Irrigation Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Construction Material
Eprocure
Opening Date7 Mar 2025
Closing Date12 Mar 2025
Tender Amount₹ 2,98,00,000 
Notes
Download

AI Insights

Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender is category "A" or above, as registered in the relevant department.
Bid Capacity
... View More
The bid capacity required in the given tender to bid having value and formulas is as follows: 1. Turnover: The bidder should have an average annual financial turnover of at least 30% of the COST OF WORK (without G.S.T) during the last 3 years, ending 31st March of the previous financial year 2024. Formula: Average Annual Turnover ≥ 0.3 * COST OF WORK (without G.S.T) 2. Financial Soundness (Profitability): The bidder should submit audited financial statements, including Balance sheet and Profit & Loss A/c, supported by Income Tax Returns for the last 3 financial years. 3. Similar Work Experience: The bidder should have executed similar work, with a value of at least: - 40% of the estimated cost for three similar completed works - 50% of the estimated cost for two similar completed works - 80% of the estimated cost for one similar completed work Formulas: - 3 * Similar Work Value ≥ 0.4 * Estimated Cost - 2 * Similar Work Value ≥ 0.5 * Estimated Cost - 1 * Similar Work Value ≥ 0.8 * Estimated Cost Additionally, the Assessed available Bid capacity as per formula (2AN-B) should be greater than the Estimated Value of the work, where A = Maximum Value of Civil Engineering works executed in any one year during the last Five years, N = Number of years prescribed for completion of the works, and B = Value of existing commitments.
Technical Capacity
... View More
The required prior work experience for the bidder includes having successfully completed similar nature of civil works during the last 7 years. The specific requirements are: - Three similar completed works costing not less than 40% of the estimated cost, - Two similar completed works costing not less than 50% of the estimated cost, or - One similar completed work costing not less than 80% of the estimated cost. The experience will be updated by giving 8% simple weightage per year to bring them to the current financial year price level. Additionally, the work experience certificate should not be issued below the rank of Executive Engineer.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying & Laying stone boulder in launching apron With G.I.wire crate size 2.00x1.50x1.00 and mesh size 20x20 cm per Cum. including cost of all materials, all lead and lift, T&P as directed by site incharge.

675

-

-

... More
RelayIng of recover stone boulder from old cutter including cost of all mterials, all lead and lift, T&P as directed by site incharge. GI wire crates.

675

-

-

... More
Supplying & Laying 8 SWG G.I Crate (heavy coated) in launching apron With G.I.wire crate size 2.00x1.50x1.00 and mesh size 20x20 cm per Cum. including cost of all mterials, all lead and lift, T&P as directed by site incharge.

450

-

-

... More
Supplying & Laying Geotextile sheet made of 240 G.S.M. woven multifilament polypropylene yarn below Geo-bag pitching including cost of all material, T&P as directed by site incharge.

2900

-

-

... More
Supplying & Laying Local sand cover as a filter over Geo Textile Sheet & below Geo-bag pitching on slope including cost of all material, T&P as directed by site incharge.

436

-

-

... More
Supplying & Laying of Geo bag (size 1.00x0.75) for slope pitching including cost of all material ,labour,T&P etc Complete

1453

-

-

... More
Providing & laying PCC in 1:3:6 CM with coarse sand & stone agregate in 20 to 40 mm size For Rain chute including cost of all material ,labour,T&P etc.

28

-

-

... More
Centering & shuttering for Concrete work including cost of all material ,labour,T&P etc.

70

-

-

... More
Ist Class Brick Work in Cement Mortar 1:4.with coarse sand including cost of all material ,labour,T&P etc.

38

-

-

... More
12.50 mm thickCement Plaster in 1:4 CM with coarse sand including cost of all material ,labour,T&P etc.

360

-

-

... More
Supply & Laying R.C.C. Porcupine of size 3.00 x 0.10 x 0.10 m including cost of filled empty area with jhankhar and all materials, all lead and lift, T&P, etc. complete. as directed by site incharge. as per site incharge.

255

-

-

... More
Supplying, carriage, cutting, bending, binding & placing steel reinforcement including cost of all materials, labour, T&P etc required for proper completion of work. (10 mm dia. @ 0.62/kg )

235

-

-

... More
Providing & Laying RCC 1:1.5:3 including cost of all materials, labour, T&P etc required for proper completion of work.

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.