Hapur Pilakhua Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Hapur Pilakhua Development Authority - HPDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date23 Nov 2024
Closing Date7 Dec 2024
Tender Amount₹ 35,06,663 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
supply of sweeper for drain garage

1200

400

480000

... More
disposal of garage

882.24

165

146187.17

... More
Dewatring pumping out water

250

308

77000

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

45

4000

180000

... More
M-150 Brick work in 1:4 ( 1cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.

274.01

5170

1416631.7

... More
(A) Supply,Carting Laying & Jointing of NP- 3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 250 mm dia pipe

20

650

13000

... More
(A) Supply,Carting Laying & Jointing of NP- 3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 450 mm dia pipe

20

2200

44000

... More
(A) Supply,Carting Laying & Jointing of NP- 3 RCC humepipe of different dia , & special from store to site of work lowering the same in trenches in depth upto specified depth true to alignment, caucking the joints with 1:2 cement & coarse sand mortar s/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc. complete (A.R.) 600 mm dia pipe

20

2800

56000

... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.

998.5

200

199700

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

51.72

7050

364626

... More
RCC work in ratio 1:1.5:3 with cement and coarse sand and 200mm stone grit………completion of work.

20.25

8650

175162.5

... More
M.S (Tor steel or plain) work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping shall be measured and including cost of binding wire.

31.79

7502

238512.42

... More
Section and jettingmac ine

20

2500

50000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.