Gorakhpur Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Gorakhpur Industrial Development Authority Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 Oct 2022
Closing Date3 Nov 2022
Tender Amount₹ 26,50,482
Costs
EMD
₹ 2,65,000Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UGIDA_741938_1Bid Award Id
ViewTender No
3014/ABHI.NI.6/GIDA/2022-23 DT. 18.10.2022Tender Authority
Gorakhpur Industrial Development Authority ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
(B) By mix in place method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Speicification clause 401.(Applicable G.S.T @18% and 1% Laber cess Extra )
45.24
-
4889
(B) By mix in place method Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density(Applicable G.S.T @18% and 1% Laber cess Extra )
129.25
-
5146
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 Kg/Sqm using mechanical means.(Applicable G.S.T @18% and 1% Laber cess Extra )
1292.5
-
42
Providing and laying dense graded bituminous mecadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects.(Applicable G.S.T @18% and 1% Laber cess Extra )
64.63
-
13229
Providing and applying tack coat with bitumen VG 10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.(Applicable G.S.T @18% and 1% Laber cess Extra )
1292.5
-
13
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finsher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects(Applicable G.S.T @18% and 1% Laber cess Extra )
32.31
-
14587
Total
-
-
-