Greater Noida Industrial Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Greater Noida Industrial Development Authority - GNIDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Oct 2024
Closing Date30 Oct 2024
Tender Amount₹ 2,87,18,025 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Park-4 (E-240)

-

-

-

... More
Red sand stone

455.99

607

277190.76

... More
Park-5 (A-494)

-

-

-

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

59.71

5820

347523.84

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

40.5

95

3847.5

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

23.6

4950

116810.1

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
1:6 (1 cement :6 coarse sand)

205.2

164

33819.01

... More
Park-20 (F-230)

-

-

-

... More
Park-7 (A-302)

-

-

-

... More
Park-18 (D-473)

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

39.42

95

3744.9

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Park-16 (D-307)

-

-

-

... More
Red sand stone

351.12

607

213442.33

... More
Park-12 (B-325)

-

-

-

... More
1:6 (1 cement :6 coarse sand)

286.2

164

47168.62

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

116.8

5820

679776

... More
Red sand stone

449.68

607

273355.97

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.72

7000

47012

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

32.91

4950

162919.35

... More
Park-22 (E-47)

-

-

-

... More
Red sand stone

477.12

607

290036.47

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

116.8

5820

679776

... More
Red sand stone

449.68

607

273355.97

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Red sand stone

351.12

607

213442.33

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

42.93

95

4078.35

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

30.22

4950

149598.9

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Red sand stone

351.12

607

213442.33

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

5.24

7000

36708

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

60

5820

349200

... More
1:6 (1 cement :6 coarse sand)

205.2

164

33819.01

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

35.64

95

3385.8

... More
Red sand stone

449.68

607

273355.97

... More
Red sand stone

351.12

607

213442.33

... More
Park-19 (F-70)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

68.93

5820

401160.96

... More
Park-13 (B-154)

-

-

-

... More
1:6 (1 cement :6 coarse sand)

205.2

164

33819.01

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

7.13

7000

49881.02

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR- 279)

16.84

7000

117852

... More
Red sand stone

449.68

607

273355.97

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

39.42

95

3744.9

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

30.22

4950

149598.9

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

111.78

4950

553311

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

30.22

4950

149598.9

... More
Red sand stone

351.12

607

213442.34

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Park-17 (D-403)

-

-

-

... More
Providing of cement concrete R.C.C Jali 1:2:4 with 50 mm thick. SOR-2020/21.17

252

735

185220

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

27.32

4950

135253.8

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR-279)

19.32

7000

135240

... More
Red sand stone

449.68

607

273355.97

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

16.84

7000

117852

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

30.78

95

2924.1

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

7.31

7000

51198

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

116.8

5820

679776

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Park-23 (E-110)

-

-

-

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

16.84

7000

117852

... More
Red sand stone

406.56

607

247143.75

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.72

7000

47012

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

461.16

164

76003.78

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

52.8

5820

307296

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

97.5

4950

482610.15

... More
1:6 (1 cement :6 coarse sand)

240

164

39554.4

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. DSR-18/10.25.2/AR (Sail Steel)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR-279)

16.84

7000

117852

... More
1:6 (1 cement :6 coarse sand)

237.6

164

39158.86

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.72

7000

47012

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

30.78

95

2924.1

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

118.8

95

11286

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Park-14 (C-216)

-

-

-

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
Park-3 (C-72)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.07

7000

42504

... More
1:6 (1 cement :6 coarse sand)

666.36

164

109822.79

... More
Park-15 (D-133)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

59.71

5820

347523.84

... More
Park-10 (B-54)

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

39.42

95

3744.9

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

5.24

7000

36708

... More
Park-6 (A-392)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

5.24

7000

36708

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.72

7000

47012

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

127.2

5820

740304

... More
Red sand stone

489.72

607

297695.89

... More
1:6 (1 cement :6 coarse sand)

764.64

164

126020.32

... More
PARK-1 (D-80)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.9

7000

48300

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

30.22

4950

149598.9

... More
In grating, frames,guard bar, ladder, railings, brackets, gates and similar works.

9037.5

88

799909.13

... More
1:6 (1 cement :6 coarse sand)

205.2

164

33819.01

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

42.93

95

4078.35

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

30.22

4950

149598.9

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

32.91

4950

162919.35

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

723.62

95

68743.43

... More
Park-9 (A-54)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

5.24

7000

36708

... More
Labour Cess and GST will be paid extra as per govt. orders

-

-

-

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

345.47

4950

1710055.46

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

31.05

4950

153697.5

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

45.6

5820

265392

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

130.68

95

12414.6

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

32.07

4950

158728.53

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Providing of cement concrete R.C.C Jali 1:2:4 with 50 mm thick. SOR-2020/21.17

288

735

211680

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

116.8

5820

679776

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

39.42

95

3744.9

... More
Red sand stone

449.68

607

273355.97

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Park-8 (A-177)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

91.2

5820

530784

... More
Red sand stone

351.12

607

213442.33

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

7.31

7000

51198

... More
1:6 (1 cement :6 coarse sand)

666.36

164

109822.79

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

91.2

5820

530784

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

116.8

5820

679776

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

113.94

95

10824.3

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

75.98

5820

442203.6

... More
Providing of cement concrete R.C.C Jali 1:2:4 with 50 mm thick. SOR-2020/21.17

252

735

185220

... More
1:6 (1 cement :6 coarse sand)

286.2

164

47168.62

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

39.42

95

3744.9

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

23.6

4950

116810.1

... More
1:6 (1 cement :6 coarse sand)

205.2

164

33819.01

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

23.6

4950

116810.1

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

97.5

4950

482610.15

... More
Red sand stone

351.12

607

213442.33

... More
Red sand stone

406.56

607

247143.75

... More
Finishing walls with water proofing cemtn paint: New work (Two or more Coats) Item Code: 13:44.1

461.16

61

28439.74

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.72

7000

47012

... More
Steel work welded in built up sections/ framed work including priming coat - ingrating, frames, guard bar ladder, railing, brackers, gates and similar works. Item code :10.25.2 (Sail Steel)

131.28

88

11619.59

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

666.36

164

109822.79

... More
Finishing walls with water proofing cemtn paint: New work (Two or more Coats) Item Code: 13:44.1

230.58

61

14219.87

... More
Red sand stone

449.68

607

273355.97

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

5.24

7000

36708

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

116.8

5820

679776

... More
Park-11 (B-200)

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

116.8

5820

679776

... More
In grating, frames,guard bar, ladder, railings, brackets, gates and similar works.

4554.9

88

403154.2

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

5.24

7000

36708

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

63.6

5820

370152

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Red sand stone

351.12

607

213442.33

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

30.22

4950

149598.9

... More
1:6 (1 cement :6 coarse sand)

205.2

164

33819.01

... More
Park-2(D-546)

-

-

-

... More
Steel work welded in built up sections/ framed work including priming coat - ingrating, frames, guard bar ladder, railing, brackers, gates and similar works. Item code :10.25.2 (Sail Steel)

131.28

88

11619.59

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

23.6

4950

116810.1

... More
Red sand stone

351.12

607

213442.33

... More
Finishing walls with water proofing cemtn paint: New work (Two or more Coats) Item Code: 13:44.1

461.16

61

28439.74

... More
Park-21 (F-304)

-

-

-

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Steel work welded in built up sections/ framed work including priming coat - ingrating, frames, guard bar ladder, railing, brackers, gates and similar works. Item code :10.25.2 (Sail Steel)

131.28

88

11619.59

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

39.42

95

3744.9

... More
Steel work welded in built up sections/ framed work including priming coat - ingrating, frames, guard bar ladder, railing, brackers, gates and similar works. Item code :10.25.2 (Sail Steel)

131.28

88

11619.59

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

30.78

95

2924.1

... More
Finishing walls with water proofing cemtn paint: New work (Two or more Coats) Item Code: 13:44.1

461.16

61

28439.74

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

39.42

95

3744.9

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

123.93

5820

721260.96

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

30.22

4950

149598.9

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281)

304.18

5820

1770304.32

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
40 mm tick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1"5 (1 cement: 5 coarse sand) with jointd finishing flush. DAR-18/11.28.1

-

-

-

... More
Steel work welded in built up sections/ framed work including priming coat - ingrating, frames, guard bar ladder, railing, brackers, gates and similar works. Item code :10.25.2 (Sail Steel)

131.28

88

11619.59

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

113.94

95

10824.3

... More
Red sand stone

489.72

607

297695.89

... More
M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 305(a)

111.78

4950

553311

... More
Finishing walls with water proofing cemtn paint: New work (Two or more Coats) Item Code: 13:44.1

461.16

61

28439.74

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
1:6 (1 cement :6 coarse sand)

262.8

164

43312.07

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

41.83

95

3973.44

... More
12mm cement plaster of mix (1:6) DAR-18/13.4.2

-

-

-

... More
Cement concrete with 4 cm gauge approved stone ballast, coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279)

6.72

7000

47012

... More
Red sand stone

351.12

607

213442.33

... More
Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA

30.78

95

2924.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.