Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date9 Jan 2023
Closing Date18 Jan 2023
Tender Amount₹ 10,55,000
Costs
EMD
₹ 22,000Document Cost
₹ 266Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPIDC_765479_15Bid Award Id
ViewTender No
10/EE/2022-23Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Centering & Shuttering for R.C.C. work including cost of centering and shuttering up to 3 m height .As directed by the Engineer-in-charge
180
-
-
... More
Providing and Laying Reinforced Concrete M-20 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge
1.99
-
-
... More
Cutting, Bending, Binding cutting & Placing of reinforcement including binding wire also including cost of steel Fe 500.As directed by the Engineer-in-charge
3.3
-
-
... More
Local sand filling in making of sub-grade i/c cost of all labour,material and T&P etc.as directed by Engineer- in-Charge.
4.5
-
-
... More
Dry Stone pitching hand packed including labour and T&P also including cost of all material as directed by the Engineer-in-charge
3.5
-
-
... More
Finishing walls with exterior emulsion paint of required shade in two coat i/c supply of all labour,material and T&P required for proper completion of work.as directed by the Engineer-in-charge
13.5
-
-
... More
Supplying & fixing PVC Pipe 75 mm dia with all cost of material,labour and T.& P. etc. complete.as directed by the Engineer-in-charge
4
-
-
... More
E/W in filling for making bundha, diversion and embankment in ordinary soil.excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer- in-Charge.
210
-
-
... More
Filling empty cement bag with local earth hand sewing with suja and suthali and & placing in position withing 60m royalty etc.as directed by Engineer- in-Charge.
1000
-
-
... More
Hiring of diesel pumps 5HP including operator POL and maintinence for surface dewatering as directed by the Engineer-in-charge
10
-
-
... More
Earth work in cutting for removing Bundhas.and cleaning the internal section of canal with proper disposal as per direction in Engineer- in-charge
200
-
-
... More
Information Sign Board with painting latter and writing.
1
-
-
... More
supplying & fixing Hume Pipe 900 mm dia with collar with all cost of material,labour and T.& P. etc. complete.as directed by the Engineer-in-charge
2.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements