Greater Noida Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Greater Noida Industrial Development Authority - GNIDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Mar 2022
Closing Date29 Mar 2022
Tender Amount₹ 15,15,78,339 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dense Bituminous Macadam using Hot Inplant Technology Application Hot in plant recycling technology to strengthening of existing wearing course upto 60 mm thickness as per MORTH specification (Section 519 -mainly clause no. 519.4.2 and 519.6) conforming to grading of specification. Bitumen and virgin asphalt in following proportion:- (i) Fresh Bituminous concrete conforming to Grading Specification @ 70% of addition of total mix other then recycled. (ii) Bitumen VG-30 for Bitumen @ 5.5% of by weight of fresh aggregates. (iii) Binder @ 2% by weight of mix.

-

-

-

... More
Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stockpiling the reclaimed material near the central recycling plant after carring out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the rquired grade, level and thickness, all as specified in clause 519. (AR/GNIDA)

4868.1

-

9728.9

... More
Providing and laying dense graded bitumen macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder 60/70 @ 4.25% of mix and filler transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level, and alignment rolling with smooth, wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause 507 complete in all respects. (MORTH/507) (A.R./GNIDA)

-

-

-

... More
100mm compacted thickness with bitumen penetration of 60/70 @ 4.25% by weight of total mix.

4868.1

-

9648.05

... More
Stone Matrix Asphalt (SMA) Providing and laying Stone Matrix Asphalt (SMA) as per MoRTH specification using crushed stone aggregate of specified grading, premixed with bituminous binder and lime filler and cellulose fiber transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tendem rollers to achives the desired compaction and density as per MoRTH specification (5th revision), complete in all respects and as per direction of Enginnering in charge. (I) 50 mm compacted thickness with bitumen of grade VG-30/VG-40 @ 5.8-6.0% (percentage by weight of total mix) and lime filler @ 10% (percentage by weight of aggregate) as per MoRTH and cellulose fiber pellets @ 0.3% by weight of total mix are used and prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. (AR/GNIDA)

2434.05

-

13035.4

... More
Earth work in excavation in ordinary soil in all type of foundation trenches including dressing of the side and ramming of bottom. Lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. All kinds of soil. (MORTH/A.R./GNIDA)

-

-

-

... More
Depth from 0.0 to 1.5 M below G.L.

2573.29

-

109.26

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m. (AR/GNIDA)

643.32

-

54.03

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: (Cast-in-Situ)

-

-

-

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). (DSR-13/4.1.8/P-85)

151.12

-

3920.65

... More
Providing and laying in position machine batched, machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centring, shuttering, finishing and reinforcement, including admixtures in recommended proportion as per IS : 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note: Cement content considered in this item is @ 330 Kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately).

-

-

-

... More
All works upto plinth level. (DSR-13/5.33.1/P-101)

474.9

-

5704.45

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-mechanically treated bars/Cold twisted bars. (DSR-13/5.22.6/P-99)

39992.61

-

66.5

... More
Centring and shuttering including strutting, propping etc. and removal of form for:

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete. (DSR-13/5.9.1/P-97)

385.56

-

186.4

... More
Wall (any thickness) including attached pilasters, buttresses, plinth and string courses etc. (DSR-13/5.9.2/P-97)

4121.28

-

334.5

... More
Suspended floors, roofs, landings, balconies and access platform. (DSR-13/5.9.3/P-97)

46.8

-

371.8

... More
Add labour cess @ 1% on all above items

142024760.09

-

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.