Indian Oil Adani Gas Private Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Indian Oil Adani Gas Private Limited - IOAGPL Tender
Civil And Construction
Eprocure
Opening Date7 Mar 2024
Closing Date25 Mar 2024
Tender AmountRefer Documents
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AGPL_190266_1Bid Award Id
ViewTender No
IOAGPL/OM/OPEN/2023-24/76Tender Authority
Indian Oil Adani Gas Private Limited ViewPurchaser Address
-Website
http://https://ioagpl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
MDPE damage recification/repair & maintenance work (upto 63 mm Dia)
-
-
-
... More
Scope inculdes attending MDPE leakage complaint (Up to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor
50
-
-
... More
MDPE damage recification/repair & maintenance work (above 63 mm Dia)
-
-
-
... More
Scope inculdes attending MDPE leakage complaint (above to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor
20
-
-
... More
MDPE Valve Chamber Cleaning, Maintenance, etc.
-
-
-
... More
Scope include deployment of manpower with all Tools, Tackles, Machinery, etc. (i.e. Mud Motor, Generator, etc) for cleaning of MDPE Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC.
120
-
-
... More
Attending Service Regulator leakage complaint, Repair, Maintenance, etc.
-
-
-
... More
Scope Include attending SR box leakage complaint, Reapair, Replacement, etc. within 30 min of complaint report time with all the tools, tackles and consumables, rectification of leakage, prepration of reprot as per format provided by IOAGPL. Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe, Fittings, Regulator, etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be contractor scope.Works shall be executed as per instruction and satisfaction of EIC/SIC.
100
-
-
... More
Patrolling of Steel & MDPE Network
-
-
-
... More
Scope Include: • To carry out emergency patrol, for the section / network vulnerable to damage due to sudden development of activities by other utilities.
• To wear PPEs like safety shoes, cotton dress and reflective jacket
• To carry out patrolling by driving the vehicle along the pipeline route, as per, as-built drawing, markers and valve chamber position, observing activities on pipeline as per check list, like excavation, construction, encroachment,
• To coordinate and monitor with external agencies working on charged network of IOAGPL as per permissions issued on pipeline route.
• To understand their work, extent of excavation and its potential hazard to underground gas pipeline
• To explain them, about the gas pipeline network / route and precautions to be taken to prevent damage to gas pipelines.
• To provide / update them with contact number and other details of IOAGPL authorised EIC for assistance.
• To collect details of their supervisor like contact number, address etc for further coordination
• To prepare report in standard format
• Report immediately any unusual developments or occurrences along a pipeline route which may have some effect on the normal operation or maintenance of the pipeline
24
-
-
... More
LPT of Network
-
-
-
... More
LPT of Steel/MDPE Network (per KM) - Upstream of Service Regulator
125
-
-
... More
LPT of LP Network (per SR/section) - Downstream of Service Regulator
70
-
-
... More
LDT of Network
-
-
-
... More
LDT of Steel/MDPE Network (per KM) - Upstream of Service Regulator
125
-
-
... More
LDT of LP Network (per SR/section) - Downstream of Service Regulator
70
-
-
... More
Post Commissioning Services
-
-
-
... More
Annual Maintenance Service
-
-
-
... More
Annual Maintenance of PNG
-
-
-
... More
AMC of PNG Domestic Connection including sand filling and cementing of RCC guard if required. (LPT, Anomalies identification, Leakage identification & rectification, Checking of service line, Painting touch up of GI pipe, RCC Guard, GI Clamp,Repalcement of Surakaha hose in case of damaged, expired for all Points etc.
1200
-
-
... More
AMC of PNG commercial/Non Commercial Connection.
(Anomalies identification, Leakage identification & rectification, checking of service line. Painting touch up of GI pipe as per IOAGPL EIC instruction, RCC Guard, GI Clamp replacement / installation as per EIC instruction, Repalcement of Surakaha hose if required IOAGPL EIC instruction if any in case of damaged, expired for all Points etc.
5
-
-
... More
Repainting of GI pipe, RCC Guard and GI Clamp of entire connection including supply of paint,
150
-
-
... More
Annual maintenance of vertical riser
-
-
-
... More
AMC of Vertical Riser including horizontal approach upto G+3 floors - including sand
filling and cementing of RCC guard if required.Painting touch up of GI pipe, RCC Guard, GI Clamp
5
-
-
... More
AMC of Vertical.Riser including horizontal approach each floor above 3rd Floor -.Painting touch up of GI pipe, RCC Guard, GI Clamp
12
-
-
... More
Re-painting of entire GI pipe on V.Riser "each floor" above 3rd Floor
12
-
-
... More
O&M services
-
-
-
... More
Replacement of equipment/fittings.
-
-
-
... More
Replacement of Dom., Com., Ind. Regulator/Diaphragm meter, Brass ball valve/Gas tap,
300
-
-
... More
Replacement transition fittings or RCC guard or both (Rates are excluding material charges)
50
-
-
... More
Replacement of Industrial / Commercial Meter- RPD
40
-
-
... More
IOAGPL supplied Suraksha Hose replacement including supply and installation of rubber
hose clamp-Domestic PNG connection- Other than identifed during domestic AMC
300
-
-
... More
Replacement of Domestic/Commercial Meter or Regulator "O" ring or Adaptor
200
-
-
... More
Installation of new GI for alteration/additional point (excluding
contractor supplied materials rates )/ Re-fitting of GI
-
-
-
... More
Installation of new 1/2" GI Pipe, SOR rate to be paid for either actual or minimum 3 m
length for services and materials whichever is higher..
500
-
-
... More
Installation of 1" new GI Pipe, SOR rate to be paid for either actual or minimum 3 m
length for services and materials whichever is higher.
100
-
-
... More
Supply & Installation of PVC Sleeve on GI Pipe with Insulation
50
-
-
... More
Installation of GI Pipeline Protection Clamp from door or window.
5
-
-
... More
Installation of only Rubber Tube Clamp
200
-
-
... More
Installtion of 1/2"new GI Powder Coated Clamp
300
-
-
... More
Installtion of 1"new GI Powder Coated Clamp
100
-
-
... More
Installation of Burner Jet
200
-
-
... More
Dismantling
-
-
-
... More
Dismantling of 1/2"/ 1" GIPipe - SOR rate to be paid for either actual or
minimum 3 m length whichever is higher.
1500
-
-
... More
Dismantling of Powder coated 1/2" / 1" GI Riser - SOR rate to be paid for either actual or
minimum 3 m length whichever is higher.
300
-
-
... More
Drilling of through Hole with Drilling Machine,
-
-
-
... More
Drilling of Hole in Brick / plastering
100
-
-
... More
Drilling of Hole in RCC
20
-
-
... More
Drilling of Hole in Others (Marble ,Granite etc.)
50
-
-
... More
Modification of RCC Guard
-
-
-
... More
Modification of RCC Guard with PE Squeezing
50
-
-
... More
Modification of RCC Guard without PE Squeezing
20
-
-
... More
Conversion of Burner
-
-
-
... More
NG Conversion charges for 2 burner
150
-
-
... More
NG Conversion charges for beyond 2 burner
20
-
-
... More
Installation of Marker
-
-
-
... More
Installation of RCC Route Marker incl PCC Foundation on PE Network
30
-
-
... More
Stenciling/repainting of existing marker
100
-
-
... More
Meter Reading
-
-
-
... More
Meter Reading - Comm / Non Commercial or Industrial customer for varification as and when required
50
-
-
... More
Meter Reading - Domestic customer for varification as and when required
50
-
-
... More
Civil work (including hard barricading)
-
-
-
... More
Supply & Lay PCC 1:2:4 for PNG O&M
5
-
-
... More
Supply & Lay RCC 1:1.5:3 Including Reinforcement for PNG O&M
5
-
-
... More
Sand Filling activity for Service Regualtor Module or PE Valve Chamber
8
-
-
... More
supply & Const. Brick work
5
-
-
... More
Supply & Const.Plastering
15
-
-
... More
Supply & Installation of structural steel Including fabrication
200
-
-
... More
Demolishing of existing Valve Chamber
5
-
-
... More
Dismantling of existing Transition Box/Service regulator of any size including PE connectivity.
Services includes supply of labour,Excavation,isolation of valves and pipe lines,Demolition of foundation and transportation of removed Service regulator module
to IOAGPL store/Place instructed by IOAGPL EIC
5
-
-
... More
Installation of IOAGPL Supplied Canopy of Service Regualtor Module of any size Including Transportation, Civil Foundation& painting,shifting of removed canopy to IOAGPL store/Place instructed by IOAGPL EIC
5
-
-
... More
Supply and Installation of Valve chamber sleeper - all sizes
10
-
-
... More
Installation of SR module
-
-
-
... More
Installation of SR Module B-10/25/50 Including Excavation,Required PE Material,Sand
filling and Civil work with Painting on Foundation.
