Greater Noida Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Greater Noida Industrial Development Authority - GNIDA Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date23 Sep 2024
Closing Date3 Oct 2024
Tender Amount₹ 95,24,750 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shurbs (0.45mtr. Dia & 0.45mtr deep)

5000

63750

12.75

... More
Supply and stacking of well decayed cattle manure site including royalty and carriage up to 5 Km. lead completed. (Cattle manure measured in stacks will reduced by 8% for paymennt)

1654.87

596497

360.45

... More
Supply of gypsum at site.

2548

11466

4.5

... More
Supply of neem oil cake pulverized and undecordicated packed inn bages.

6758

92922

13.75

... More
Supply of stemed bone meal at site packed in bages.

6758

92922

13.75

... More
Supply & Planting of plants common varieties as required by engineer-in-charge in 8" X 12" sixe polythene bags or earthen pots well brandched and fully foliage branching dia 0.50 to 0.75mtr., free from disease at site i/c stacking with bamboos and binding with sutli (not below then 6'-8' common varieties) (As per market rate) (Neem, Amaltas, Jamun, Pilkha, Papdi, Arjun, Cassia Semia)

1214

182100

150

... More
Supply & Planting of Shrubs, Plants height 2-2.5 feet as required by engineer in charge 16" X 8" Polythene bags or earthen pot fully foliage ad well branched free from disease (As per market rate)

5000

285000

57

... More
Supply of chloropyriphos 20% E.C./Lindan 20% E,C, FOR Anti-Termite treatment of plants@2ml/plant in the interval of 01month up to one year i.e.12times in a year hence it comes 0.24ml/per plant. As per market rate)

347.47

125089

360

... More
Rough dressing the trenched ground including breaking clods.

2788.44

2286

0.82

... More
Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation.

2788.44

7389

2.65

... More
Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/or good earth to be paid separately).

69.71

2007

28.8

... More
Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in- charge

627.4

12384

19.74

... More
Supply of selection-1/doob grass in carpet at site fresh and free from weeds having proper roots in green including loading, unloading carriage and all taxed paid etc. and per direction of officer in charge (1 Sqm carper grass covers 4.0Sqm area of grassing)

697.11

37887

54.35

... More
Grassing with selection no doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth it needed (The grass and good earth shall be paid for separately)

-

-

-

... More
In rows 5 cm apart in both direction

2788.44

26769

9.6

... More
Supply of DAP at site.

12728.21

369118

29

... More
Fixing of tree guard at site

280

5628

20.1

... More
Providing and stacking of Plumeria alba of height 165-180 cm, with 3-4 branches and thick stem in big size HDPE bags as per direction of the officer- in-charge. DSR-2018/167/7.70

60

13500

225

... More
Providing and stacking of Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 20 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. DSR 2018/153/6.6

1250

12812

10.25

... More
Pruning, Trimming, Shaping of trees./shrubs(ht 15foot and above) i/c removle of cut material upto 50mtr lead and as per direction of officers incharge (Necessary T&P shall be arranged by the contractor POL) (AR/GNIDA)

625

31625

50.6

... More
Providing JCB with driver and including POL (R/GNIDA)

3

26334

8778

... More
Supply of tractor trolley with driver and including POL (AR/GNIDA)

200

369600

1848

... More
Supply of labour (AR/GNIDA)

200

78540

392.7

... More
Renovation lawn including weeding and cheeling the grass forking the ground top dressing with sludge of manure, mixing the same with forked soil watering and maintaining the lawn for 30 days of more till the grass from a thick lawn free from weeds and fit or mowing and disposal of rubbish as directed, including supplying good earth if needed but excluding the cost of sludge of manure (the good earth sahll be paid for separately)

12728.21

236744

18.6

... More
Complete maintainance of Trees on road side plantation (RSP) out side garden features) job like making of basin at regular interval i/c watering, weeding, pruning & application of fertilizer etc, (ezcluding the cost of material which shall be supplied by the department and other T&P material/ article shall be provided by the contractor) and as per direction of officer in charge.

-

-

-

... More
Trees (upto 4 & 3 year slow fast growing grooup) (respectively) (1214 x 23 month = 27922 nos)

27922

1147594

41.1

... More
Complete maintanance of shrubs on RSP (OUT SIDE garden features) (job like making of basin at regular interval i/c watering, weeding, pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T& P material/ article shall be provided by the contractor) and as per direction of officer in charge. ( 8320 x23 month = 191360 nos)

191360

1961440

10.25

... More
Providing and watering for irrigation through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge / edge, ground cover etc. at the side of work water tanker having 5000 Ltr. Capacity with one labour for watering / I/C cost off water, filling of tanker, watering at side with all leads and lifts as per direction of officer in charge.

-

-

-

... More
Trees (upto 4 & upto 3 year slow & fast growiing group) (Below 3year) (respectively) (1214 x 24 month = 29136 nos)

29136

297187

10.2

... More
Watering of 1 to 3 year plants (for Shrubs) ( 8320 x 24 month =199680 nos)

199680

1018368

5.1

... More
Providing and watering for irrigation through boring and RH Pipe in green belt of Horticulture features i.e. lawn, trees, shrubs, hedge/edge, ground cover etc. at the site of work i/c supply of water and RH Pipe for watering each plant and complete arrangement of watering with DG set boring pump and labour for watering at site with all leads and lifts as per direction of office in charge.

-

-

-

... More
Watering of 1 to 3 year plants (for Shrubs) ( 666 x 24 month = 15984 nos)

15984

112687

7.05

... More
Complete maintenance of the entire Garden featured having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, ledge, flower, beds foliage creeper etc. including hoeing wedding, pruning, replacement of palnts gap filing, watering, mowing of lawn, grass cutting by lawn moved and brush cutter, removal of garden waste, applying in secticide, pesticide & fertilizer, (Whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as per directed by officer in charge, (cost of good eawrth, manure, fertilizer, insecticide, pesticide will be provided by constractor) and as per direction officers in charge.

-

-

-

... More
Openn space (23670.96 x 24 month = 568103.04 sqm)

568103.04

568103

1

... More
Providing profuse watering arrangement for lawn/Park at site to make available for irrigation i.e. Diesel engine & Oil etc. RH Pipe/Canvas Pipe & other T&P and carriage Etc. complete. (As per Noida Authority Approved) ( 5.85 x 24 month = 140.4 acre)

140.4

1262701

8993.6

... More
D/I/T/C tube well boring of 150mm dia including all material & Labour complete PVC boring pipe and stainer of make Finolex / Kisan /Supreme approved by engineering in charg eof boring 200 feet.

3

154170

51390

... More
Excavation & back filling the trench for PVC Pipe line with all labour T&P etc. complete (size 1.00 x 0.45 x 0.9) as per UP PWD SOR rate.

600

23100

38.5

... More
Providing of following size fo Finolex makes PVC, pipes 6.0 kg./cm2 with required PVC Standard special confirming to IS codes with latest amendment and lowering the same tranches and laying true to alignment and gradient complete i/e the cost of cutting of pipes for making upt to length and making joints i/c cost of socket. Plsiochem PV-85 pvr solvent cement complete PVC pipe must the confirming to IS: 4985-2000 with latest amendment, Make Finolex / Kisan/supreme Industries Ltd. (Rate as per comparative statement Per Rm.) 90mm dia with coupler @ 6kg/Cm2 Pressure with i/e all PVC Stanared specials

600

125460

209.1

... More
Provding and fixing hydrant with all complete.

40

10640

266

... More
Civil Work

-

-

-

... More
Excavating holes up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing within a lead of 50m and lift upto 1.5m.

9.52

904

95

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:

-

-

-

... More
1:4:8 (1 cement: 4 coarse sand: 8 graded stone)

10.25

62012

6050

... More
Supply at site R.C.C Standards post/struts/rails/ pales of mix 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 12.5 m m nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately).DSR-2013/16.15.1

2.72

52607

19341.04

... More
Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used. DSR-2018/16.18.1

-

-

-

... More
With G.I. barbed wire

844.2

7395

8.76

... More
White Washing with lime to give and even shade.

-

-

-

... More
New work (three or more coat) SOR-2020/671

121.94

548

4.5

... More
Labour Cess and GST will be paid extra as per govt. orders

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.