Gorakhpur Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Gorakhpur Industrial Development Authority Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Oct 2022
Closing Date3 Nov 2022
Tender Amount₹ 2,32,41,033
Costs
EMD
₹ 13,62,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UGIDA_741967_1Bid Award Id
ViewTender No
3015/ABHI.NI.6/GIDA/2022-23 DT. 18.10.2022Tender Authority
Gorakhpur Industrial Development Authority ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
R.C.C.Work with cement approved coarse sand and 2cm gauge stone girt in the propotion of 1:1.5:3 (M-20) in raft foundation and Column Footing same with 24 B.W.G.G.I. banding wire and including necessary centering and shuttring etc.& also including supply of all materilas,labour and T&P etc. required for proper completion of work.As per S.I.No.287(Applicable G.S.T @12% and 1% Laber cess Extra )
2.7
-
7190
R.C.C. work with cement, approved coarse sand 2.0cm gauge approved stone ballast in the proportion of 1:1.5:3 in Collom and beam of doors and windows etc and bed plates, excluding the supply of reinforcement and its bending but including its bending the same with 24 BWG, GI bending wire and including wire as also including providing and fixing necessary centering and shuttering and its removal after completion of work & supply of all other materials labour and tools and plants etc. required for the proper completion of the work. as per SI No 288(Applicable G.S.T @12% and 1% Laber cess Extra )
1144.73
-
8960
R.C.C. Work with cement approved coarse sand and 20 mm gauge (nomianl size) dalla stone aggregate in the proporation of 1:1.5:3 M-20 in R.C.C. Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B W.G.G.I. binding wire and as required supply of all materials, labour centering and shuttering and removal of the same after completion of work. As per s.i.no. 289(Applicable G.S.T @12% and 1% Laber cess Extra )
7.63
-
9560
Mild steel or iorn work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all ratea) wrought to required shapes as necessary and bending for the proper coppletion of the work and including supply of steel and its wastage etc. and all labour and tools and plants required for proper completion of work Note: the steel shall be bent cold and bends hooks and authorised over lapping shall be measured. as per S.I. No 504(Applicable G.S.T @12% and 1% Laber cess Extra )
1007.56
-
4815
M 150 class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. requred for proper complition of the work. As per SOR 305(Applicable G.S.T @12% and 1% Laber cess Extra )
870.13
-
4555
12mm Thick plaster with cement mortar in proportion of 1:4 cement and coarse sand as per S.I. No 584a(Applicable G.S.T @12% and 1% Laber cess Extra )
11814.54
-
135
Finishing wall with water proof cement paint of approved make and quality on new work with two coats to give an even shade including the supply of all materials labour, tools & plants etc. required for proper completion of the work as per SI 660+661(Applicable G.S.T @12% and 1% Laber cess Extra )
12568.87
-
65
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. D.S.R. 13.80*0.865(Applicable G.S.T @12% and 1% Laber cess Extra )
78.72
-
99.6
Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm): SOR New Item 13.46.1 *.865(Applicable G.S.T @12% and 1% Laber cess Extra )
78.72
-
142.47
Mild steel or iron work in heavy sizes such as trusses, built up gates, record racks, roof work, gates etc. wrought to required form, including drilling holes riverting or welding where necessary & their fixing, required for proper completion of the work. As per s.i.no. 503(Applicable G.S.T @12% and 1% Laber cess Extra )
24
-
5150
Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes, fine steel/wood scrappers sand papering and knotting including cost of all materials, labour and T&P etc. required for proper completion of the work. S.I.No-1 Chapter 15 New Item(Applicable G.S.T @12% and 1% Laber cess Extra )
24
-
19
Painting Two coat over priming coat (but excluding cost of priming cost) on wood or steel and other metal surface with superior synthetic enamel standard make brusing to give an even shade and finish and including cleaning the surface of all dirt dust and other foreign matter and papering and stripping including cost of all material, labour, T&P etc. required for the proper completion of the work. but for every subsequent coat after first coat on wood or steel surface with paint of (iii) Superior quality.S.I.No-2+4(III) Chapter 15 New Item(Applicable G.S.T @12% and 1% Laber cess Extra )
24
-
50
Total
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements