If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Gorakhpur Industrial Development Authority Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date17 Aug 2024
Closing Date2 Sep 2024
Tender Amount₹ 3,25,19,696
Costs
EMD
₹ 18,26,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UGIDA_946837_1Bid Award Id
ViewTender No
2074/ABHI.NI.-6/GIDA/2024-25 DT. 06.08.2024Tender Authority
Gorakhpur Industrial Development Authority ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10
298.04
1429697
4797
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150kg per cum, optmum moisture content to be determine during trial length construction, concreete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller,
295.35
1760286
5960
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing As per MORTH Spec 602
590.7
5957800
10086
Drain Work
Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280)
114.56
682777
5960
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. R.C.C. Grade M20 compaction as per MoRTH specification clause No. Case II 12.08 complete in all respects.
704.11
6699606
9515
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504
552.73
3384918
6124
Construction of Box Culverts(3x6.0mter span)
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251
546.37
65564
120
Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280)
60.28
359268
5960
Brick masonary work in cement motar (in 1:3 cement and coarse sand) in foundation complete excluding pointing and plastering as per drawing and technical specification. (Morh clauses 1300))
130.53
661134
5065
Sand Filling in foundation trench as per drawing and technical specification SOR-255
24.95
21706
870
Providing Concrete for preinforced concrete M-20 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.
79.16
753207
9515
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.
87.45
871876
9970
Providing Concrete for preinforced concrete M-25 in open foundations complete as per drawing and technical specification. MoRTH Clauses 12.08 E Case II.
94.35
940669
9970
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504
307.29
1881843
6124
Providing & laying cement Concrete wearing coarse M-30 grade including reinforcement complete as per drawing and technical specification. Morth Clauses 13.05 G
7.43
92629
12467
Providing Weep holes in Brick masonary/plain/reinforced concrete abutment, wing wall return wall with 100 mm dia AC Pipe, extending through the full width of the structure with slope of 1V:20H towords drawing foce. Complete as per drawing and technical specification. MoRTH clauses 2706 & 2200
30
4590
153
Total (Applicable G.S.T @18% Extra in All Item )
-
32519695
-