Hapur Pilakhua Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Hapur Pilakhua Development Authority - HPDA Tender

Works
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date4 Jul 2020
Closing Date13 Jul 2020
Tender Amount₹ 4,99,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork in excavation in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.

3.9

370

95

... More
Concrete with 4 cm. gauge stone ballast, coarse sand of 1.25 F.M. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

1

5200

5200

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

1.2

7500

6250

... More
Painting or varnishing work in small area with one coat of ready mixed priming paint & two coat of approved superior quality ready mixed paint or varnish including cost of all material, labour T&P etc. required for proper completion of work as direction by Engineer-in-charge and as per approved

852

68160

80

... More
Painting or varnishing work in small area with two coat on previously painted old wood or Iron work including its sand papering, rubbing and cleaning as required for proper completion of work.

190

11400

60

... More
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 11.20.3 Dark shade pigment using ordinary cement sqm 716.35

4.4

3025

687.7

... More
Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.

40

616

15.4

... More
Laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).

2.85

1783

625.8

... More
Providing & Laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).

2.14

10288

4812.14

... More
Providing and applying tack coat with 80/100 bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg. per sqm. on the prepared bituminous/ granular surface cleaned with mechanical broom, including supply of all materials, labour T&P etc. required for proper completion of the work as per Clause - 503 of MORT & H specifications and as per direction of the Engineer-in-charge. (A.R.)

326.4

3264

10

... More
Providing and laying bitumenous concrete with 100-120 tonnes per hour batch type Hot mix plant producing an average output of 75 MT per hour using crushed agregated of specified grading-II premixed with 60 / 70 (VG30) bitumenous binder @ 5.00% by weight of total mix and hydrated lime @ 2% by weight of total mix , transporting the hot mix material to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory (8-10 tonnes) roller for initial brake down rolling, finish rolling by smooth wheeled tondom roller (8-10 tonnes) to achieve the desired compaction, including supply of all materials, labour T&P etc. required for proper completion of the work as per clause 509 of MORT & H specification sand as per direction of the Engineer in charge (A.R.)

20.7

169886

8207.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.