Gorakhpur Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Gorakhpur Development Authority - GDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date10 Feb 2024
Closing Date20 Feb 2024
Tender Amount₹ 1,02,49,445 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
laying cc road slab prescribed thickness consisting 1:1.5:3 cement coarse sand & approved 2 cm gauge stone grit over prepared sub grade after its rectification & bringing it to proper camber and including supply of all materials, labour T & P etc. required for proper completion of work, finished to required templete as directed by E/I. (UPPWD SOR 2020/ 773a)

345

2898258

8400.75

... More
Supply,fixing and left on expansion joint as per required commericial ply of 6mm directed by E/IC (Approved Rate )

60

34800

580

... More
P/L of factory made 80mm thick rubber moulded interlocking Cement Concrete Tiles (30mpa) including 25mm thick compacted bed of fine compacted and proper embedding /laying of interlocking tiles leveliing and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc. required for proper completion of the work.SOR New Item 1

660

534600

810

... More
Drain Work

-

-

-

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 mtr etc completed (UPPWD SOR SI -251/2020)

607

72840

120

... More
Concrete with 4.00cm (1½") gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of materials, labour T&P etc. required for the proper completion of the work. (UPPWD SOR SI-281/2020)

82

445670

5435

... More
Providing and laying in position specialized grade of reinforced cement concrete excluding the cost of centering ,shuttering ,finishing and reinforcement all work upto plinth level (1:1.5:3 ) (1 Cement :1.5 coarse sand : 3 Graded Stone aggregate 20 mm nominal size (DSR 5.1.2)

255

1804698

7077.25

... More
Mild steel or iron work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all r ates) wrought to required shapes as necessary and bending for the proper completion of the work and including supply of steel and its wastage etc. and all labour and plants required for proper completion of work note: the steel shall be bent cold and all bends hooks and authorised over lapping shall be measured. (SOR No-504) Analysis Rate)

223

1699260

7620

... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (D.S.R. No-5.9.1)

2142

583695

272.5

... More
R.C.C. work with cement approved coarse sand and 2.0cm (3/4") gauge approved stone grit in the proportion of 1:1½:3 in slabs excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material, labour and T&P etc. required for proper completion of the work. binding wire cost being included in the item. (UPPWD SOR S.I.No-284A)

29

255200

8800

... More
S/F of PVC pipe 160mm KG pressure….(S.I.No-Mat/30)

35.88

17760

495



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.