Irrigation Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Eprocure
Opening Date30 Jan 2025
Closing Date4 Feb 2025
Tender AmountRefer Documents
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPIDC_999884_1Tender No
01/EE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
QUOTATION FOR DIFFERENT ITEMS WORK FOR MUSEUM AREA AT PANDIT DEEN DAYAL MUSEUM AT LUCKNOW
BOQ Items
... More
Low Side
Refrigerant Piping
Supply, installation , testing and commissioning of Interconnecting refrigerant copper pipe work suitable for R-410A refrigerant with (19mm / 13mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room.All piping shall be properly supported with MS,GI STUDS / CLAMPS / HANGERS. All piping shall be pressure tested for 1.5 times the working pressure. The refregerant pipes running in vertical shaft shall be supported on MS angle and wooden saddle at every 1200 mm distance and the pipes which are running horizontally above the false ceiling should be supported on MS angle/slotted angle at every 1200 mm distance. (MAKE :- MANDEV, MEXFLOW)
22.2 mm
1
-
-
... More
Low Side
Refrigerant Piping
Supply, installation , testing and commissioning of Interconnecting refrigerant copper pipe work suitable for R-410A refrigerant with (19mm / 13mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room.All piping shall be properly supported with MS,GI STUDS / CLAMPS / HANGERS. All piping shall be pressure tested for 1.5 times the working pressure. The refregerant pipes running in vertical shaft shall be supported on MS angle and wooden saddle at every 1200 mm distance and the pipes which are running horizontally above the false ceiling should be supported on MS angle/slotted angle at every 1200 mm distance. (MAKE :- MANDEV, MEXFLOW)
19.1 mm
1
-
-
... More
Low Side
Refrigerant Piping
Supply, installation , testing and commissioning of Interconnecting refrigerant copper pipe work suitable for R-410A refrigerant with (19mm / 13mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room.All piping shall be properly supported with MS,GI STUDS / CLAMPS / HANGERS. All piping shall be pressure tested for 1.5 times the working pressure. The refregerant pipes running in vertical shaft shall be supported on MS angle and wooden saddle at every 1200 mm distance and the pipes which are running horizontally above the false ceiling should be supported on MS angle/slotted angle at every 1200 mm distance. (MAKE :- MANDEV, MEXFLOW)
15.9 mm
1
-
-
... More
Low Side
Refrigerant Piping
Supply, installation , testing and commissioning of Interconnecting refrigerant copper pipe work suitable for R-410A refrigerant with (19mm / 13mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room.All piping shall be properly supported with MS,GI STUDS / CLAMPS / HANGERS. All piping shall be pressure tested for 1.5 times the working pressure. The refregerant pipes running in vertical shaft shall be supported on MS angle and wooden saddle at every 1200 mm distance and the pipes which are running horizontally above the false ceiling should be supported on MS angle/slotted angle at every 1200 mm distance. (MAKE :- MANDEV, MEXFLOW)
12.7 mm
1
-
-
... More
Low Side
Refrigerant Piping
Supply, installation , testing and commissioning of Interconnecting refrigerant copper pipe work suitable for R-410A refrigerant with (19mm / 13mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room.All piping shall be properly supported with MS,GI STUDS / CLAMPS / HANGERS. All piping shall be pressure tested for 1.5 times the working pressure. The refregerant pipes running in vertical shaft shall be supported on MS angle and wooden saddle at every 1200 mm distance and the pipes which are running horizontally above the false ceiling should be supported on MS angle/slotted angle at every 1200 mm distance. (MAKE :- MANDEV, MEXFLOW)
9.5 mm
1
-
-
... More
Low Side
Refrigerant Piping
Supply, installation , testing and commissioning of Interconnecting refrigerant copper pipe work suitable for R-410A refrigerant with (19mm / 13mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room.All piping shall be properly supported with MS,GI STUDS / CLAMPS / HANGERS. All piping shall be pressure tested for 1.5 times the working pressure. The refregerant pipes running in vertical shaft shall be supported on MS angle and wooden saddle at every 1200 mm distance and the pipes which are running horizontally above the false ceiling should be supported on MS angle/slotted angle at every 1200 mm distance. (MAKE :- MANDEV, MEXFLOW)
6.4 mm
1
-
-
... More
Refrigerant Piping Y-Joints or Headers as required to connect the above outdoor units and indoor units. (MAKE :- DAIKIN, BLUESTAR, MITSUBHISHI)
Supply of "Y"-Joint Indoor unit
1
-
-
... More
Refrigerant Piping Y-Joints or Headers as required to connect the above outdoor units and indoor units. (MAKE :- DAIKIN, BLUESTAR, MITSUBHISHI)
Supply of "Y"-Joint Outdoor unit
1
-
-
... More
Low Side
Control Wiring
Supply, installation, testing and commissioning of 2C x 1.5 sqmm control cum transmission wiring/power/control cabling with PVC insulated, PVC sheathed, multicore copper conductor control cable in suitable conduits between indoor and outdoor units and its remote controllers. (MAKE :- ANCHOR, HAVELS, RR)
1
-
-
... More
Drain Piping
Supply, installation , testing and commissioning of Hard PVC drain piping of complete with "U" trap fittings and elbows from the Indoor unit point to the nearest drain point complete with fittings, supports, valve and 6 mm thick closed nitrile rubber foam insualtion as per specifications & drawings. (MAKE :- PRINCE, SUPREME, ASTRAL)
50 MM
1
-
-
... More
Drain Piping
Supply, installation , testing and commissioning of Hard PVC drain piping of complete with "U" trap fittings and elbows from the Indoor unit point to the nearest drain point complete with fittings, supports, valve and 6 mm thick closed nitrile rubber foam insualtion as per specifications & drawings. (MAKE :- PRINCE, SUPREME, ASTRAL)
40 MM
1
-
-
... More
Drain Piping
Supply, installation , testing and commissioning of Hard PVC drain piping of complete with "U" trap fittings and elbows from the Indoor unit point to the nearest drain point complete with fittings, supports, valve and 6 mm thick closed nitrile rubber foam insualtion as per specifications & drawings. (MAKE :- PRINCE, SUPREME, ASTRAL)
32 MM
1
-
-
... More
Drain Piping
Supply, installation , testing and commissioning of Hard PVC drain piping of complete with "U" trap fittings and elbows from the Indoor unit point to the nearest drain point complete with fittings, supports, valve and 6 mm thick closed nitrile rubber foam insualtion as per specifications & drawings. (MAKE :- PRINCE, SUPREME, ASTRAL)
32 MM
1
-
-
... More
Supply, Installation, Testing and Commissioning of flexible canvass cloth connection at oulet of each Ducted Indoor Unit with zipper to facilitate temperature measurement
1
-
-
... More
Supply, Installation, Testing and Commissioning of flexible canvass cloth connection at oulet of each Ducted Indoor Unit with zipper to facilitate temperature measurement
1
-
-
... More
Dome work 12mm thick polycarbonate sheet including aluminium fitting top & bottam, rubber sheet etc. complete
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements