Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Eprocure
Opening Date27 Jan 2025
Closing Date1 Feb 2025
Tender AmountRefer Documents
Costs
EMD
₹ 96,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_993437_9Tender No
01/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing & Laying of C.C M-15 A20(1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
112.58
-
-
... More
Providing & Laying of R.C.C. M-25 A20 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
135.72
-
-
... More
Ist class Brick work in mud mortar in warping including cost of all material labour T&P etc. complete for proper completion of work
8.4
-
-
... More
Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
257.22
-
-
... More
Centering & Shuttering of line plywood or steel shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge
229.14
-
-
... More
P / Fixing 20mm expenssion joint with angle iron on both side and 6 mm thick steal plate over angle iron welded contineously including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
21.74
-
-
... More
Providing & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
10.28
-
-
... More
Providing & Fixing Nomitox board in expension joints including cost of all labour and T&P etc. required for proper complition of work.
6.52
-
-
... More
Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.(upto 10mm dia)
3.19
-
-
... More
Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.(above 10mm dia )
9.66
-
-
... More
Providing & laying of local sand in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
72.39
-
-
... More
Providing & Fixing 100 mm dia PVC pipe for utility service including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
13.1
-
-
... More
Providing & Fixing 75 mm dia PVC drainage spout pipe including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
2.8
-
-
... More
Providing & laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
54.91
-
-
... More
Providing & Fixing mild steel Angle 65 x65 x8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
10.28
-
-
... More
Providing & Fixing sign caution board in position including cost of all mterial, labour and T&P for proper complition of work.
4
-
-
... More
Providing & Fixing year plate in position including cost of all mterial, labour and T&P for proper complition of work.
1
-
-
... More
Providing & Fixing B.M plate in position including cost of all mterial, labour and T&P for proper complition of work.
1
-
-
... More
Providing & Fixing wheel guard in position including cost of all mterial, labour and T&P for proper complition of work.
4
-
-
... More
Earth work in filling in approaches and diverson including all lift and lead upto 600 m, compaction dressing as requied for proper completion of work including all cost of labour, material and T&P etc. as Directed By Engineer in Charge.
758.16
-
-
... More
Supplying & laying of RBM on approaches and diverson including all lead lift, compaction, dressing as required for proper completion of work including all cost labour, material and T&P etc. completeor as Directed By Engineer in Charge.
112.5
-
-
... More
S/L Brick soling with straight over burnt bricks laid on edge and dry and edging on both sides prepration subgrade to prescribed camber including supply of brick filling joints with local earth over the entire surface including cost of all material, labour, T&P etc for proper completion of work complete as directed by Engineer-in- charge.
930
-
-
Evaluation Notes How It Works ?