Gorakhpur Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Gorakhpur Industrial Development Authority Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date12 Aug 2024
Closing Date20 Aug 2024
Tender Amount₹ 3,17,09,853 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick masonary work in cement motar (in 1:3 cement and coarse sand) in foundation complete excluding pointing and plastering as per drawing and technical specification. (Morh clauses 1300))

274.3

1389329

5065

... More
Sand Filling in foundation trench as per drawing and technical specification SOR-255

83.16

72349

870

... More
Providing Concrete for preinforced concrete M-20 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.

149.68

1424205

9515

... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.

311.74

3108047

9970

... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.

194.64

1940560

9970

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504

1030.02

6307842

6124

... More
Providing & laying cement Concrete wearing coarse M-30 grade including reinforcement complete as per drawing and technical specification. Morth Clauses 13.05 G

22.86

346580

15161

... More
Providing Weep holes in Brick masonary/plain/reinforced concrete abutment, wing wall return wall with 100 mm dia AC Pipe, extending through the full width of the structure with slope of 1V:20H towords drawing foce. Complete as per drawing and technical specification. MoRTH clauses 2706 & 2200

104

15912

153

... More
Back filling behind abutment, wing wall & return wall plinth complete as per drawing and technical specification MoRTH clause 710.1.4of IRC 78 & 2200

100.84

549880

5453

... More
Protection Work Providing and laying Filter material underneath pitching in slope as per drawing and technical specification 16.05 2504

147.34

720461

4889.79

... More
Providing and laying Pitching Boulder on slopes laid over prepared filter media as per drawing and technicl specification 16.04 2504

294.68

1289808

4376.98

... More
Earthwork in excavtion for structure as per drawing and technical specification Clause 305.1 including setting out construction of shoring and bracing removel of stump and construction of embankment with as per tecnical clause 11.1 300

338.8

40656

120

... More
Providing and laying stone Boulder in apron/Toe wall and packed and top finished to grade required including cost of all materials labour and T&P atc. Required for proper completion of the work.

338.8

1482314

4375.19

... More
Apporch Work Clearing jungle including uprooting of rank vegetation grass, bush, wood, trees and saplings of girth up to 30cm., Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area cleared.

2280

6840

3

... More
Running of 5Hp Pump for dewatering including arreangment of pump section and delivery pipes and other accessories at site including cost of POL

3840

403200

105

... More
Dag-beling 15 cm (6") deep in one line aligned, with flags and jhandies as directed by Engineers in charge.

0.95

902

950

... More
Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead. (Good Earth brought from out side away from GIDA notified area) MORTH Srno. 3.16 Specification 305.

7772.75

2339597

301

... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10

270.75

1298787

4797

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.complete as per clause 406. Morth

209

1074678

5142

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.complete as per clause 502. Morth Specification 5.01

1045

39710

38

... More
Providing and laying dense graded bituminous macadam with 100 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.

78.37

982994

12543

... More
Providing and applying tack coat with bitumen VG 10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. MoRTH specification clause No. 503 complete in all respects.

1045

11495

11

... More
Providing and laying bituminous concrete with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.

41.8

575168

13760

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.compaction as per MoRTH specification clause No. 803 complete in all respects. SOR Lucknow Pg. 54 Srn 2 Date 18-09-2020

50.67

31314

618

... More
S/F of Pavement Maker (Cat Eye) Type X-ASTMD-4956-04 Avery Dimenson/3-M (USA Make) consisting of ASA plastic housing fitted with tightly adherent plotting compound. The housing shall contain prismatic two glass covered prismatic reflective face to reflect incident light I/C all tax.

190

61750

325

... More
Drain Work Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251

91.59

10990

120

... More
Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280)

8.55

50958

5960

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per MoRTH specification clause No. Case II 12.08 complete in all respects.

46.3

440544

9515

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504

54.52

333880

6124

... More
Diversion Work Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280)

23.04

137318

5960

... More
Np-3 Hume Pipe Supply and laying of 1200 mm dia Np-3 Pipe with coller

80

590000

7375

... More
Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead. (Good Earth brought from out side away from GIDA notified area) MORTH Srno. 3.16 Specification 305.

5234.55

1575599

301

... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10

174

834678

4797

... More
Brick Soling with straight oover Brunt brick laid on Edgeand dry including preparation of subgrade to rescribed camber and including supply of brick, filling joints with local earth sreading blinding coat of 1cm depth of local earth Sor 762(b)

1320

528000

400

... More
Supply and laying of empty bags filled with local sand and carriage up to site of work including stiching loading and unloading atacking and also including supply of all material labour T&P required for proper completion of the work etc. as per direction of engineer in charge

2400

33600

14

... More
Total (Applicable G.S.T @18% Extra in All Item )

-

31709852

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.