If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Greater Noida Industrial Development Authority - GNIDA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Mar 2025
Closing Date7 Apr 2025
Tender Amount₹ 22,05,490
Costs
EMD
₹ 45,000Document Cost
₹ 840Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_GNIDA_1020311_12Tender No
SM/(E-TENDER CELL)/2025/584 DATED-20.03.2025Tender Authority
Greater Noida Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.greaternoidaauthority.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. ( As per item sor no. 281)
3.37
5820
19613.4
... More
M-150 Brick work in 1:4 Cement & Coarse Sand 2.20 F.M mortar in foundation and plinth including supply of matarial, Labour and T&P etc. required for proper completion of the work.1:4 one cement and four coarse sand of 2.20 F.M mortar above but in supersturcture including BASED ON SOR- 305 (a)
11.44
4950
56628
... More
Plain /Reinforced cement concrete in sub structure complete as per drawing and technical specification
-
-
-
... More
RCC Grade M-25 using batching plant transit mixture & Concrete Pump
2.1
8043
16892.32
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. ( As per item sor no. 279)
1.35
7000
9450
... More
M-150 Brick work in 1.6 cement & fine sand 1.25 F.M Mortar in foundation and plinth including supply of all Materials, Labour and T&P ete, required for proper completion of the work. in 1:4 one cement & four coarse sand of 2.20 F.M Mortar above but in superstructure including necessary cutting & moulding of brick as required thickness of walls not be less than I ½ brick Add extra labour to above items. BASED ON SOR- 305(a). 309
21.32
5260
112143.2
... More
Supply and Fixing of R.C.C. Grill work 9(JALI) of approved pattern & make at site of work in cement concrete consisting of cement, approved coarse sand and 6 mm. nominal size stone grit in the proportion of 1:2:4 & reinforced with 6 mm. dia M.S. wire/bar including cutting & finishing with 1:3 cement and & fine sand of 1.25 fineness modules mortar including including supply of all materials. Labour. Tools & Plants etc, required for proper completion of the work but excluding plaster on jambs. still & soffit of the opening. (1) 5.00 cm. thick. Based On Sor 21.17
51
735
37485
... More
Washed stone grit plaster on exterior walls of height upto 10 metre above ground level, in two layers, under layer 12mm cement plaster 1:4 (1cement: 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square metre, top layer 15mm cement plaster 1:1/2:2 (1 cement: 1/2 coarse sand :2 stone chipping 10mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippings, complete as per specification and direction of Engineer-in- charge (Payment for providing grooves shall be made separately). BASED ON DAR-18/13.72
126.4
560
70906.61
... More
Forming groove of uniform size in the top layer of washed stone grit plaster as per approved pattern using wooden battens, nailed to the under layer, including removal of wooden battens, repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge :
-
-
-
... More
15 mm wide and 15 mm deep groove
Based on DAR-18/13.73.1
270.3
31
8617.16
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(Sail Steel)
based DAR-2018/5.22.6
246.69
96
23724.18
... More
Providing wall putty on new surface with approved quality matarial of Berger/J.K / Birla or similar make Two Coat SOR-CH-8/15.22/New Item
122.4
63
7711.2
... More
Colour washing one coat using approved Colouring material buff, blue,gray, or brown shade including supply of all matarials labour , Tools, & Plants etc. required for proper completion of the work But two coats SOR-CH-9 / 16.05 (19.0+11.0)
122.4
30
3672
... More
15 mm cement plaster:
-
-
-
... More
1:6 (1 cement : 6 coarse sand)
based DAR-2018/13.5.2
87.97
191
16833.06
... More
Total (All above items for 51 Rmt.)
1
387137
387137.77
... More
Total (54.42+34.02+62.83+34.95-5.0)=181.22
(Cost of 1 mtr.= 387137.77/ 51 Rmt. = 7590.94) (Cost of 181.22 mtr.)
181.22
7590
1375630.15
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
472.3
258
122221.79
... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 metres.
(DSR-16.01)
165.3
83
13721.55
... More
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks Based on DAR 18./11.2
165.3
571
94444.16
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. ( As per item sor no. 281)
16.53
5820
96204.6
... More
Plain /Reinforced cement concrete in sub structure complete as per drawing and technical specification
-
-
-
... More
RCC Grade M-25 using batching plant transit mixture & Concrete Pump
41.33
8043
332456.87
... More
Excavation in Foundation in ordinary soil (Leam Clay or Sand ) including lift upto 1.50 m and lead upto 30 m and including filling watering and ramming of excavated earth into bthe trenches or into the space between the building and the sides of foundation tranches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation tranches SOR - 251 (a)
22.94
95
2179.3
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. ( As per item sor no. 281)
4.54
5820
26422.8
... More
M-150 Brick work in 1:6 Cement & fine Sand 1.25 F.M mortar in foundation and plinth including supply of matarial, Labour and T&P etc. required for proper completion of the work. But in 1:4 one cement and four coarse sand of 2.20 F.M mortar Based on SOR-305 (a)
10.14
4950
50193
... More
12 mm cement plaster of mix:
1:6 (1 cement: 6 coarse sand) Based on DAR 18/13.4.2
44.08
164
7264.82
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. ( As per item sor no. 279)
1.27
7000
8890
... More
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.(Sail Steel)
-
-
-
... More
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. BASED ON DAR-18 10.25.2
629.5
88
55717.05
... More
Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sqm) paint (Birtish antesol or equivalent) including supply of all matarials , labour, Tools & plants etc. required for proper completion of the work . Paint to be used should confirm the ISI Every coat after the first Coat SOR-CH-8/15.05 (53.0+21.0)
12.5
74
925
... More
Plain /Reinforced cement concrete in sub structure complete as per drawing and technical specification
-
-
-
... More
RCC Grade M-25 using batching plant transit mixture & Concrete Pump
0.99
8043
7963.52
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(Sail Steel)
based DAR-2018/5.22.6
117.04
96
11255.74
... More
Labour Cess and GST will be paid extra as per govt. orders
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%