10
-
-
... More
Regualtor Replacement in SR Module
15
-
-
... More
1'' Ball Valve replacement in SR Module
15
-
-
... More
Boundary Fencing (WIRE MESH) installation for DRS/CPRS/MRS/IMS/CGS including
supply of material
25
-
-
... More
Miscellaneous Jobs
-
-
-
... More
Installation IOAGPL supplied Gas tap and rubber tube installation
100
-
-
... More
Temporary Disconnection/Force disconnection for each house only Meter
200
-
-
... More
Permanent/Temporary/Force Disconnection for each house from PE or TF
100
-
-
... More
Reconnection for each house only meter
200
-
-
... More
Reconnection for each house from PE or TF without refitting in GI pipe
100
-
-
... More
Reconnection /Force Disconnectionusing Petzl for each house
10
-
-
... More
Installation of hollow hex plug
50
-
-
... More
Painting of Valve chamber & Valve including Inside White washing and strencilling on top
cover at three Locations- Top cover,Inside, Outside including paint and other materials needed
50
-
-
... More
Painting - including scraping /cleaning,one coat of epoxy zinc rich primer,Two coat of polyamide epoxy and two coat of acrylic polyurethene(PU Paint) including paint and
other materials needed
30
-
-
... More
Stencilling ---Letter writing including supply of Paint
50
-
-
... More
Lifting of RCC guard including Excavation, modification in PE line using 2 EF joints (1 for PE and another for TF), refittings of existing RCC guard
10
-
-
... More
MRS/IMS maintenance
-
-
-
... More
MRS/IMS maintenance including filtercleaning, Stainer cleaning,Valve replacement other than 110 mbar skid
100
-
-
... More
Replacement at IMS of below Items as & when required. 1)Meter
2)EVC
3)Battery
4)Modem & power supply.
20
-
-
... More
Dismantling of MRS/IMS (including transportation)
10
-
-
... More
Hiring of equipment
-
-
-
... More
Hiring of JCB for excavation
20
-
-
... More
Hiring of Hydra
10
-
-
... More
Hiring of Compressor for Flushing & testing
40
-
-
... More
Hiring of Tractor for shifting of excavated material
20
-
-
... More
PE pipeline shifting and lowering including Installation of Electrofusion fitting if any
-
-
-
... More
Installation of PE pipeline
Receiving, handling, loading, transportation and unloading including owner supplied PE pipes and Electro fusion Fittings from owner's designated stock yards. Proper storing, stacking, identification, providing security, and insurance cover for the materials. Liasoning with Landowning agencies / statutory authorities, , temporary restoration of the abandoned trial pits as required (excavation to depth as per specification ) to original condition. barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / site- incharge. Trenching to the required depth in all types of terrain, uncoiling / stringing of pipes, damping, jointing of the pipe ends/ fittings/ valves by qualified personnel, using bar coded electro fusion techniques as per specification.
Rates includes excavation as per tender specification and all contractor supplied material other than IOAGPL free issue material as mentioned in tender document in all types of terrain excuding rocky terrain.
-
-
-
... More
Inst, Test, Com of 90 mm, 110mm & 125mm ODXSDR 17.6
300
-
-
... More
Inst, Test, Com of 32 mm & 63mm OD, SDR 11 & 17.6
400
-
-
... More
Inst, Test, Com of 20 mm ODXSDR 9
200
-
-
... More
Hook up of PE with DRS/CPRS/DPRC/IMS feeder
2
-
-
... More
PE Pipe Line Testing & Flushing including supply of N2 (Applicable if water enters into
PE Pipe Line Section due to Third Party Damage), Rock & RCC Breaking, Boring - Manually & HDD, Ins. Of EF Fittings
-
-
-
... More
Flushing & Testing of PE Pipe Line - 32 MM to 63 MM
1000
-
-
... More
Flushing & Testing of PE Pipe Line - 90 MM to 160 MM
1000
-
-
... More
Excavation, Removal out of PE Pipeline
400
-
-
... More
Trenchless crossing for any pipe dia.-Manual Boring normal soil
200
-
-
... More
Breaking of PCC
30
-
-
... More
Breaking of RCC
20
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements