Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Paints and Enamels
Eprocure
Opening Date25 Mar 2021
Closing Date30 Mar 2021
Tender Amount₹ 13,94,615 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 33,820Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UPIDC_573615_1Bid Award Id
ViewTender No
07/E.E/2020-21Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
E/W in foundation including all lead, lift, labour,. complete as per direction of Engineer in charge.
326.82
-
-
Laying P.C.C. M-10 (1:3:6) Grade conc. With 20 to 40 mm S.S.B. in foundation including cost of material, labour etc. complete as per direction of Engineer in charge.
30.92
-
-
Ist class B/W in 1:4 C.M. including cost of material, labour etc. complete as per direction of Engineer in charge.
46.12
-
-
Ist class B/W in 1:3 C.M. in Pier including cost of material, labour etc. complete as per direction of Engineer in charge.
26.66
-
-
Providing Steel Reinforcement and cutting bending, binding including all cost of labour material & T&P etc.
2.1
-
-
R.C.C. M-20 with stone grite 10 to 20mm. Size, cement and course sand including cost of labour material etc. complete as per direction of Engineer in charge.
34.67
-
-
Centering & Shuttering including cost of material, labour etc. complete as per direction of Engineer in charge.
78.14
-
-
P/F stone wheel guard with material and labour etc.
4
-
-
E/W in strengthening R/B and Daula with all lead all lift, complete as per direction of Engineer in charge.
1148.75
-
-
Suppling and Fixing 75mm. Dia P.V.C. pipe for weep holes & rain water including cost of labour material etc.
13.2
-
-
Dewatering by hiring 5H.P. diesel pumps including operator & P.O.L. complete as per direction of Engineer-in-charge
960
-
-
Supplying and Fixing Sign Board For Information Fabricated with steel angles,flats and plates including all material,labour T&P etc. complete As per direction of Engineer-in-charge.
2
-
-
Preparation of subgrade for lining work including all labour,materials T&P etc. complete.
150
-
-
Ist class brick on edge lining in 1:3 C.M. work laid on 4 mm thick bace plaster including all labour,materials T&P etc. complete.
150
-
-
Deep struck cement pointing work in 1:2 C.M. including all labour,materials T&P etc. complete.
301.1
-
-
P/F joint filler board in expansion joints of 20mm thick including cost of labour material etc. complete as per direction of Engineer in charge.
30.88
-
-
Dry stone boulder pitching work including all labour,materials T&P etc. complete.
58.8
-
-
P/Laying M-20 Grade conc. With 10 to 20 mm stone gritt in water wing and wearing coat including cost of material, labour etc. complete as per direction of Engineer in charge.
10.16
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements