Inland Waterways Authority Of India Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Inland Waterways Authority Of India - IWAI Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 May 2024
Closing Date30 May 2024
Tender Amount₹ 4,44,18,186
Costs
EMD
₹ 8,88,364Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Construction Of Compound Wall Along The Boundaries Of Land Acquired For The Projects Of Extension Of Mmtand Freight Village At Varanasi In Nw1
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWAI_806273_1Bid Award Id
ViewTender No
IWAI/NW-1/JMVP/Misc/2023-24Tender Authority
Inland Waterways Authority Of India ViewPurchaser Address
-Website
http://https://iwai.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying in position R.C.C. in CC 1:2:4, 65 cm thick for grade beam above PCC for foundation footing of the compound wall excluding the cost of cantering, shuttering, and finishing as per the directions of E-I-C. The rate shall include cost of all materials, transportation, labour charges etc. complete.cost and conveyance of all materials and in
1048.04
-
-
Providing and laying in position R.C.C. in CC 1:1½:3, 20 cm thick for capping beam / belt above RCC footing of the compound wall excluding the cost of cantering, shuttering, and finishing as per the directions of E-I-C. The rate shall include cost of all materials, transportation, labour charges etc. complete.
313.02
-
-
Steel reinforcement for RCC grade beam and capping beam including straightening, cutting, bending, placing in position and binding all complete as per the drawing and specification
86716.97
-
-
Cantering & shuttering including strutting, propping etc. for grade beam and capping beam at ground level including cost of all materials, labour charge and removal of form work etc., complete as per the directives of the Engineer - in – Charge
6048.24
-
-
Brick work in cement mortar 1:6 for re-construction of compound wall of width 23 cm with modular bricks & each layer of brick must be placed in proper alignment and plumb as per the directions of Engineer - In - Charge including cost of materials, transportation, fixing in position, scaffolding and labour charges etc. complete.
1493.22
-
-
Plastering in CM 1:4, 12 mm thick on Rubble masonry, brick masonry and pillars including cost of materials, labour, finishing, curing etc. complete.
13534.05
-
-
Applying priming coats on newly constructed portion of compound wall with primer of approved brand and manufacture, with water thinnable cement primer on wall surface having VOC content less than 50 grams/litre
13534.05
-
-
Painting with weather shield smooth exterior paint two or more coats applied @ 1.43 ltr/ 10 sqm over new work of compound wall and kerb wall as per directions of E-I-C.
13534.05
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements