Greater Noida Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Greater Noida Industrial Development Authority - GNIDA Tender
Civil And Construction
Eprocure
Opening Date16 Mar 2022
Closing Date5 Apr 2022
Tender AmountRefer Documents
Costs
EMD
₹ 4,73,000Document Cost
₹ 4,140Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_GNIDA_678503_40Bid Award Id
ViewTender No
GM/(ENGG.)/2022/343 DATE-12.03.2022Tender Authority
Greater Noida Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.greaternoidaauthority.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Trees (Above 3 years) (Road side)
74088
-
5.8
Trees (Below 3 years) (In green belts)
160392
-
5.75
Trees (Above 3 years) (In green belts)
320784
-
2.25
Shrubs (Below 3 years)
399492
-
2.9
Trees (Above 5 years) (25% damaged & slow growing plants)
345168
-
5.8
Trees (Above 5 years) (75% damaged & slow growing plants)
86289
-
29
Providing watering by submersible pump boring including 7.5 HP generator boring accessories cost of diesel, mobile oil, RH pipe repairing of pump, pipe line & generator etc. & labour for watering of plant to work will be done as per direction of Engineer-Incharge. (with oil diesel etc. complete)
-
-
-
Trees (Below 3 years) (In green belts)
160392
-
3.07
Trees (Above 3 years) (In green belts)
320784
-
2.25
Shrubs (Below 3 years)
60480
-
3.07
Shrubs (Above 3 years)
120960
-
1.83
Watering by water tanker including source of water and R.H. pipe from tanker to each plant for complete arrangement of watering as per direction of Engineer-in-charge with maintenance of boring, pump, diesel, oil etc. complete.
-
-
-
Trees (Below 3 years) (Road side)
37044
-
5.7
Trees (Above 3 years) (Road side)
74088
-
3.5
Shrubs (Below 3 years) (Road side)
72684
-
3.5
Shrubs (Above 3 years) (Road side)
145368
-
2.2
Supplying and stacking of well decayed cow dung manure at site including royalty and carriage with all leads and lifts (manure shall be measured in stacks and will be reduced by 8% for payment.) (Manure shall applied two times in a year).
2884.09
-
226
Supply of pulverised & un-decordicated neem oil cake at site packed in plastic bags with all carriage & lead.
33002.25
-
9.5
Supply of steamed bone meal @ 1 kg per plant at site packed in plastic bag with all carriage & lead.
33002.25
-
10.7
Supply of chlorpyriphos 20% E.C. for anti termite treatment of plants @ 2ml per plant and in the interval 1 month per year i.e. 12 times in a year hence it comes 24ml/plant or 0.024 Ltr./plant at site with all carriage & lead.
1983.6
-
220
Clearing of jungle uprooting of weeds rank vegetation, grass, brush wood and sapling girth upto 30cm measured height of 1.00m above ground level and removal of rubbish upto a distance of 50mtr. Out side periphery of the area cleared. Green belt should be clean each and every point of time. (AR/GNIDA)
2513922.56
-
2.1
Tractor trolley with driver and including POL (AR/GNIDA)
720
-
1725
Supply of labour (AR/GNIDA)
2880
-
225
Part-B (Civil work)
-
-
-
Excavating holes more than 0.10 cum & upto 0.50 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing of surplus excavated soil, as directed within a lead of 50m and lift upto 1.5m. (AR/GNIDA)
-
-
-
All kinds of soil.
3104
-
54.63
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: (Cast-in-Situ)
-
-
-
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). (DSR-13/4.1.5/P-85)
279.36
-
4408.55
Supplying at site: R.C.C. standards post/struts/rails/pales of mix 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 12.5mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). (DSR-13/16.15.1/P-263)
90.01
-
19081.45
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 Kg. per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used.
-
-
-
With G.I. barbed wire. (DSR-13/16.17.1/P-263-264)
84627.9
-
8.15
White washing with lime to give an even shade: Old work (two or more coats). (DSR-13/14.42.1/P-241)
13930.8
-
8.55
Add 1% for labour cess on Part-B (Civil work)
3927491.09
-
0.01
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements