Gorakhpur Industrial Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Gorakhpur Industrial Development Authority Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date16 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 73,34,012
Costs
EMD
₹ 5,67,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UGIDA_974355_1Bid Award Id
ViewTender No
3719/ABHI.NI.-6/GIDA/2024-25 DT. 08.11.2024Tender Authority
Gorakhpur Industrial Development Authority ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse sand and 2 cm (3/4)"gauge' approved stone grit in the proportion of 1:2:4 excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all otehr materials, labour and T&P etc. required for proper completion of the work.SI 282
2.59
7510
19450.9
... More
Total (Applicable G.S.T @18% Extra in All Item )
-
-
7334011.98
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar
443.62
6124
2716728.88
... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. And including filling, watering and ramming of excavated earth in to the space between the building and side of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer in charge. S.I. No. 251
363.65
120
43638
... More
R.C.C work with cement approved coarse sand 2.0 cm gauge sand ballast n the proporton 1:1.5:3 Cement Concrete in complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per Sor Rate Item nocomplete in all respects.
376.75
9515
3584776.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements