Indian Institute Of Toxicology Research Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Indian Institute Of Toxicology Research - IITR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date10 Oct 2023
Closing Date19 Oct 2023
Tender Amount₹ 22,83,935
Costs
EMD
₹ 45,680Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CSIR_168009_2Bid Award Id
ViewTender No
IITR/CW-16(01)/2023-24/WorksTender Authority
Indian Institute Of Toxicology Research ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Undertaking-I
BOQ Items
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources)
4.8
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
320
-
-
Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift
4.5
-
-
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
4.2
-
-
12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
56
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
60
-
-
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
56
-
-
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth.
47
-
-
Construction of make & Shift Porta Cabin having mild steel structure at CRK campus of CSIR-IITR near Sarojni Nagar Kanpur Road, Lucknow of size 15.24 meter x 6.10 meter x 2.44 meter (Size-50’x20’x8’ clear height inside). The construction of porta cabin shall be water-resistant, fire-resistant, termite rated, sound resistant, and shall withstand in weather conditions. Construction of porta cabin shall be constructed as per enclosed technical specifications and drawing at site and as per direction & satisfaction of the Engineer In-Charge. The construction area of porta cabin shall be 1000 Sqft i.e. 92.96 Sqm which shall be measured edge to edge at plinth level. This item of work also includes the followings • Construction of make and shift structural building porta cabin with water supply lines and drainage lines, two washbasin installations, connection with all required fittings and water taps. • Making electrical wiring for lights, wall/ceiling fans, power points for refrigerators, air-conditioning with power wiring and MCB switches & sockets. • Providing and fixing of sunshade to all outer doors and windows with grills.• Making rodent free entries of cabins. Note: Therefoe bidders are requested to quote their rates accordingly, nothing shall be paid extra for complete construction of porta cabins.
1000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements