Hapur Pilakhua Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Hapur Pilakhua Development Authority - HPDA Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date2 Aug 2018
Closing Date25 Aug 2018
Tender Amount₹ 82,31,077 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for mechanically compacted to achive 95% proctors density including arrangement of water, settlement of all T & P charges including roler and its fuel charge.

1710

-

22

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

160

-

3200

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

182

-

2850

... More
Construction of cement concrete pavement C.C.Road 1:1.5:3

160

-

7500

... More
Making expansion /contraction joint

326

-

40

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).

133

-

4812.14

... More
Supply and fixing of 80 mm thick I shaped rubber moulded cement grey / ordinary red inter locking cement concrete paver blocks confirming IS:15658/2006 of approved shape manufactured by high pressure and control vibration machine having plan dimension 200x(160+120mm) with minimum 5mm thick topping of O.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30 MPa (M-30) including levelling & dressing of surface up to required level and slopes filling joints with local sand including cost of material, labour, T&P required for proper completion of work as directed by E/I and as per approved specifications.

1820

-

727

... More
PART ( B) :-- DRAIN WORK

-

-

-

... More
Earthwork in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.

258

-

95

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

49

-

2900

... More
M-150 Brick work in 1:4 ( 1cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.

194

-

4430

... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.

352

-

165

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

15

-

6250

... More
Disposal of surplus earth available from cutting including cartage upto 0.5 km as per direction of E/I.

258

-

35

... More
R.C.C work with cement , approved coarse sand & 2cm gauge approved slone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement andits bending , but including its fixing and binding the same with 24 B.W. G.G.I binding wire and shuttering tetc and supply of all materials labour tools & plants etc required for proper completion of the work including cost of binding wire . the rate excludes maing of drip course which shall be paid extra.

10

-

7700

... More
M.S (tor steel or plain ) in work such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authories overlaping shall be measured and including cost of binding wire.

12

-

5600

... More
Providing and fixing factory made precast RCC perforated drain covers,having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S.flats of size 50 mm x 1.6 mm complete,all as per direction of Engineer in charge.

779

-

920.97

... More
PART ( C) :-- SEWER WORK

-

-

-

... More
Excavation for depth upto 1.5 MBGL for laying sewer line, manhole, gully traps etc. in ordinary soil (loam, clay& sand ) i/c cutting of joints pits, trimming, dressing, levelling & refilling of trenches in 20 cm layers, watering sand ramming the same i/c removel of surplus earth or other dismentled materials, upto a distance of 50M from the center of trenches. (a) 0-1.5 MBGL

489

-

183.1

... More
(b) 1.5 - 3.0 M BGL

162

-

230.7

... More
(c) 3.0 - 4.5 M BGL

14

-

290.2

... More
(A) Supply,Carting Laying & Jointing of NP-3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 250 mm dia pipe (I) 0-1.5 MBGL

20

-

584

... More
(II) 1.5-3.0 MBGL

70

-

602

... More
(b) Same as above but for 300 mm dia NP-3 RCC hume pipe (I) 0 - 1.5 m BGL

40

-

792

... More
(b) Same as above but for 300 mm dia NP-3 RCC hume pipe (II)1.5-3.0 MBGL

70

-

813

... More
Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials , labour, tools & plants etcc required for proper completion of the work.In bedding of RCC pipes,including cost of form work in the trenches

24

-

5200

... More
Construction of brick masonry chamber of different internal size i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A) 600x600x600 mm

5

-

4379.8

... More
(B) 600x600x900 mm

5

-

5735

... More
Addition or subtraction of ht of M.H. ofof different internal size manhole M-150 class B/W, 1:6 cement mortar, int. plaster 1:212, neat cement finished & 3 No. foot rest i/c s/o all mat lab. T&P etc. complete (A.R.)(0.60x0.60x1.00) m.

8.5

-

4326

... More
Construction of brick masonry chamber of 560 mm internal dia with F.P.S. bricks i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 900 mm deep

61

-

6832

... More
(B) 1200 mm deep

2

-

12562

... More
(C) 1500 mm deep

2

-

18627

... More
Addition or subtraction of ht of M.H. ofof different internal size manhole M-150 class B/W, 1:6 cement mortar, int. plaster 1:212, neat cement finished & 3 No. foot rest i/c s/o all mat lab. T&P etc. complete (A.R.) (A) Bottom dia 900 mm dia (beyond 900 to 1650 mm BGL)

4.6

-

5247

... More
(B) Bottom dia 1200 mm dia (beyond 1650 to 2250 mm BGL)

0.6

-

6900

... More
(C) Bottom dia 1500 mm dia (beyond 2250 to 3000 mm BGL)

0.7999999999999999

-

8343

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -560 mm internal dia

65

-

2785.92

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -600x600 mm internal size

10

-

2785.92

... More
Supply,Carting Laying & Jointing of NP-3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 150 mm dia pipe (I) 0-1.5 MBGL

155

-

439

... More
19.1.3 200 mm diameter metre 423.35

208

-

497

... More
19.4 Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design: 19.4.2 150 x 100 mm size P type 19.4.2.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5

5

-

1558.32

... More
Constructing brick masonry road gully chamber 50x45x60 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm pre-cast R.C.C. horizontal grating with frame complete as per standard design :19.27.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5

5

-

3881.37

... More
PART ( D) :-- RAIN WATER HARVESTING WORK

-

-

-

... More
Earthwork in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.

54.4

-

95

... More
Add to items (251-253) for every additional 30 M. (100 ft.) lead or part of 30 M (100 ft.) or for every additional1.50 M. (5 ft.) lift or part of 1.50 M. (5 ft.)

27.200000000000003

-

12

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

1.6

-

2850

... More
M-150 Brick work in 1:4 ( 1cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.

17.900000000000002

-

4430

... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.

70

-

165

... More
Same as Item No.-13 but for Rough Face.

8.1

-

180

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

0.6

-

6250

... More
R.C.C work with cement , approved coarse sand & 2cm gauge approved slone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement andits bending , but including its fixing and binding the same with 24 B.W. G.G.I binding wire and shuttering tetc and supply of all materials labour tools & plants etc required for proper completion of the work including cost of binding wire . the rate excludes maing of drip course which shall be paid extra.

1.6

-

7700

... More
M.S (tor steel or plain ) in work such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authories overlaping shall be measured and including cost of binding wire.

3.8000000000000003

-

5600

... More
Same as above item no. 15 above but in heavy size such as turses, built up gates, record racks, gates etc, roof work, gates etc. including rivetting of welding where necessary positing

1.9000000000000001

-

6250

... More
Painting or varnishing work in small areas or new wood/steel work with one coat ready mixed priming paint and one coat or approved superior quality ready mixed paint or varnish including supply of all materials, labour. T&P etc. required for proper completion of the work. Paint to be used should confirm the ISI.No.103-1950. As per SOR. 641+642

5.1

-

80

... More
Supply and Filling of Boulders 5.15 cm size including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

3.6

-

1774.08

... More
Supply and Filling of Boulders 5 to 10 mm size including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

3.6

-

1835.52

... More
Supply and Filling of Coarse sand including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

3.6

-

1835.52

... More
Boring of 8" dia hole for rain water harvesting and lowering of 4" PVC pipe including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

72

-

78.72

... More
Supply and Laying of 110 mm dia PVC pipe 6 kg/sqcm (5 mm thick) as per ISI make and also slotted pipe including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

80

-

190

... More
Providing and fixing factory made precast RCC perforated drain covers,having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S.flats of size 50 mm x 1.6 mm complete,all as per direction of Engineer in charge.

10

-

920.97

... More
PART ( E) :-- WATER SUPPLY WORK

-

-

-

... More
Excavation for depth upto 1.5 MBGL for laying sewer line, manhole, gully traps etc. in ordinary soil (loam, clay& sand) i/c cutting of joints pits, trimming, dressing, levelling & refilling of trenches in 20 cm layers, watering sand ramming the same i/c removel of surplus earth or other dismentled materials, upto a distance of 50M from the center of trenches.(A.R.)

217

-

183.1

... More
Supply carting & laying of H.D.P.E. pipe of different dia ISI marked with and including all freight taxes etc. all complete. (A) 110 mm dia OD 6 kg /sqcm Pressure

-

-

-

... More
(a) 40 mm dia OD 6 kg /sqcm Pressure

10

-

124

... More
(b) 50 mm dia OD 6 kg /sqcm Pressure

10

-

180

... More
(c) 63 mm dia OD 6 kg /sqcm Pressure

60

-

266

... More
(d) 90 mm dia OD 6 kg /sqcm Pressure

100

-

522

... More
(e) 110 mm dia OD 6 kg /sqcm Pressure

262

-

768

... More
(f) 160 mm dia OD 6 kg /sqcm Pressure

40

-

1596

... More
Cement concrete with 2cm gauge approved stone ballast, coarse sand cement in the proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. For pipe thrust block

0.6

-

6250

... More
Providing and fixing C.I. sluice valves (with cap) complete with bolts,nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : 18.31.1 100 mm diameter 18.31.1.1 Class I

2

-

3184.84

... More
(B) 18.31.3 150 mm diameter 18.31.3.1 Class I

1

-

4686

... More
Construction of brick masonry chamber of different internal size i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 600x600x900 mm

3

-

6250

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -560 mm internal dia

3

-

2785.92

... More
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.External work 18.12.5 40 mm dia nominal bore

40

-

289.44

... More
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work 18.12.7 65 mm dia nominal bore

20

-

433.63

... More
Providing and fixing C.I. double acting air valve of approved quality with bolts, nuts, rubber insertions etc. complete (The tail pieces,tapers etc if required will be paid separately) :18.59.2 80 mm dia

3

-

5423.76

... More
Making Garden Hut R.C.C.with wooden look in square shape dia 3.50 m height 3.40 m on four pillar circumference 85 cm with wooden touch with round shape cementing with main path way by c.c. path and floor and foundation work complete jobs with wooden touch making and fixing of R.C.C.logs wooden touch making and fixing of sitting purpose & suitable for landscaping as directed by Engineer in charge as per attached photograph including materials & labours etc.

1

-

146400

... More
Provision of Platform for base

1

-

19200

... More
Providing & Fixing G.I.Fitting set accessories with Gate Valve connection with Motor Pump Complete

1

-

4224

... More
Providing & Fixing of 2 '' Ball valve P.P.

1

-

1536

... More
Providing & Fixing of Horizontal Boring.

4

-

422.4

... More
Providing & Fixing of 1" Hydrant.

4

-

288

... More
Providing & Fixing of Hand Boring with 150 mm Q Buro hole by casing pipe method in ordinary soil including correction ….. Levelling of side complete..

50

-

141.12

... More
Supply of 110 mm Q 6 kg / sqm I.S.I. mark P.V.C.pipe including all taxes cartage up to side including cord cape.

50

-

155.52

... More
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.External work 18.12.6 50 mm dia nominal bore

24

-

328.99199999999996

... More
Supply of solvent

0.25

-

302.4

... More
Supply of Filter Cloth

2

-

96

... More
Supply of Plastic Rop

1

-

76.8

... More
Supply of 3 H.P.I.S.I. Marka K.S.B.make or equivalent Submersible Motor Pump Complete.

1

-

18720

... More
Supply of 3 Phase 2.5 mm I.S.I. Marka Flate cable

35

-

28.8

... More
Supply of Starter with overload relay I.S.I.mark.

1

-

2880

... More
Supply of 50 mm dia Iron clamp

2

-

403.2

... More
Supply of 2 " Nipple 50 mm dia.

1

-

62.4

... More
Supply of 2 " Albow

1

-

96

... More
Supply & Fixing of Pre cast R.C.C.chaired Garden Bench 1.5 m long including vat,or other taxes etc. complete in all respects.

6

-

7113.6

... More
Making connection of drain or sewer line with existing M.H. s/c breaking into & making good the walls floors with cement concrete 1;2:4 mix, cement plaster on both sides with cement mortar 1:3 cement & coarse sand finished with a floating coat of neat cement & making necessary channeles for the drain etc. complete for 250+ 300mm dia pipe (A) 110x25 mm

10

-

529.92

... More
(B) 160x25 mm

2

-

1063.68

... More
Providing and fixing Chlorinated Poly vinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement ,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge. External work 18.9.3 25 mm nominal outer dia Pipes

16

-

183.984

... More
Making connection of drain or sewer line with existing M.H. s/c breaking into & making good the walls floors with cement concrete 1;2:4 mix, cement plaster on both sides with cement mortar 1:3 cement & coarse sand finished with a floating coat of neat cement & making necessary channeles for the drain etc. complete for 250+ 300mm dia pipe (A) For pipes 250 to 300 mm diameter

2

-

553.92

... More
Construction of brick masonry chamber of different internal size i/c s/o all material, labour T&P etc. reqd. for proper completion of work as per direction of E/I as per approved design & drawing of H.P.D.A. (A.R.) (A) 300x300x380 mm

10

-

2785.92

... More
Addition or subtraction of ht of M.H. ofof different internal size manhole M-150 class B/W, 1:6 cement mortar, int. plaster 1:212, neat cement finished & 3 No. foot rest i/c s/o all mat lab. T&P etc. complete (A.R.)(0.30x0.30x1.00) m.

3.8000000000000003

-

4152.96

... More
Providing Precast Concrete Manhole Cover & Frame conforming of to IS:12592-2002.The concrete mix should not be less than M-30. Heavy duty,HD-20 grade desination -600x600 mm internal size

13

-

2785.92

... More
PART (F) Park CIVIL WORK

-

-

-

... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in-charge within a distance of 60 meter (200 feet.).

1

-

400

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50m and lead upto 30M and lead upto 30m and including filling watering and ramming or excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30M from the foundation trenches.

65

-

95

... More
Concrete with 4cm. gauge brick ballast, fine sand of 1.25 FM & cement in the proportion 12:6:1 in foundation & under floors including supply of all materials labour T&P etc. required for proper completion of the work.

49

-

2900

... More
M-150 class brick work in 1:4 cement and coarse sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all materials labour T&P etc. required for proper completion of the work.

74

-

4430

... More
2.5 cm thick and of cement concrete consisting of 1 part cement 1½ parts approved coarse sand and 3 parts approved 10 mm . Graded stone grit and including water proofing material as ordered by the Engineer incharge in the proportion as specified b the manufacutrer including supply of all materials labour Tools & plants etc. required for proper completion of the work . and including proper curing & shutterrings as necessary.

21

-

300

... More
M-150 brick work in 1:4 cement and coarse sand of 1.25 F.M.mortar in superstruture including necesssary thickness of brick as reqruired cutting & moulding of brick as equried thickness of walls not to be less than one brick including supply of all materieals labour tools& plants etc. reqruired for proper completion of the work.

22

-

4970

... More
Mild steel or iron work of M.S.grill & staircase Railing, wrought to required form including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work.

1

-

6350

... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.

274

-

165

... More
Same as Item No.-8 but for Rough Face.

252

-

180

... More
Finishing wall with water proofing cement paint of approved make and quality on new wood with two coat to give an even shade including supply of all materials, labour, T&P etc. required for proper completion of the work.

568

-

42

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

5

-

6250

... More
Painting or varnishing work in small aras or new wood work with one coat (upto one square metre of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950.

3

-

80

... More
2.5 cm th 1:2:4 P.C.C.floor with cement, approved coarse sand and 2 cm garded app. stone grit laid in panels finished with 3mm floating coat of neat cement of cement and merble dust in ratio 5:1 as specified over and including 8 cm th. base concrete consisting of cement , fine sand of 1.25 fineness modulus & brick ballast 4 cm gauge in the prop.of 1:6:12 and removing any overlapping mortar at the joints of the panels if any and giving them auni from finish, i/c so/ all mat. lab. T&P etc. reqd for proper completion of the work.

3

-

480

... More
Same as Item No.-13 but for Without Base Concrete.

0.5

-

235

... More
Earthwork in cutting or in embankment in ordinary soil, excavation to be done from regular pits not exceeding 1/2 M. in depth and work embankment to be in 20 cm layer including ramming and dressing the surface to required levels and slopes and also including 1.5M lifts and lead up to 6 km . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30M distance as directed by the Engineer-in-charge, Including the cost of royalty of earth.

92

-

287

... More
Deduction of cost of old brick obtained from dismantling of brick work.

230

-

4.7

... More
Deduction of cost of old brick bats obtained from dismantling of brick work.

0.5

-

500

... More
Supply and fixing of 80 mm thick I shaped rubber moulded cement grey / ordinary red inter locking cement concrete paver blocks confirming IS:15658/2006 of approved shape manufactured by high pressure and control vibration machine having plan dimension 200x(160+120mm) with minimum 5mm thick topping of O.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30 MPa (M-30) including levelling & dressing of surface up to required level and slopes filling joints with local sand including cost of material, labour, T&P required for proper completion of work as directed by E/I and as per approved specifications.

162

-

727

... More
Supply & Fixing of R.C.C.Grill work ( Jali ) of approved pattern & make at site of work in cement concrete consisting of cement, approved coarse sand and 6 mm nominal size stone grit in the proportion of 1;2:4 & reinforced with 6 mm dia M.S. wire / bar including cutting & finishing with 1;3 cement & fine sand of 1.25 fineness modulus mortar including including supply of material, labour, T&P required for proper completion of work (1) 5.00 cm thick

90

-

700

... More
Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)

80

-

92.2

... More
M & L for providing SEE saw (2 seater) size 2400 mm long seat to seat x 1800 mm height ( above the ground) frame is made of MS pipe 50 mm dia nominal bore Heavy class. Seating beam is of MS pipe heavy class laid by MS sheet is 18 SWG of 300 dia and its seat handle and 'c' type cantilever is made of MS pipe 20 mm dia nominal bore Heavy class. This seating beam is fitted with the frame complete including fixing of vertical members in cement concrete block of size 50 cm x 45 cm x 45cm of ration 1:2:4 type B-1. The rates includes for cost of cement concrete block and applying for priming with red oxide primer and painting two or more coats of Duco paints of approved quality in multicolor on all steel surf complete. Including all tax.

1

-

8755.2

... More
M & L for providing slide 3600 mm long x 450 mm wide x 1500 mm height( above the ground) slide is made of stainless steel sheet 15 SWG grade 304 reinforced with 18 Gauge GI sheet riveted, together mounted on M.S. angle 400 mm x40 mm x 5 mm slide 2 numbers vertical support f M.S. pipe 25 mm dia nominal bore heavy class ladder is made of M.S. pipe 25 mm dia nominal heavy class and its railing is made of M.S. pipe 20 mm dia nominal bore heavy class. Ladder having climbing steps made of M.S. pipe 15 mm dia bore heavy class at equal spacing not more than 380 mm c/c including fixing the vertical members cemented concretes blocks 1:2:4 type of size 45 cm x 45 cm. the rates including for the cost of cement concrete blocks and applying of priming with red oxide primer and painting two pr more coat of Duco paint of approved quality in multicolor on all steel surface compete. Including all tax.

1

-

40320

... More
M & L for providing chain swing of size 3000 long x 2700 height (above ground) frame is made of MS pipe 50 mm dia nominal nore heavy class which stay with MS pipe 25 mm dia nominal bore heavy class frame is connected with MS rod 25 mm dia shaft havng fabricated housing made of MS flat 50 mm x 6 mm fatten with vall bearing no. 3024, Shaft is further connected with MS chain 6 mm thick having 2 Nos. sitting seat made of MS pipe 15 mm dia nominal bore heavy class and laid by Ms sheet of 200 SWG compete includes for fixing in cement concrete block of 45 cm x 45 cm in 4 legs of ratio 1:2:4 type B-1. The rates including for cots of Duco paint of approved quality in multicolor on all steel surface compete. Including all Tax.

