Irrigation Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Road Construction
Building Construction
Eprocure
Opening Date18 Feb 2025
Closing Soon7 Mar 2025
Tender Amount₹ 1,91,79,000 
Notes
Download

Costs

Summary

Construction R.c.c. V.r.b. At Km 1.115 Of Akbarganj Dr. At Km. 20.497 Of Gulalpur Dr. And At Km. 1.95 Of Harkaranpur Dr.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in Foundation of R.C.C. Work on drain of discharge above 10 cumecs including manual compaction and dressing to profile as per direction of engineer in charge

2224.35

-

-

... More
Providing and laying P.C.C.in M-15 (1:2:4) mix Kabrai Stone grit 10 to 20 mm and Hameer Pur Coarse sand i/c cost of all material, Formwork labour, T&P etc.complete for Proper completion of Work as per direction of engineer in charge

148.01

-

-

... More
Providing and laying R.C.C. upto bed level in M-20 (1:1.5:3) mix Kabrai Stone grit 10 to 20 mm and Hameerpur Coarse sand i/c cost of all material, Formwork labour, T&P etc.complete for Proper completion of Work as per direction of engineer in charge

343.48

-

-

... More
Providing and laying R.C.C. above bed level including abutment, slab and pier in M-20 (1:1.5:3) mix Kabrai Stone grit 10 to 20 mm and Hameerpur Coarse sand i/c cost of all material, Formwork labour, T&P etc.complete for Proper completion of Work as per direction of engineer in charge

286.28

-

-

... More
Providing and laying R.C.C.in M-25 (1:1:2) mix Kabrai Stone grit 10 to 20 mm and Hameerpur Coarse sand i/c cost of all material, Formwork labour, T&P etc.complete for Proper completion of Work as per direction of engineer in charge

144.08

-

-

... More
P/L 110mm dia PVC pipe for weep hole with including cost of material, labour, T&P etc. complete for Proper completion of Work as per direction of engineer in charge

211.2

-

-

... More
Supplying/Laying 300 GSM Non-woven Geotextile made 100% Polypropylene staple fibre (continous filament not allowed) bonded into stable network through needlepunching and meeting the technical Specification and qualification criteria as per direction of engineer in charge

22.68

-

-

... More
Reinforcement cutting bending, binding and placing of steel reinforcement in position including cost of binding wire and including cost of steel as per direction of engineer in charge

82.29

-

-

... More
Dry brick on edge soling including preparation of subgrade and filling joints with local sand including cost of material, labour, T&P etc.complete for Proper completion of Work as per direction of engineer in charge

436

-

-

... More
Brick on edge soling with old & dismantalled S.O.B. bricks including preparation subgrade and filling joints with local sand including cost of local sand but excluding cost of brick as per direction of engineer in charge

685.31

-

-

... More
Boring with 100mm dia casing pipe including lowering and exxtraction of assembly, loading, unloading and carriage. One boring has 10 meter water dia dewatering capacity so no. of including all cost of materials, T&P and labour and other accessories required for proper completion of work as per direction of engineer in charge

11

-

-

... More
Running of 5 H.P.Diesel pump/ generator for dewatering including Suction & delivery pipe, Operator & Khalashi and P.O.L. complete with all respect as per direction of engineer in charge

4088

-

-

... More
P/L 110mm PVC pipe for drainage spout with including cost of material, labour, T&P etc. complete for Proper completion of Work as per direction of engineer in charge

15.28

-

-

... More
S/F of Sign board size (1.20 X 0.90 ) Made by Angle Iron 40X40X6 mm. with M.S. Sheet of 18 S.W.G. with bracing of 25X5mm flat Iron including Excavation of pit 30x30x45 cm and fixing cc. 1:2:4 with painting and writing letters as per direction of Eng-in-charge.

3

-

-

... More
Filling expansion Joint with joint filler board 20.00 mm thick as per directon of engineer in charge.

55.71

-

-

... More
S/L NP2 pipe 600mm dia for darin diversion with cost of all material and labour etc. as per direction of Engineer - in -charge

45

-

-

... More
E/w in constructing drain diversion manually or by any other means wherever possible and applicable escape of discharge upto 30 Cumecs and above 1 Cumec including hard clay/charri/ bajri upto 5%, lead upto 30 meters, lift upto 1.50 meters excluding mechanical compaction but including manual compaction & dressing to profile as per direction of engineer in charge

3223.5

-

-

... More
Earth work in clearance of Bund & Road Diversion with partial /rough dressing lead upto 30m & lift upto1.5m as per direction of engineer in charge

3333.1

-

-

... More
Dismantalling of old damaged VRB as directed by engineer-in- charge

3

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification as per direction of engineer in charge

336.48

-

-

... More
S/L of Tarfelt on bed block as directed by engineer-in- charge

66.3

-

-

... More
Painting of parapet and writing data on it as per direction of engineer in charge

117.55

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.