Hapur Pilakhua Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Hapur Pilakhua Development Authority - HPDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Apr 2025
Closing Date21 Apr 2025
Tender Amount₹ 35,06,663
Costs
EMD
₹ 1,75,500Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HPDA_1028562_1Bid Award Id
ViewTender No
18/SE/HPDA/2025Tender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
M.S (Tor steel or plain) work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping shall be measured and including cost of binding wire.
31.79
7502
238512.42
... More
(A) Supply, Carting Laying & Jointing of NP-3 RCC humepipe of different dia, & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 250 mm dia pipe
20
650
13000
... More
M-150 Brick work in 1:4 (1cement: 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.
274.01
5170
1416631.7
... More
Dişmentling brick work or stone work in lime or cement mortar and including stracking of materials as directed be the Engineer-in-charge with in a diatance of 60 meter (200 feet)
93.24
600
55944
... More
(A) Supply, Carting Laying & Jointing of NP-3 RCC humepipe of different dia, & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 600 mm dia pipe
20
2800
56000
... More
supply of sweeper for drain garage
1200
400
480000
... More
disposal of garage
882.24
165
146187.17
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, In proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
45
4000
180000
... More
Section and jettingmachine
20
2500
50000
... More
(A) Supply, Carting Laying & Jointing of NP-3 RCC humepipe of different dia, & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 450 mm dia pipe
20
2200
44000
... More
Excavation in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.
90
110
9900
... More
Dewatring pumping out water
250
308
77000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements