If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Eprocure
Opening Date19 Feb 2021
Closing Date25 Feb 2021
Tender Amount₹ 7,89,718 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 18,000Document Cost
₹ 766Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UPIDC_552373_13Bid Award Id
ViewTender No
08/EE/2020-21Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation in foundation in all type of soil i/c lift upto 1.50 m & lead upto 30 m & including filling, watering & ramming excavated earth into the trenches or into the space between the structure & the side of foundation trenches or into the plinth with removal & disposal of surplus earth as directed by the Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
49
-
-
... More
Laying C.C. 1:3:6 with stone ballast i/c cost of all material, labour,T&p etc. but excluding cost of centring & shuttering for proper completion of work.
9.7
-
-
... More
Centering and shuttering of R.C.C. work i/c all labour, T&P etc. for proper completion of work.
116
-
-
... More
Supply & laying Steel reinforcement i/c bending ,binding, cutting, placinf of reinforcement i/c cost of bindidng wire but including cost of all material, labour, T&P etc. for proper completion of work.
4
-
-
... More
Laying of R.C.C 1:1½:3 with stone ballast i/c cost of all material, labour & T&P etc but excluding cost of centring & shuttering and steel etc. for proper completion of work.
52
-
-
... More
Earth Work in embankment in all type of soil including ramming & dressisng the surface to the reqiired level, slopes & aslo including lift upto 1.50 m & lead upto 1.00 km. i/c cost of earth. The earth from cutting to be used in side embankment or to be disposed off spoil bank or as directed by Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
130
-
-
... More
R.R. Stone masonery i/c cost of all meterial , labour , t&p etc & proper completion of work.
15
-
-
... More
Laying Boulder Pitching with 20 to 40 kg. dry boulder i/c cost of material, labout, t&P etc complete.
36
-
-
... More
C.C Grouting in 1:3:6 i/c cost of material, labout, t&P etc complete.
122
-
-
... More
Providing & fixing of sign board i/c writing all material labour ,t&p etc complete.
1
-
-
... More
Finishing wall with water proof cement paint of approved qualityon new work with two coat to give an even shade i/c supply of all material, labour, Tools & plant etc. required for proper completion of work.
38
-
-
... More
Providing & fixing of Wheels guard i/c carriage up to 8 km with all material labour ,t&p etc complete.
4
-
-
... More
Writing letter on parapet of Bridge upto 10 cm height i/c cost of all material. labour T&P etc. complete.
60
-
-