If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Hapur Pilakhua Development Authority - HPDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 28,30,090
Costs
EMD
₹ 1,41,500Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPDA_986732_1Tender No
298/SE/HPDA/2024Tender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Desilting/cleaning of following dia chocked sewer line by super sucker machine & removing out debries/mud & silt rubbish from chocked line of heavily charged sewor line & safe disposal of silt with in municipal limit incl opening & cleaning the line from mud & silt complete with supply of all materials, man power, labour T&P etc. from site of work incl removal of all hindrences obstructions, unforseen lems complete with all respect.
(A) 250mm dia
550
569
313087.5
... More
(B) 350mm dia
1050
1035
1086750
... More
Excavation for depth upto 1.5 MBGL for laying sewer line,manhole, gully traps etc. in ordinary soil (loam, clay& sand) i/c cutting of joints pits, trimming, dressing. levelling & refilling of trenches in 20 cm layers, watering sand ramming the same i/c removel of surplus earth or other dismentled materials, upto a distance of 50M from the center of trenches.
(a) 0-1.5 MBGL
36
246
8856
... More
(b) 1.5-3.0 M BGL
31
310
9610
... More
Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials. Tabour, tools & plants etcc required for proper completion of the work. bedding of RCC pipes, including cost of form work in the trenches
6
6100
36600
... More
Supply, Carting Laying & Jointing of NP-2 RCC Hume pipe with collars jointed still mixture 1:2 all jointing materials, testing etc, complete A. 150 mm dia pipe. (108X0.781/100XRs.493.10)
65
415
27019.2
... More
250 mm dia NP-2 RCC hume pipe
(108X0.781/100XRs.811.15)
25
683
17094.75
... More
300 mm dia NP-2 RCC hume pip
(108X0.781/100XRs.902.05)
6
760
4562.52
... More
Constructing brick masonry circular type manhole 0.91 m internal dia at bottom and 0.56m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand), inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement, foundation concrete 1:3:6 mix (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size), and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design: 19.9.1 0.91 m deep with S.F.R.C. cover and frame (heavy duty. HD-20 grade designation) 560 mm internal diameter con- forming to I.S. 12592, total weight of cover and frame to be not less than 182 kg., fixed in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12mm thick cement plaster at the external surface shall be paid for separately):
With Sewer bricks conforming to IS: 4885
(108X0.781/100XRs.11666.90)
13
9835
127857.47
... More
Constructing brick masonry circular manhole 1.22 m internal dia at bottom and 0.56 m dia at top in cement mortar 1:4 (1 cement :4 coarse sand) inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement foundation concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) and making necessary channel in cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design 19.11.1 1.68 m deep with SFRC Cover and frame (heavy duty HD-20 grade designation) 560 mm internal diameter conforming to I.S. 12592, total weight of cover and frame to be not less than 182 kg. fixed in cement concrete 1:2:4 (1 ce-ment: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12 mm thick cement plaster at the external surface shall be paid for separately): 19.11.1.1 With common burnt clay F.P.S. (non modular)
19.11.1.2 With Sewer bricks conforming IS 4885
(108X0.781/100XRs.22463.90)
6
18937
113622.36
... More
560mm dia cover with out frame (Heavy duty)
(108X0.781/100XRs.5100)
45
4299
193468.5
... More
M-150 Brick work in 1:4 ( 1cement 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.
4.5
5170
23265
... More
12mm thick plaster with cement and coarse sand in 1:4 over
brick work minimum thickness not to be less than 10mm thick
including supply of all materials, labour and T & P etc.
required for proper completion of the work.
38
200
7600
... More
Cement concrete with 2cm gauge approved stone grit. coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour. Tools & plants etc. required for proper completion of the work.
5
7050
35250
... More
Pumping out water caused by spring ,tidal or river seepage. broken water mains or drain or well point pumping and the like
125
417
52125