Indian Oil Adani Gas Private Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Indian Oil Adani Gas Private Limited - IOAGPL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date23 Jul 2024
Closing Date1 Aug 2024
Tender AmountRefer Documents
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AGPL_202266_2Bid Award Id
ViewTender No
IOAGPL/PE/OPEN/2024-25/35Tender Authority
Indian Oil Adani Gas Private Limited ViewPurchaser Address
-Website
http://https://ioagpl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Route survey of allotted areas and Preparation /Submission of detailed route plan for approval by EIC in AutoCAD format. Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes & fittings and other free issue items from IOAGPL designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Proper storing, stacking, identification, providing security and insurance cover for the materials. Making trial pits to determine the underground utilities/ services etc., restoration of the abandoned excavation/ trial pits (excavated to depth of 1.00 m or more as per satisfaction to EIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / Site-in-charge; uncoiling / stringing of pipes, jointing of the pipe ends/ fittings / Transition fittings/ valves by qualified personnel, using approved electro fusion techniques as per specification.. Entire work shall be executed as per scope of work, specification, PNGRB T4S and/or any other specification as per requirement of statutory authorities.
-
-
-
... More
Installation of Gl sleeves, 2.5" NB x 300 mm length pipe sleeve/ half round concrete sleeves for domestic connections, 3" NB x 300 mm length Gl sleeve for commercial and industrial installations, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves/RCC Half Round Guard with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of 20/32 mm dia MDPE pipe as defined in scope of work, technical specification and instruction of ElC/ SIC.
-
-
-
... More
Carrying out GIS Data Collection & Entry at every 12 meters, Pipe fittings / Cut Points /Joints/Crossings/Valves/SR etc. (Latitude / Longitude) With attributes as per satisfaction of Owner and / Or as directed by Engineer I/C.
Submission of Data in the GIs format of. Shp,. Kml. Accuracy of the collection of assets / Cut points/ Joints to be in accuracy to be maintained 30cm -60cm.
Using Hardware Components like
- GNSS Receiver’s - Arrow 100 GNSS Receiver / Spectra Precision Sp20 Receiver / Trimble R2 / Trimble R1 Receiver having Capability to get submeter accuracy 30cm -50cm or better with Indian SBAS-GAGAN Satellite or RTK in Real-time along with Field replaceable Battery in the device.
Software Components - Data collection via Mobile application: To digitize the collection of data during
construction and provide real-time data in the field.
-
-
-
... More
Flushing, cleaning, pneumatic testing, purging with nitrogen and commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect liability period.
-
-
-
... More
Handing over the completed works to owner for their operation/ use, returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate.
-
-
-
... More
On completion of gas charging of pipelines, preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.
-
-
-
... More
In case more than 1 MDPE pipelines are laid in a common trench, SOR rate of higher dia plus 1/3rd SOR rate of lower dia will be paid.
-
-
-
... More
MDPE pipeline laying in normal soil with all type of surface by open trench methodology
-
-
-
... More
MDPE pipeline laying in normal soil with all type of surface by open trench methodology by maintaining clear top cover of minimum 1.0 m from the pipeline.
-
-
-
... More
20 mm Dia- O&M Area/ Charge Area
100
-
-
... More
32 mm Dia- O&M Area/ Charge Area
500
-
-
... More
63 mm Dia- O&M Area/ Charge Area
100
-
-
... More
MDPE pipeline laying in normal soil with all type of surface by moling methodology without HDPE casing pipe
-
-
-
... More
MDPE pipeline laying in normal soil with all type of surface by moling methodology without HDPE casing pipe by maintaining clear top cover of minimum 1.0 m from the pipeline.
-
-
-
... More
20 mm Dia- O&M Area/ Charge Area
100
-
-
... More
32 mm Dia- O&M Area/ Charge Area
2000
-
-
... More
63 mm Dia- O&M Area/ Charge Area
100
-
-
... More
Excavation for MDPE pipeline in hard surfaces
-
-
-
... More
Breaking of RCC Structure including removal and disposal of the excavated material to the safe location- O&M Area/ Charge Area
300
-
-
... More
Testing and commissioing of previouly laid Pipeline
-
-
-
... More
Scope include mobilization of manpower and resources at site, exposing ends of previouly laid pipeline (All Dia),survey of the underground utilities, intimation to all other utility agencies through owner, arranging necessary tools and tackles for testing, testing as per T4S guidelines,repair of damage points if any, N2 purging and commissioning of segment,Submission of as built drawing, as per direction and satisfaction of EIC
-
-
-
... More
Testing, repair and commissioing of previouly laid Pipeline (Upto 63 mm)- O&M Area/ Charge Area
1000
-
-
... More
Restoration of trenches
-
-
-
... More
Restoration to original conditions surface like bituminous/ asphalted road, concrete pavement, RCC pavements, tiles/ slabs/ blocks/ curb stones/ Agra/ Kota stones (chequered/ interlocking etc.), brick lining/ channels pavement as per the scope of work, technical specifications after laying of pipeline in built-up surface, as per the directions of EIC/SIC. Scope includes providing of the approved quality material, testing of materials by third party agencies as per scope of work, technical specification/ CPWD/ IRC standards, submission of the restoration reports, obtaining no objection certificates from the concern local authorities/ statutory authorities/ land owners/ third party inspection agencies designated by land owing agencies and owner.
-
-
-
... More
EIC,asset to provide cross section details of the trench as per statutory agency for restoration as detailed below
Restoration for all trenches shall be carried out as per PWD (kerela) Specification irrespective of nature of road.
-
-
-
... More
BM&BC- O&M Area/ Charge Area
100
-
-
... More
Interlocking Tiles- O&M Area/ Charge Area
2000
-
-
... More
Concrete Surface- O&M Area/ Charge Area
300
-
-
... More
Fabrication & installation of pipeline markers
-
-
-
... More
Fabrication and installation of pipeline RCC route markers/ steel pole markers/ steel plate markers as per the scope of work, specification & PNGRB T4S along the route/ boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, application of approved color and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per scope of work, specification, PNGRB T4S and instructions of EIC/ SIC.
-
-
-
... More
RCC route markers- O&M Area/ Charge Area
80
-
-
... More
Steel pole markers with foundation- O&M Area/ Charge Area
10
-
-
... More
Liasioning with Land Agencies for permission (Optional) bidder will not have any right to claim this amount unless it has been approved in advance by the HO.This line item is optional and IOAGPL’s right. This line item is entirely up to IOAGPL's discretion.
-
-
-
... More
Submission of applications as per approved drawings provided by owner (Initial route survey, preperation of drawings, measuring and providing details of surface type shall be in scope of contractor with approval from owner), obtaining & submission of demand note, coordination, liaisoning, obtaining written permissions from land owing agencies like municipal corporation, PWD, development authority, NHAI, railways and any other government agencies who maintains the public lands. These rates are not applicable for private lands i.e. apartments/ institutions etc.
-
-
-
... More
MDPE pipeline of all sizes- O&M Area/ Charge Area
3000
-
-
... More
GI SECTION
-
-
-
... More
Installation of GI service pipe & fittings
-
-
-
... More
Survey of designated area and survey drawings of societies / colonies/ localities shall be provided by the contractor. installation of GI fittings like elbows, tees, unions, sockets, reducers, GI plugs,any other GI fittings, adopter for appliance valves & Anaconda, Domestic Adoptor, GI Sleeves, RCC Crimping Guard, Meter clamp & Pipe clamps etc. as required to complete the job including supply of all consumables like Teflon tape, soldering consumables, flux application and all other required material to complete the job. Excluding only Supply of GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves, & GI fittings which shall be issued by Owner as FIM.
-
-
-
... More
Receiving and taking-over as defined in the scope of work & specifications, handling, loading, transportation and unloading of owner supplied GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves, GI fittings and other free issue items from owner's designated place(s) of issue to contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication, consumables, labour and other incidental works and handing over the same after return of the surplus pipes, fittings, valves & other accessories to the owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work and other provisions of contract document and instructions of EIC/ SIC, including but not limited to carrying out the following:
-
-
-
... More
Preparation and approval of schedules, execution procedures, sketches
-
-
-
... More
Finalization of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. A tentative sketch shall be prepared and shall be signed by customer, contractor & SIC/ TPIA
-
-
-
... More
Making temporary but stable platforms/ scaffolding / rope ladders and all other safety devices
-
-
-
... More
Installation of Powder Coated GI Pipes & Fittings, Isolation & Appliance Valves including NPT/BSPT threading, Anaconda, Suraksha Hose etc.. painting as specified including installation of regulators and meters.
-
-
-
... More
Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through wall /tiles / wood/ marble/ Granite etc jointing of PE to aboveground service GI pipes, testing, purging and commissioning of the complete installation.
-
-
-
... More
Touchup/ Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original by cleaning/ touching of corresponding paint to original as per instructions & to satisfaction of the owner. Preparation of laying records, meter reading etc. Reconciliation of free issue material.
-
-
-
... More
Drilling of holes through walls with proper heavy duty hammer drill Machine, tools & tackles, using proper sealant/ grout material & colours to match original, replacement of damages during drilling, restoring the area to original condition to the satisfaction of Owner/ EIC & as per specification for 1/2" & 1" NB in brick wall and RCC wall. PVC sleeve with proper sealant to be provided in the drilled section to protect GI pipe.
-
-
-
... More
All above activities to be carried out as per scope of work, specifications and to the complete satisfaction of consumer & EIC/ SIC.
-
-
-
... More
Handing over the completed works to owner for their operation/ use, returning of all free issue surplus material to owner stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from owner/ EIC/ SIC/ TPIA
-
-
-
... More
Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule at no extra cost to owner
-
-
-
... More
Arrangement of all tools, tackles and consumables required to execute the work in an efficient manner.
-
-
-
... More
In case of independent house with single connection, Riser isolation valve can be considered as lateral isolation valve.
-
-
-
... More
NON LMC
-
-
-
... More
Installation, testing & commissioning of powder coated GI riser of 1” & ½” from TF to Riser Isolation Valve, from Riser Isolation Valve upto lateral Isolation Valve by providing plug at all levels upto all floors including supply and fixing of all type of pipe supports/ clamps/ brackets.
-
-
-
... More
Installation of Welded powder coated GI/ MS riser at all length in buidlings above 8 floors and confined spaces like basements by using forged fittings confirming to IS 1239 - Part 2, duly polyester powder coated with 70 micron thickness. GI pipe & required fittings shall be first coupled with threaded joint. Teflon/PTFE tape should not be used in threaded joint for welded riser. Alternatively, plain ended pipes and fittings can also be used for welding in welded riser.The entire riser shall be constructed with SOCKET weld only, threaded joints are permitted only on the laterals on account of workability & for future maintenance only. The electrodes (Welding Rods) used for welding on risers shall be of E 6013 grade & 2.5mm thickness of reputed make used for industrial application. The Vendor is required to provide the Batch Test Certificate (TC) for the electrodes. The Weld joint shall be thoroughly cleaned with wire brush and examined visually for its quality. Welding shall be free from defects like porosity, crack, undercut, incomplete fusion etc. Spatter, slag must be removed from pipe.
-
-
-
... More
Installation of Common Ring/ Header of Powder coated GI Pipe/MS Pipe in Basement/ Terrace of the High Rise Building.
-
-
-
... More
Installation of powder coated GI pipe/MS Pipe (Horizontal/ Vertical) in Flats & Bulidings.
-
-
-
... More
Installation of 1/2" powder coated GI pipe(Threaded)- O&M Area/ Charge Area
9000
-
-
... More
Installation/Fixing of Commercial/Non-Commercial meter and regulator with associated inlet & outlet connections fittings,anaconda,valves. Using approved meters & regulator brackets and other supports by proper scaffolding/grouting. Restoring the area/walls to original condition as per specification and to complete satisfaction of consumer and EIC. - O&M Area/ Charge Area
10
-
-
... More
LMC
-
-
-
... More
Installation, testing & commissioning of 1/2" Powder Coated GI pipe & Fittings with Installation of lateral isolation valve (included) at all length after lateral isolation valve along with installation of regulator, meter with associated inlet & outlet connections/ fittings/ anaconda, supply and fixing of approved meter brackets and other supports upto Appliance Valve (excluded). Installation of Appliance Valve is covered in Conversion of Domestic Appliances.
-
-
-
... More
Installation of 1/2" Powder Coated GI pipe & Fittings at all length from lateral isolation valve up to appliance valve/gas tap along with meter & regulator installation at domestic household for connecting PNG connection with GI Riser network with end Blind/cap/plug/ (included).
Note:- SOR can only be claimed if the complete work is done from LIV(RIV incase of single connection) to appliance valve including installation of meter and regulator)- O&M Area/ Charge Area
18000
-
-
... More
Conversion of Domestic Appliance
-
-
-
... More
Conversion of all types of LPG kitchen appliances to NG based appliances by installing appliance valve, suraksha hose of 1 meter, changing/ converting nozzles, jets and associated controls for domestic & imported appliances with proper tools & tackles.
-
-
-
... More
Cleaning and performing minor maintenance, greasing etc of appliance, testing/ showing performance to the customer, signing of joint meter records (JMR) and instructing customer on use & safety norms, complete as per scope of work, specifications & to the satisfaction of owner/ EIC/ SIC.
-
-
-
... More
2 Burner Stove- O&M Area/ Charge Area
2000
-
-
... More
3/4 Burner Stove- O&M Area/ Charge Area
500
-
-
... More
Geyser- O&M Area/ Charge Area
100
-
-
... More
INSTALLATION WORKS
-
-
-
... More
Construction of Foundation & Installation of DRS/ MRS/ Metering Skid/ Service Regulator
-
-
-
... More
Receiving and taking over, handling, loading, transportation and unloading of DRS/ Service Regulator/MRS/ Metering Skid from owner's designated stockyards to site, installation and hooking up with Steel & MDPE pipe.
-
-
-
... More
Installation of DRS with RCC pedestal, foundation and Structural Works. Providing and laying reinforced cement concrete of grade M-20 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers, columns, equipment, foundation, etc. including providing fencing with gate wherever required.
-
-
-
... More
Hook up from the existing steel tapping to DRS inlet and installation of all the items like pipe, fittings, valves, etc. supplied as FIM by owner as per the directions of the EIC/ SIC.
-
-
-
... More
Supply of all materials, fabrication and erection of chain link fencing 2.5 m high with mesh upto 2 m height providing proper bracing & supprots at safe intervals and barbed wire fencing complete in all respect including painting as per technical specification on all steel items, all works as per specification including foundations and RCC beams. The fence shall be suitably earthed as per the IS 3043.The Earthing pit also to be constructed as per the required specification.
-
-
-
... More
Supply fabrication and erection of all types of pipe supports like clamps, saddle, guide, stops, cradles, neoprene sheet, turn buckles, anchors, T-posts, stockade/ trestle and pipe bridge for overhead piping, frames for canopy, approach ladders and platforms, crossover, cable tray supports etc, including painting suitable for highly corrosive area as per specification, labour and supervision & complete work as per drawing, specifications and instructions of EIC/ SIC.
-
-
-
... More
All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with time schedule, are deemed to be included in the quoted rates.
-
-
-
... More
The DRS/ MRS shall be suitably earthed as per the IS 3043.The Earthing pit also to be constructed as per the required specification.
-
-
-
... More
Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the contractor within the rate quoted.
-
-
-
... More
Rate quoted in SOR shall include cost of all labour, tools, tackles, equipment, hire charged etc. This is a lump sum item rate and shall not be measured & paid separately
-
-
-
... More
Service Regulator installation, Foundation Size approx. (800 mm x 500 mm x 600 mm)- O&M Area/ Charge Area
8
-
-
... More
Leakage rectification, testing & commissioning of GI pipe
-
-
-
... More
Leakage rectification, testing & commissioning of 1" & 1/2" Powder Coated GI pipe & Fittings at all length from transition fitting to appliance valve along with testing of all pipe length upto appliance valve along with regulator, meter with associated inlet & outlet connections/ fittings. (This applicable only in cases where leakge has been observed in uncharged GI pipes riser & lateral which is installed more than 1 year ago or left out contrctors but could not be commissioned with Gas.
-
-
-
... More
Leakage rectification, testing & commissioning of 1/2" GI Pipe forincluding fixing of GI Elbow , Coupling, Tee, Nipple, Union, Reducer, clamp etc - O&M Area/ Charge Area
700
-
-
... More
MDPE Service Line laying in old Projects / O&M areas
-
-
-
... More
Includes laying of pipeline (for 20mm) in all type of surface i.e. Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick
lined etc. after breaking up of hard surface by Open Cut/Moling . Roads, Pavement, Footpaths etc. shall be made
motorable once the pipeline is laid. Supply & installation of GI Sleeve shall be included in laying
rates. All other activities mentioned in SOR no.1 are applicable.
Note:- Old Project area shall be defined as an area where MDPE line is already been laid by another contractor (currently not
working in respective zone), only service line connectivity shall be done by the contractor.
-
-
-
... More
For pipe length up to 5 meters- O&M Area/ Charge Area
1500
-
-
... More
Per meter rate for pipeline more than 5 meters ( Per meter additional rate shall be payable above SOR item no 190)- O&M Area/ Charge Area
500
-
-
... More
Dismantling & Installation of new GI for alteration/additional point/ Re-fitting of GI/ Replacement of equipment/fittings.
-
-
-
... More
Installation of new 1/2" GI Pipe, SOR rate to be paid for either actual or minimum 3 m length for services and materials whichever is higher.- O&M Area/ Charge Area
1000
-
-
... More
Dismantling of 1/2"/ 1" GIPipe - SOR rate to be paid for either actual or minimum 3 m length whichever is higher.- O&M Area/ Charge Area
1000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements