Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Eprocure
Opening Date16 Jan 2025
Closing DateCancelled
Tender Amount₹ 2,17,00,000
AI Insights
Technical
Technical
Technical Capacity
... View More
The bidder is required to provide particulars of previous contracts successfully executed, including details such as the name of the department, name and description of the work, value of the work in Rs, and the period of execution. However, specific information on the required amount or percentage of similar works completed is not mentioned, indicating that no specific value or percentage is specified.
Costs
EMD
₹ 4,34,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_992536_1Tender No
06/SE/MRT/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of CC Lining of Kuchesar Dy under M.G.C.Project First Stage.
-
-
-
... More
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.
689.04
-
-
... More
Provide shuttering and centering including all materials and T&P etc for proper complition of work.
1006.9
-
-
... More
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.
78.57
-
-
... More
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.
277.7
-
-
... More
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.
3300.66
-
-
... More
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work
203.81
-
-
... More
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work
888.76
-
-
... More
Construction of CC Lining of VRB/DRB of Kuchesar Dy under M.G.C.Project First Stage.
-
-
-
... More
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.
211.91
-
-
... More
Provide shuttering and centering including all materials and T&P etc for proper complition of work.
409.69
-
-
... More
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.
38.01
-
-
... More
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.
68.79
-
-
... More
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.
963.78
-
-
... More
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work
60.1
-
-
... More
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work
242.54
-
-
... More
Construction of Outlets at Right Bank and left Bank of Kuchesar Dy. under M.G.C.Project First Stage.
-
-
-
... More
Excavation in foundation in ordinary soil (lome,clay or sand) including lift upto 1.50M and lead upto 30M. And including filling watering and ramming of Excavated earth ito trenches or into the space between the building and the side of foundation treches or into the plinth and removal and disposal of surplus earth upto a distence of 30M. from the trenches as ditected by the Engineer-in-Charge.
319.25
-
-
... More
Providing & Laying cement concrete in foundation 1:3:6 stone grit, sand including supply of all material, labour, tools and plants etc
31.55
-
-
... More
Brick work in M-150 Brick 1:4 cement and coarse sand f.m of 2.20 (1 cement :4 C/A) mortar in foundation, plinth level & Super structure including supply of all materials,labour and T&P .required for proper complition
67.69
-
-
... More
Providing and fixing of 150/110 mm Diameter HDPE pressure pipe @6kg/sqm in required length as per site and complete the work all as specified and as directed by Engr-in-Charge.
103
-
-
... More
Struck deep cement pointing in 1:2 CM incl cost of material & labour T&P etc.
276.71
-
-
... More
Providing & Laying cement conc in floring or copping of wall etc. in proportion of 1:2:4 using 10-20 mm stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
12.65
-
-
... More
Painting work on cemented or brick surface one prime coat and one coat of dry distemper in new surface incl. all material & labour etc.
391.79
-
-
... More
Construction of Boundary Pillars of Kuchesar Dy
-
-
-
... More
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m.
137
-
-
... More
Providing & Laying cement concrete in foundation (1:2:4) stone grit, incl fixing of poles etc.sand including supply of all material, labour, tools and plants etc
42.47
-
-
... More
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work.
113.71
-
-
... More
Providing & Laying R.C.C. M-20 1:1.5:3 nominal mix with cement coarse sand and stone agg i/c all cost of material labour T&P etc.
13.7
-
-
... More
Steel Reinforcement for RCC work i/c cost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work.
1.37
-
-
... More
Painting of RCC precast boundry pillars of size 250mm x250mm x 900 mm including cost of material & labour and T&P etc. and writing letters including cost of material upto 15 cm height
137
-
-
... More
CConstruction of Brick soling on service road of Kuchesar Dy. under M.G.C.Project First Stage.
-
-
-
... More
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work..
18420
-
-
... More
Repair of VRB/DRB of Kuchesar Dy under M.G.C.Project First Stage.
-
-
-
... More
Ist class Brick Work in 1:4 CM M-150 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work.
3.46
-
-
... More
Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work.
19.84
-
-
... More
One prime coat and one coat of dry distemper of new work including supply all material labour T&P etc required for proper completion of work
338.18
-
-
... More
Providing and fixing of Hazard maker including cost of all material labour and T&P etc.
48
-
-
... More
painting and printing letters upto 30cm height including supply all material labour T&P etc required for proper completion of work at VRB
12
-
-
... More
Providing and fixing sign board of size (1.80x1.20)
3
-
-
... More
Maintanace of Cattle Ghat Kuchesar Dy. Under M.G.C.Project First Stage.
-
-
-
... More
Ist class Brick Work in 1:4 CM M-150 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work.
13.65
-
-
... More
Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work.
88.5
-
-
... More
One prime coat and one coat of dry distemper of new work including supply all material labour T&P etc required for proper completion of work
75
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements