percentage of similar works completed by the bidder.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying, Filling & Laying of G.E.O Bags made of 200 GSM woven fabric of size 1.09M x0.69 M in Gabion rope case size (1.8M x1.2 Mx0.5M) with mesh size 150 mm x150mm including cost of all material, labour, carriage upto site T&P & taxes etc required for completion of work.

8401.44

-

-

... More
Supplying & fixing porcupine constructed with 1:2:4 R.C.C. having 6 nos membrane of size 3.0x0.10x0.10 m joined with special bolt & washers including cost of all material, labour, carriage upto site T&P & taxes etc required for completion of work.

280

-

-

... More
Supplying of fixing bamboo bracing 50 to 80mm dia i/c cost of material, labour, carriage upto site T&P & Taxes etc, required for completion of work.

3863.81

-

-

... More
Supplying and Laying Jhau Jhakar in porcupine Structure.

2851.2

-

-

... More
Earthwork over spur & pitching by power transported earth with a lead beyond 200m and upto 1.00km including exca vation , loading , unloading , manual compaction , dressing and all lifts complete excluding royalty will be applicable from time to time on govt orders.

207.9

-

-

... More
Supplying & laying 150mm coarse sand in filter of boulder pitching including all cost of material, labour , T&P etc. required for proper completion of work

368.61

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.