1

-

26265.6

... More
PART (G) :--- Park HORTICULTURE WORK

-

-

-

... More
Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared.

400

-

3.504

... More
Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto 1.5 m. 2.28.1 All kinds of soil

400

-

13.392

... More
Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly leveling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or/and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure).

120

-

44.016

... More
Rough dressing the trenched ground including breaking clods.

400

-

0.864

... More
Supplying and stacking of well decayed cow dung manure at site including royalty and carriage upto 1 km (Cow dung manure measured in stacks will reduced by 8% for Payment).

10

-

181.536

... More
Supplying and stacking of good earth at site including royalty and carriage up to 1 km (earth measured in stacks will be reduced by 20% for payment).

23

-

319.248

... More
Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation.

400

-

2.784

... More
Fine dressing of the ground

400

-

2.064

... More
Spreading of sludge, dump manure and / or good earth in required thickness as per direction of Officer-in-charge (Cost of sludge, dump manure and / or good earth to be paid separately).

33

-

29.712

... More
Providing & laying Selection no. 1 grass turf with earth 50mm to 60mm thickness on existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same, as per direction of officer in charge.

280

-

73.92

... More
Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm,refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately).

19

-

125.136

... More
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water,dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) : 23.14.3 Holes 60 cm dia, and 60 cm deep.

40

-

29.904

... More
(B)Holes 45 cm dia, and 45 cm deep.

100

-

12.864

... More
Providing and Planting of different verity plants.

-

-

-

... More
a)Providing and Displaying of Clerodendron inerme plant having ht. 25 cm to 32 cm multi branched in 20 cm size of Earthen Pot / Plastic Pot & as per direction of the officer-in-charge.

2400

-

19.68

... More
b) Providing and Displaying of Iresine herbstii plant, of height 20-30 cm. full of branches well developed in 15 cm size of Earthen Pot / Plastic Pot & as per direction of the officer-in-charge.

1200

-

14.784

... More
c)7.69 Supply and stacking of Plumeria alba plant of height 120-135 cm. with 2-3 branches in bags of size 30 cm as per direction of the officer-in-charge.

5

-

115.2

... More
d) Providing and Displaying Furcaira variegated plant well developed with fresh & healthy foliage 8 to 10 leaves in 30 cm Earthen Pot as per direction of the officer-in-charge.

8

-

196.8

... More
e)Providing and Displaying Ficus Starlight plant with fresh, healthy and attractive foliage 45 to 60 cm spread 75 to 90 cm ht., specimen bushy plant,in 35 cm Cement Pot as per direction of the officer-in-charge.

8

-

787.2

... More
f)7.59 Supply and stacking of Mimusops elengi (Maulsri) plant of height 180-195 cm., well developed with thick stem in big in big size HDPE bag as per direction of the officer-in-charge.

4

-

115.2

... More
g)Providing and Displaying Golden Bottle brush Topiary plant well developed with fresh & healthy foliage 5 to 6 big ball 115 to 180 cm ht in 40 cm Cement Pot as per direction of the officer-in-charge. Each 973.75

4

-

934.8

... More
h)Supply and stacking of plant Hamelia patens (Dwarf ) of height 30-45 cm.with 3-4 branches in earthen pots of size 20 cm as per direction of the officer-in-charge. Each 40.00S/P of Hamalia patens (Dwart) height 2' to 2.5 in cement begs multi branched

8

-

38.4

... More
i)Providing and Displaying Bougainvillea named variety, Sobhra, Thima, Marry palmar, Cherry Blossom etc. well developed with fresh & healthy bushy plant in full bloom 75 to 90 cm ht. in 40 cm Cement Pot as per direction of the officer-in-charge. Each 307.50

8

-

295.2

... More
j)7.29 Supply and stacking of Ficus bengalensis (varigated) plant of height 75-90 cm., multibranched in earthen pots of size 30 cm as per direction of the officer-in-charge.

4

-

76.8

... More
k)Supply and stacking of plant Euphorbia caracasana (bronze colour leaves) of height 60-75 cm. with 4-5 branches in bag of size 25 cm as per direction of the officer-in-charge.

4

-

48

... More
l)Providing and displaying of Phoenix palm plant, having ht. 75 cm to 90 cm with 10 to 15 or more leaves, well developed, fresh and healthy in 25 cm size of Earthen pot / Plastic pot & as per direction of the officer-in-charge.

4

-

196.8

... More
m)Supply and stacking of Washingtonia filifea palm plant stem ht. 90-105 cm with 6-7 healthy leaves lush green leaves well developed in big size HDPE Bags as per direction of the officer-in-charge. Each 400.00

2

-

384

... More
n)Providing and displaying of Livistona palm plant, having ht. 60 cm to 75 cm, well developed with 8 to 10 leaves, fresh & healthy foliage in 30 cm size of Earthen pot / Plastic pot . as per direction of the officer-in-charge.

4

-

196.8

... More
o)Supply and stacking of Ficus benjamina (green) plant of height 120-135 cm. with 6-8 branches and lush green foliage in g. bags of size 25 cm as per direction of the officer-in-charge.

4

-

96

... More
p)Supply and stacking of Fishtail palm plant of ht. 150-180 cm bottom girth 15-20 cm well developed in big poly bags of size 25 cm as per direction of the officer-in-charge.

4

-

182.4

... More
q)8.66 Supply and stacking of plant Tecoma gaudichaudi of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of the officer-in-charge.

20

-

48

... More
r)Supply and stacking of plant Tabernaemontana divaricata (Chandni double) of height 45-60 cm in earthen pots of size 20 cm as per direction of the officer-in-charge.

20

-

38.4

... More
s)Supply and stacking of Casuarina equisetifolia plant of height 150-165 cm in big poly bags of size 25 cm as per direction of the officer-in-charge.

2

-

52.8

... More
t)Supply and stacking of Foxtail palm plant of ht. 120-150 cm bottom girth 15-20 cm well developed in big poly bags of size 25 cm as per direction of the officer-in-charge.

2

-

220.8

... More
u)Providing and displaying of Raphis palm specimen plant, having ht. 1.50 m to 1.65 m with 40 to 50 lush green suckers, well developed, fresh & healthy foliage leaves in 40 cm size of Earthen Pot / Chali / Tray & as per direction of the officer-in-charge.

2

-

295.2

... More
v)Providing and Displaying plants Budded Rose (H.T. variety) 3 to 4 healthy branch 30 cm and above ht. well developed with one and above flower plant in 20 cm Earthen Pot, as per direction of the officer-in-charge.

10

-

29.52

... More
Supply of Neem oil cake at site with 50 kg well packed company bag including royality & carriage.(Reduced 200gm per empty bags for payment.) etc.

70

-

6.335999999999999

... More
Supply of Insecticide Anti termite 20% EC in one litre packing at site including royality & carriage.

3

-

153.6

... More
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages,creepers etc.including hoeing, weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brushcutter , removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide ,Pesticide will be provided by the Department & lawn mover and brushcutter with fuel , other T & P material/articles shall be provided by thecontractor.) 2.40.1 Prestigious works / H.M. house & officers entitled to free Per Sqm accommodation.(as per yard stick 1Mali =1.00Acre)

4800

-

2.736

... More
Provision of chokidar for complete watch & ward existing area & activities.

12

-

8700

... More
Sweeping of path area & periphery of garden & other areas,excluding lawn area & removal of rubbish from park dustbin provide of Nagar Nigam (approx.200m).

12

-

9000

... More
Preparation of mounds of various size and shape by available excavated / supplied earth complete as per direction of E/I.

20

-

256.416

... More
Providing & Laying of HDPE Pipe I.S.I.mark confirming to I.S. 4984 …… Refilling of 63 mm dia O.D.& 4 kg / sqcm

18

-

257.28

... More
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.25 mm dia nominal bore

20

-

197.61599999999999

... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 25 mm nominal bore

5

-

411.072

... More
Supply of PVC Dust bin 80 ltr Capacity with M.S. Stand including all taxes.

2

-

9588.48



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.