Gorakhpur Industrial Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Gorakhpur Industrial Development Authority Tender

Works
Civil And Construction
Eprocure
Opening Date12 Dec 2022
Closing Date28 Dec 2022
Tender Amount₹ 4,65,11,938 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10 (Applicable G.S.T @18% Extra )

1105.73

5299763

4793

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.complete as per clause 406. Morth Specification 4.14 (Applicable G.S.T @18% Extra )

848.23

4282713

5049

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. (Applicable G.S.T @18% Extra )

4241.16

178128

42

... More
Providing and laying dense graded bituminous macadam with 100 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Applicable G.S.T @18% Extra )

318.09

4157436

13070

... More
Providing and applying tack coat with bitumen VG 10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. MoRTH specification clause No. 503 complete in all respects. (Applicable G.S.T @18% Extra )

4241.16

55135

13

... More
Providing and laying bituminous concrete with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Applicable G.S.T @18% Extra )

169.65

2447540

14427

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. (Applicable G.S.T @18% Extra )

138.6

85654

618

... More
S/F of Pavvement Maker (Cat Eye) Type X-ASTMD-4956-04 Avery Dimenson/3-M (USA Make) consisting of ASA plastic housing fitted with tightly adherent plotting compound. The housing shall contain prismatic two glass covered prismatic reflective face to reflect incident incident light I/C all tax. (Applicable G.S.T @18% Extra )

594

192456

324

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251 (Applicable G.S.T @18% Extra )

1709.1

205092

120

... More
Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280) (Applicable G.S.T @18% Extra )

210.6

1255176

5960

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per MoRTH specification clause No. Case II 12.08 complete in all respects. (Applicable G.S.T @18% Extra )

878.34

8301191

9451

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 (Applicable G.S.T @18% Extra )

1034.24

4979865

4815

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251 (Applicable G.S.T @18% Extra )

383.21

45985

120

... More
Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280) (Applicable G.S.T @18% Extra )

52.79

314628

5960

... More
Brick masonary work in cement motar (in 1:3 cement and coarse sand) in foundation complete excluding pointing and plastering as per drawing and technical specification. (Morth Clauses 1300) (Applicable G.S.T @18% Extra )

63.71

469606

7371

... More
Sand Filling in foundation trench as per drawing and technical specification MoRTH clause 304 (Applicable G.S.T @18% Extra )

68.67

92429

1346

... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II. (Applicable G.S.T @18% Extra )

123.61

1232391

9970

... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II. (Applicable G.S.T @18% Extra )

65.67

654729

9970

... More
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II. (Applicable G.S.T @18% Extra )

132.11

1317136

9970

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 (Applicable G.S.T @18% Extra )

467.48

2250916

4815

... More
Brick masonary work in cement motar (in 1:3 cement and coarse sand) in foundation complete excluding pointing and plastering as per drawing and technical specification. (Morth Clauses 1300) (Applicable G.S.T @18% Extra )

15.54

114545

7371

... More
Pointing with Cement Mortar 1:3 on Brick work in substructure as per technical specification MoRTH Clauses 1300 & 2200 (Applicable G.S.T @18% Extra )

125.24

9330

74.5

... More
Providing & laying cement Concrete wearing coarse M-30 grade including reinforcement complete as per drawing and technical specification. Morth Clauses 13.05 G (Applicable G.S.T @18% Extra )

18.39

187614

10202

... More
Providing Weep holes in Brick masonary/plain/reinforced concrete abutment, wing wall return wall with 100 mm dia AC Pipe, extending through the full width of the structure with slope of 1V:20H towords drawing foce. Complete as per drawing and technical specification. MoRTH clauses 2706 & 2200 (Applicable G.S.T @18% Extra )

68

10404

153

... More
Back filling behind abutment, wing wall & return wall plinth complete as per drawing and technical specification MoRTH clause 710.1.4of IRC 78 & 2200 (Applicable G.S.T @18% Extra )

50.4

126151

2503

... More
Total

-

46511937

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.