Indian Institute Of Toxicology Research Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Indian Institute Of Toxicology Research - IITR Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date10 Jun 2024
Closing Date1 Jul 2024
Tender Amount₹ 65,66,678
Costs
EMD
₹ 1,31,336Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSIR_197783_1Bid Award Id
ViewTender No
IITR/EME-17(08)/2024Tender Authority
Indian Institute Of Toxicology Research ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Insulated Valves: Supplying, fixing, testing and commissioning of following valves, strainers, gauges in the chilled ater plumbing duly insulated to the same specifications as the connected piping and adequately supported as per specifications.
Butterfly Valve (Mannual) with CI body SS disc nitrile rubber sheal & O-ring PN 16 pressure rating for chilled water/ hot eater circulation as specified
-
-
-
150 mm dia
2
-
-
80 mm dia
2
-
-
40 mm dia
8
-
-
Dismantling C.I pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 meter lead as per direction of Engineer-in-charge.Upto 150 mm diameter
878
-
-
SITC of FRP induced draft cross/ counter flow, 2 to 4 fan as required, direct / gear driven, site erected cooling tower of capacity as mentioned below based on the parameters given below and complete with PVC fill, Louver, Drift Eliminator, Wheather Proof IP 55 TEFC Motor (IE2), Propeller Fan, FRP Basin with additional sump in the condensor water pipe line, Hot dip galvanised steel ladder, stainless steel hardware, float valves, nut, bolt, washer etc complete as required. (a)Designed Wet Bulb Temperature -28.3 degree C (b)Water inlet/ Outlet Temperature - 36.38 degree C/ 32.22 degree C (c) Cooling Tower Basin Height - 300.0 mm (d) 200 TR Cooling Tower
2
-
-
Condenser Water Piping: Supplying, fixing, testing and commissioning of condenser water pipes of following size of MS 'C' class along with necessary clamps, vibration isolators and fitings such as bends, tees etc., but excluding valves, strainers, gauges etc. adequately supported on rigid suppots duly painted/buried in ground exacavation and refilling etc., as per specification and as per specification and as required complete in all respect.
-
-
-
40 mm dia
18
-
-
80 mm dia
12
-
-
Insulated Valves: Supplying, fixing, testing and commissioning of following valves, strainers, gauges in the chilled ater plumbing duly insulated to the same specifications as the connected piping and adequately supported as per specifications. Butterfly Valve (Mannual) with CI body SS disc nitrile rubber sheal & O-ring PN 16 pressure rating for chilled water/ hot eater circulation as specified 25 mm dia
3
-
-
Chilled Water/ Hot Water distribution piping: Supplying, laying / fixing, testing and commissoining of "C" class mild steel chilled water/hot water piping with insulation and all necessary fittings like bend, tees, reducers, flanges, supports and duly insulated with suitable materials with all accessories.
-
-
-
80 mm dia
341
-
-
100 mm dia
305
-
-
125 mm dia
232
-
-
Pot Strainer and having MS body, bolted cover, flanged ends, basket of stainless steel screen with 1.5 mm perforations and a permanent magnet for condenser water application complete with flanges, nuts-bolts, gasket etc., complete as required.150 mm dia
1
-
-
Replacement of Microprocessor controller of chiller and reprograming, recommissioning and testing of existing voltas make chiller complete as required.
1
-
-
Supply and fixing of PVC expansion tank of capacity 10,000 ltrs for make up of cooling tower to maintain flow of water during plant running with new foundation and its required connection complete as required.
1
-
-
Modification of CC foundation block as per new cooling tower with required accessories to complete the foundation as required.
2
-
-
Supply and fixing of suitable size MS Structure for new cooling towers 200 TR capacity complete as required.
2
-
-
Dismantling and removal of existing cooling towers with pipe and valves, civil foundation and excavation and removing underground pipe for cooling tower line and shifting the dismantled item by using hydra including rental charges of T&P and labour.
2
-
-
Modification of existing panel of starter panel as per new cooling tower complete as required.
2
-
-
Supply, laying S/U of 4 Core x10 Sq.mm XLPE Alluminium Armoured power cable from HVAC electrical panel to Cooling tower with necessary gland and aIluminium lug complete as required.
100
-
-
Less buy back cost of the salvage value of dismantled condensor pipe line, hot water pipe line, chilled water pipe line, cooling tower, valves, pot strainer, nut bolts including taking them out from the site complete with required labour, tools.