Greater Noida Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Greater Noida Industrial Development Authority - GNIDA Tender
Agriculture or Forestry Works
Eprocure
Opening Date23 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 1,17,13,232
Costs
EMD
₹ 2,35,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GNIDA_986054_4Bid Award Id
ViewTender No
SM/(E-TENDER CELL)/2024/547 DATED- 19.12.2024Tender Authority
Greater Noida Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.greaternoidaauthority.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply of 360 Degree Rotating automatic garden plastic sprinkler with metal stand (G.I Pipe) 2Wheel, Dimension (L X W X H) 50.8 X 48.26 X 73.66cm weight 850gm. The sprinkler shall be capable of both non recresing full circle and part circle opration in the same unit. Manual rotation in any direction the sprinkler shall automatically return the water stream to its preset arc. The adjustment can be perform on both the right and left trip of the sprinkler.
16
700
11200
... More
Digging of holes in ordinary soil and refilling the same with excavated earty mixed with manure of sludge in the ration 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% 1 part of stacked volume of manure after reduction by 8%) flooding with water dressing inlcuding removal of rubbish and surplus earth if any with all leads and lifts cost of manure sludge of extra good earth if needed to be paid for Separately pit size.
-
-
-
... More
Shrubs
8600
29
252840
... More
Supply & Planting of shrubs, plants height 2-2.5 feet as required by eigineer in charge in 6' X 8' polythene bags or earthen pot fully foliage and well branched free from disease (as per market rate) approved by GNIDA.
-
-
-
... More
Shrubs
8600
57
490200
... More
Supply of Garden Bench.Having Total Weight.= 70-75 KGS. Size: 5 FT Length. Having Casted Iron Sides Of Each With FRP Strips.
10
11500
115000
... More
Supply and stacking of well decayed cattle manure site including royalty and carriage up to 5 Km. lead completed. (Cattle manure measured in stacks will reduced by 8% for payment)
3770.04
360
1358910.92
... More
Supply of Neem oil cake pulverized and un- decordicated packed in bages.
6450
13
88687.5
... More
Supply of stemed bone meal at site packed in bages
6450
13
88687.5
... More
Supply of chloropyriphos 20% E.C./Lindan 20% E,C, for Anti-Termite treatment of plants@2ml/plant in the interval of 01month up to one year i.e.12times in a year hence it comes 0.24ml/per plant. As per market rate)
412.8
360
148608
... More
Supply of DAP at printed plastic bags (as per market rate)
3144
29
91176
... More
Clearing of Jungle inlcuding uprooting of weeds ran vegetation grass brush wood trees and sapling of girth up to 30cm measured at height of 1.00mtr. Above ground level removal of rubbish up to a distance of 50mtr. Out side the periphery of the area cleared (As per UP PWD SOR item No. 259 (i) (Area Should be clean each and everypoint of time).
157561.76
6
1047785.7
... More
D/I/T/C tube well boring of 150mm dia including all material & Labour complete PVC boring pipe and stainer of make Finolex / Kisan /Supreme approved by engineering in charg eof boring 200 feet.
1
51390
51390
... More
Supply and fixing Submersible motor pump CRI make of 3 HP fixing and all material and labour complete
1
34678
34678.35
... More
Excavation & back filling the trench for PVC Pipe line with all labour T&P etc. complete (size 1.00 x 0.45 x 0.9) as per UPPWD SOR rate.
700
38
26950
... More
Providing and fixing following size fo Finolex makes PVC, pipes 6.0 kg./cm2 with required PVC Standard special confirming to IS codes with latest amendment and lowering the same tranches and laying true to alignment and gradient complete i/e the cost of cutting of pipes for making upt to length and making joints i/c cost of socket. Plsiochem PV-85 pvr solvent cement complete PVC pipe must the confirming to IS: 4985-2000 with latest amendment, Make Finolex / Kisan/supreme Industries Ltd. (Rate as per comparative statement Per Rm.) 90mm dia with coupler @ 6kg/Cm2 Pressure with i/e all PVC Stanared specials
700
209
146370
... More
Provding and fixing hydrant with all complete.
28
266
7448
... More
Prunning, trimming, shaping of trees/shrubs (ht. 15 feet and above) I/C removal of cut materials upto 50mtr. Lead and as per direction of office in charge (Necessary T&P shall be arranged by the contractor) (AR/GNIDA) (850 X 2 TIMES = 1700 NOS)
1700
50
86020
... More
Supply of Tractor Trolley with driver and including POL (AR/GNIDA)
730
1848
1349040
... More
Supply of Labour (AR/GNIDA)
1460
392
573342
... More
M-150 brick work in 1:4 one cement or four coarse sand 2.20 F.M mortar in foundation and plinth including supply of all material, labour, T&P etc. (UPPWD/SOR-2020/305(a)
55.67
4950
275566.5
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:
-
-
-
... More
1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) (UPPWD/SOR-2020/279a)
43.67
7000
305690
... More
12 mm cement plaster of mix:
DSR-18/13.4.1/AR
-
-
-
... More
1:4 (1 Cement : 4coarse sand)
599.56
164
98813.48
... More
Providing wall putty on old surface with approved quality material of berger/J.K/Birla or similar make two coats (SOR-2020/662)
10293.72
53
545567.16
... More
Finishing walls with one coat of water proffing cement paint of approved quality on previously old treated surface with this paint to give an even shade including supply of all material, labour, tool and plant etc
-
-
-
... More
Same as item 660 but for weather coat (Asian or Burger Brand) (SOR-2020/662(A)
10293.72
84
864672.48
... More
Excavating holes up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing within a lead of 50m and lift upto 1.5m.
17.52
95
1664.4
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
-
-
-
... More
1:4:8 (1 cement: 4 coarse sand: 8 graded stone)
SOR-281
16.05
5820
93411
... More
Supply at site R.C.C Standards post/struts/rails/pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand: 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). DSR-2013/16.15.1
5.02
21549
108180.7
... More
Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used. DSR-2018/16.18.1
-
-
-
... More
With G.I barbed wire
1557
8
13608.18
... More
White Washing with lime to give and even shade.
-
-
-
... More
New work (three or more coat) SOR-2020/671
449.8
4
2024.1
... More
Labour Cess and GST will be paid extra as per govt. orders
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements