Gorakhpur Industrial Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Gorakhpur Industrial Development Authority Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Oct 2024
Closing Date13 Nov 2024
Tender Amount₹ 56,38,290 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mild steel or iron work in plain work such as reinforced cement concrete (when not included in over all rate) wrought to required shape as necessary including bending for proper completion of work, supply of steel, all labour etc. required and including wastage bend, hooks and authorised over lapping shall be measured.

147.3

6124

902065.2

... More
M-150 brick work in 1:4 cement and C/sand mortar 4 in foundation and plinth including supply of all materials, labour and Tools and Plants etc. required for proper completion of work.

36.97

4555

168398.35

... More
M-150 brick work in 1:3 cement and C/sand mortar 3 in Super Statecher including supply of all materials, labour and Tools and Plants etc. required for proper completion of work.

58.88

5065

298227.2

... More
12mm Thick plaster with cement mortar in proportion of 1:3 cement and fine sand of 1.25 FM over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including

412.57

135

55696.95

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. D.S.R. 13.80

412.57

99

41174.49

... More
Finising walls with water proof cement paint of approved make and on new work with 3 coat to give an even shade including supply of all materials labour and tools and plants etc. required for proper completon of the work. (S.I. No. 660 + 661)

92.47

28

2589.16

... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause . Morth Specification 4.10

8.1

4797

38855.7

... More
Providing and laying of rubber moulded Interlocking M-40 cement concrete 100 mm tiles including compacted bed of fine sand compacting and proper embedd ing/ laying of In terlocking tiles levelling and dressing of surface to required level and slope, filling Joints with fine sand Including the cost of material, labour T&P etc.required for proper completion of the work Morth 6.30 1500gradation after blending to be as per specifications,cement content not to be lessthan 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not tobe less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-incharge.As Per SOR dt.01.11.2021 SI No- 280 P-43

54

1335

72090

... More
Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 with an admixture of pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) :

380

5269

2002505

... More
Providing and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufgrouting of joints to be made separately). Size of Tile 600x600 mm. D.S.R. 11.46.2

8

1339

10718.32

... More
Providing & Fixing GIDA Logo over sheet.As per approved by Engineer In Charge.

31.32

20000

626400

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position:4"x3" Sor

0.23

89033

20477.59

... More
Supply and fixing of flush Doors commercial quality conforming to I.S. 2202 Part I (1983) including fixing of wooden cleats and stoppers and including fixing and adjustment of hinges bolts locks handles springs fitting with necessary screws to be supplied departmentally.

4.5

1420

6390

... More
Fabrication and supply of M.S. grill as per approved design and drawing including the stair case railling etc. with square bars, m.s. angle iron, and m.s. flat iron as per direction of Engineer-incharge, supply of steel and its wastage, cutting, drilling holes and welding joints where necessary including each joint tube perfectaly welded and jointed and grinded to smooth finish. S.I.No 502(c)

0.16

5700

912

... More
Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes, fine steel/wood scrappers sand papering and knotting including cost of all materials, labour and T&P etc.

0.72

19

13.68

... More
Painting first coat over priming coat (but excluding cost of priming cost) on wood or steel and other metal surface with superior synthetic enameland finish and inclucoat after first coat on wood or steel surface with paint of (iii) Superior quality.S.I.No-2+4(III) Chapter 15 New Item

0.72

50

36

... More
Designing, fabricating, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building, for all heights and all levels etc. including:(ACP). DSR-, 2021/8.32

93.7

4474

419232.54

... More
Provding and laying Acrylic Sign Board

15.03

5918

88947.54

... More
Supply of Electrcal Work As per

2

75000

150000

... More
Total (Applicable G.S.T @18% Extra in All Item )

-

-

5638289.81



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.