Greater Noida Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Greater Noida Industrial Development Authority - GNIDA Tender
Environmental Service
Eprocure
Opening Date16 Jan 2024
Closing Date29 Jan 2024
Tender Amount₹ 2,22,77,022
Costs
EMD
₹ 4,46,000Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GNIDA_881427_14Bid Award Id
ViewTender No
SM/(E-TENDER CELL)/2024/489 DATE-11.01.2024Tender Authority
Greater Noida Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.greaternoidaauthority.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Clearing of Jungle including uprooting of weeds ran vegetation grass brush wood trees and sapling of girth up to 30cm measured at height of 1.00mtr. Above ground level removal of rubbish up to a distance of 50mtr. Out side the periphery of the area cleared (As per UP PWD SOR item No. 259 (i)( Area Should be clean each and everypoint of time)
182760
1215354
6.65
... More
Digging of holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%:1 part of stacked volume of manure after reduction by 8%) flooding with water dressing including removal of rubbish and surplus earth if any with all leads and lifts cost of manure sludge of extra good earth if needed to be paid for separately pit size.
-
-
-
... More
0.90 mtr. dia & 0.90mtr. deep (Trees) (A.R. GNIDA)
12000
1140600
95.05
... More
Supplying and stacking of well decayed cow dung manure at site including royalty and carriage with all leads and lifts ( manure shall be measured in stacks and will be reduced by 8% for payment.) (A.R. GNIDA)
-
-
-
... More
Trees
3480
1254366
360.45
... More
Supply of Neem Oil cake pulverized and un-decordicated packed in bags (As per market rate)
-
-
-
... More
Trees (A.R. GNIDA)
24000
330000
13.75
... More
Supply of Steamed bone meal at site packed in bags. (As per market rate)
-
-
-
... More
Trees (A.R. GNIDA)
24000
330000
13.75
... More
Supply of chlorpyriphos 20% E.C for anti termite treatment of plants @ 2ml. /plant and in the interval 1 month up to one year I.E.12 times in a year hence in comes 0.024 ltr. / plant (As per market rate)
-
-
-
... More
Trees (A.R. GNIDA)
864
311040
360
... More
Supply & Planting of plants as required by engineer incharge in 8’ X 12’.size polythene bags or erthen pots well branched and fully foliage branching dia 0.50 to 0.75mtr. , free from disease at site i/c stacking with bamboos and binding with sutli (not below than 6’-8’ common varieties) (As per market rate) (Neem , Amaltas, Jamun , Pilkhan ,Papdi, Arjun , Cassia Semia)
-
-
-
... More
Trees (A.R. GNIDA)
12000
1800000
150
... More
Complete maintenance of trees in green belt (out side garden features) jobs like making of basin at regular interval i/c watering , weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T& P material . articles shall be provided by the contractor) and as per direction of officer in charge.(A.R. GNIDA)
-
-
-
... More
(i) Trees (upto 4 & upto 3 years slow & fast growing group) (respectively) (12000 Nos. x 36 months = 432000)
432000
3801600
8.8
... More
Providing and watering for irrigation water through boring and RH Pipe in green belt of Horticulture features i.e.lawn, trees, shrubs , hedge /edge , ground cover etc. at the site of work i/c supply of water and RH Pipe for watering each plant and complete arrangement of watering with DG Set , boring pump and labour for watering at site with all leads and lifts as per direction of officer in charge.(A.R. GNIDA)
-
-
-
... More
(i) Trees (upto 4 & upto 3 year slow & fast growing group) . (respectively) (12000 Nos. x 36 months = 432000)
432000
3045600
7.05
... More
IRRIGATION WORK (PART-B)
-
-
-
... More
D/I/T/C tube well including all material & labour with submersible pump, panel board etc. Complete with 3 HP KSB, G.I. Medium Duty PVC Pipe of 6kg/cm.sq. make of pipe approved by GNIDA, depth of boring 120 feet.(A.R. GNIDA)
18
925020
51390
... More
Excavation & back filling the trench for PVC Pipe line with all labour T&P etc. complete. (size 1.00x 0.45x0.9) as per UP PWD SOR rate.
4569
175906
38.5
... More
P/F following size of Finolex makes PVC, pipes 6.0 kg/cm2 with required PVC Standard special confirming to IS codes with latest amendment and lowering the same tranches and laying true to alignment and gradient complete i/e the cost of cutting of pipes for making up to length and making joints i/c cost of socket.
-
-
-
... More
Plsiochem PV-85 pvr solvent cement complete PVC pipe must the confirming to IS: 4985-2000 with latest amendment, Make-Finolex/ Kisan/supreme Industries Ltd. (Rate as per comparative statement per Rm.)
-
-
-
... More
90mm dia with coupler @6kgf/ Cm2 pressure with i/e all PVC Standard specials (A.R. GNIDA)
4569
955377
209.1
... More
Providing and fixing hydrant with all complete.
(A.R. GNIDA)
200
53200
266
... More
S/F submersible motor pump CRI make of 3 HP fixing and all material and labour complete.
(A.R. GNIDA)
18
624210
34678.35
... More
Excavation in foundation in ordinary/soil (Loam, clay or sand) including lift upto 1.50 M , and lead upto 30 M and including filling watering and ramming of excavated earth in to trenches or into the space between the building and the sites of foundation trenches into the plinth and the removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. form the foundation trenches. (Where machine can not reach/move) SOR-2020/251(a)
419.42
39844
95
... More
Providing and laying in position cement concrete of specified grate excluding the cost of centring and shuttering.
All work upto plinth level.
-
-
-
... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size).
SOR-2020/280
320.35
1938117
6050
... More
Supply at site R.C.C Standards Post/struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 m m nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
DSR-18/16.15.11 A.R
48.23
932816
19341
... More
Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used.
-
-
-
... More
With G.I. barbed wire
DSR-18/16.17.11 A.R
102223.76
904680
8.85
... More
White coat one coat including supply of all Materials, Labour, Tools & Plants etc, required for proper completion of the work.
-
-
-
... More
Old work (three or more coat)
SOR-2020/671
2243.8
10097
4.5
... More
Labour Cess will be paid extra as per applicable
-
-
-
... More
GST will be paid extra as per applicable
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements