Hapur Pilakhua Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Hapur Pilakhua Development Authority - HPDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Nov 2021
Closing Date9 Dec 2021
Tender Amount₹ 6,86,478
Costs
EMD
₹ 34,350Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_HPDA_649692_2Bid Award Id
ViewTender No
422/CE/HPDA/2021 Dt.25-11-2021Tender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M-150 class brick work in 1:4 cement and corse sand mortar in foundation and plinth including supply of all materials labour T&P etc. required for proper completion of the work. (SOR: 2020 305A)
4.06
-
4950
... More
2.5 cm thick and of cement concrete consisting of 1 part cement 1 1/2 parts approved coarse sand and 3 parts approved 10 mm. Graded stone grint and including water proofing material as ordered by the Engineer incharge in the proportion as specified b the manufacturer including supply of all materials labour Tools & plants etc. required for proper completion of the work and including proper curing & shutterings as necessary. (SOR: 2020: 361)
45.57
-
330
... More
M-150 brick work in 1:4 cement and coarse sand of 1:5 F.M. mortar in superstruture including necessary thicknes of brick as required cutting & moulding of brick as equired thickness of walls not to be less than one brick including supply of all materials labour tools & plants etc. required for proper completion of the work. (SOR: 2020: 305A+309+310)
67.87
-
5540
... More
12mm thick plaster with cement and corse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR: 2020: 584)
541
-
165
... More
Finishing wall with water proofing cement paint of approved make and quility on new wood with two coat to give an even shade including supply of all materials, labour, T&P etc. required for proper completion of the work. (660: 2019)
541
-
84
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (279 (A) 200)
0.7
-
7000
... More
2.5 cm th 1:2:4 P.C.C. floor with cement approved coarse sand and 2 cm garded app. Stone grit laid in panels finished with 3mm floating coat of neat cement of cement and merble dust in ratio 5:1 as specified over and including 8 cm th. Base concrete consisting of cement, fine sand of 1.25 fineness modulus & brick ballast 4 cm gauge in the prop. of 1:6:12 and removing any overlapping mortar at the joints of the panels if any and giving them auni from finish, i/c so/ all mat. lab. T&P etc. reqd. for proper completion of the work. (SI 601 B of SOR-19)
3.38
-
480
... More
Same as Item No.-11 but for without Base Concrete. (S.1. -601A of SOR-2019)
1.04
-
235
... More
Earth work in cutting or in embankment in ordinary soil, excavation to be done from regular pits not exceeding 1/2 M. in depth and work embankment to be in 20 cm layer including ramming and dressing the surface to required levels and slopes and also including 1.5M lifts and lead up to 8 km. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30M distance as directed by the Engineer-in-charge, including the cost of royalty of earth @ 14.00 per cum. (Sch. PWD: 2019 253 (a)
416
-
320.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements