Gorakhpur Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Gorakhpur Industrial Development Authority Tender

Works
Eprocure
Opening Date17 Jul 2020
Closing Date5 Aug 2020
Tender Amount₹ 12,06,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granualr Sub-Base with close graded material (By mix in place method)Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.

5776

-

4419

... More
Wet Mix Macadam - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

3633

-

4574

... More
Prime Coat- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means.

20860

-

21.9

... More
Dense Graded Bituminuous Macadam (Gr-II) Providing and laying bituminous concrete with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. ( Including Plastic waste material @ 8% of bitumen content)

1564.5

-

9749

... More
Supply of 80mm thick I shaped mechanically compressed interlocking cement concrete pavers black manufactured by high pressure & controlled vibration machine having plan dimension 200X(600+120mm). With minimum 5mm, Thick topping of O.P. cement mixed with 25% marble power. The compressive strenth of concrete pawar blocks shall not be less than 30 MPa & 4.56 kg./no including cost of all material, labour T&P etc required for proper completion of work as directed by Engineer-in-charge but excluding U.P.T.T. which shall be paid extra as per rules. (Cement Grey/Ordinary Red) As per SI No. NS 10

6400

-

810

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorsing glass beads @250 gms per sqm area, Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35 The finished surface to be level, uniform and free from streak and holes.

746.67

-

427

... More
Protection Work:-

-

-

-

... More
Earthwork in excavation of foundation of structure as per drawing and technical specification, including setting out, construction of shorting and bracing, removal of stumps and other deleterious matter , dressing of sides and bottom, backfilling the excavation earth to the extend required and utilising the remaining earth locally for road work. As per Sr. No. 12.1 MoRT&H Specification 304.

960

-

58

... More
Concrete with 4cm. Gauge Brick Ballast Sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. As per SI No. 275

96

-

3635

... More
Brick Masonry Work in Cement Mortar 1:4 in Foundation upto plinth complete excluding Pointing and Plastering, as per Drawing and Technical Specification.

368

-

4555

... More
Construction of Subgrade and Earthen Shoulders (without royalty) - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Lead 5 Km)

2539.92

-

160

... More
Construction of Median / Divider as per drawing and technical specification for proper completion of work as direction by engineer in charge

-

-

-

... More
Plain cement concrete 1:3:6- nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including for 14 Days

624

-

7797

... More
RCC Grade M20 - Plain / Reinforced Cement Concrete as per Drawing and Technical Specification RCC Grade M20

532.8

-

8788

... More
Mild steel or Iron work in plain work such as concrete or reinforced brick work ( when not included in an over all rates ) wrought to required shape as necessary including bending for proper completion of work and including supply of all steel and wastage and over lapping & hooks

416

-

5119

... More
Construction of RCC Colvert (Span 1.50 Meter Length 30.00Meter)

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. As per Sr. No. 12.1 MoRT&H specification 304

696

-

58

... More
PCC M-15 - Plain / Reinforced Cement Concrete in open foundation complete as per Drawing and Technical Specification.

140.4

-

8264

... More
M 150 Class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, Labour and T&P etc. Required for proper completion of work. As per SOR SI No 307

475.74

-

5065

... More
Plain / Reinforced Cement Concrete as per Drawing and Technical Specification. RCC Grade M -20.

75

-

8788

... More
Mild steel or iron work in plain work such as concrete or reinforced brick work ( when not included in an over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.

73.6

-

5119

... More
Struck pointing with cement mortar consisting of one part cement and 2 part of fine sand of 1.25 FM on brick work including supply of all materials labour and T&P etc. Required for proper completion of work. As per SOR SI No 574

34.24

-

175

... More
(R.C.C.DRAIN WORK) -U-Shaped RCC Drain Construction of U-shaped RCC Drain (Size 1000mmx1000mm) as for Drawing and technical specification

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. As per Sr. No. 12.1 MoRT&H specification 304

6016

-

58

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including for 14 Days

480

-

7797

... More
Plain / Reinforced Cement Concrete as per Drawing and Technical Specification. RCC Grade M -20.

1897.6

-

8788

... More
Mild steel or iron work in plain work such as concrete or reinforced brick work ( when not included in an over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.

1491.2

-

5119



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.