Gorakhpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Gorakhpur Development Authority - GDA Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 1,72,50,765
Costs
EMD
₹ 8,62,600Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GORDA_967492_3Bid Award Id
ViewTender No
15/GDA/2023-24/15102024Tender Authority
Gorakhpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
S/F of A.B.C. conductor for L.T. line on S.T. pole complete with tensioning binding etc. for proper completion of work. (3x120+1x90+1x16mmsqm GTP/Drawing Approved by UPPCL & Directed by E/I.
3000
-
-
S/F of pearcing connector complete in all respect. As per UPPCL specification.
200
-
-
S/F of dead end clamp complete in all respect. As per UPPCL specification.
10
-
-
S/F of Suspension clamp complete with Eye hook (insulated) inludes holding clamp in all respect. As per UPPCL specification.
60
-
-
S/F of Three Phase Distribution box with clamp including pearsing connector & connection wire.
50
-
-
Supply and erection of stay set at 3.5 Metres away from the pole complete with galvanised 19mmdiax1.8meter long stay rod, 30cmx30x6.3mm anchor plate, thimble stay clamps, stay insulator, 19mm 600mm double screw tightener, 7/3.5mm G.I. stay wire etc. in 1:3:6 cement concrete complete in all respects.
28
-
-
Earthing of O/H/ line pole with 2.5 mt. long 20 mm dia G.I. rod including the cost of 7/16 S.W.G. G.I. earth wire labour & T&P etc. required for proper completion of work as per dorection of E/I.
30
-
-
S/Painting of pole with 2 coat of "Al" paint over one coat of red oxide including cleaning of dust vermin & making good complete in all respect. As per direction of E/I.
65
-
-
Supply and burring of Safe Earthing Electrode T-19, (Hot Dip Galvanized), Length up to 3000mm, outer Dia 50mm inner Dia 25mm, terminal Dia 12mm, outer Gi Pipe of 16 swg and inner Gi Pipe 12 swg with Hot Dip Galvanization up to 100 micron filled with crystalline conductive mixture (CCM having anti corrosive & conductive property eith 50 Kgs activated soil (BFC) capable of reducing the soil resistivity with good mixture of retaining capacity and one earthing lead of 25mm x 3mm G.I strip, upto switch board (from apron to switch board, the cost of G.I.strip will be extra) along with 30 cm square C.I. frame with hinged cover & masonry housong. Make: As Approved in U.P. P.W.D., & C.P.R.I Certified.
15
-
-
S/F of cable root marker CC make complete in all respect as per direction E/I.
35
-
-
S/F of 6 inch dia GI pipe complete in all respect as per direction of E/I.
96
-
-
Dismentling of rail / S.T. pole including removing of channel disc insulator, pin insulator,light etc complete in all respect as per direction of E/I.
60
-
-
Cartage of old materials from site to uppcl store including loading /unloading. PSR
1
-
-
Supply Laying of HDPE pipe 110 mm dia with albow soceket. Horizontal drilling method in all complete ete.
3000
-
-
S/F of outdoor type cable end termination jointing kit suitable for XLPE cable etc all complete. 240 sq mm. (outdoor)(Raychem/Denson/Birla) GTP/Drawing Approved by UPPCL & Directed by E/I.
36
-
-
S/F of SP-55 S.T. 11.0 mtr long pole grouted with 1:3:6 C.C. including excavation and back filling, making plinth 30cm above GL etc. complete with all labour, material, T&P etc as per direction of GTP/Drawing Approved by UPPCL & Directed by E/I.
20
-
-
Supply and fixing steel tublar pole 9 meter long designated 410 SP-32 in 1:3:6 cement concrete foundation including excavation back filling etc. complete in all respect.
45
-
-
Supply, storing, inspection, handling, assembling, installing in correct aligned position effecting proper connections, testing & commissioning of Outdoor mounted type 11KV/433V ,100KVA Transfomer (as per IS : 1180 Type-2), 3 phase, 5% impedance at 75 degree C, Dyn 11 vector group, 50 cycles, (ONAN) oil immersed naturally cooled, step down, double Alluminium wound, continuous duty, temperature rise 50/55 degree C and other standard accessories as required including followings. (i) 100 KVA (MEI /ABC/Mahindera/ GTP/Drawing Approved by UPPCL & Directed by E/I.
1
-
-
Supply and laying by HDD system of 3 core/1 core standered aluminium conductor XLPE (Cross linked polyethylene) insulated PVC bedded, Galvanised flat steel strip armoured cables confirming to I.S. 7098 240 sq. mm 3 core. (Heavels/KEI/Polycab GTP/Drawing Approved by UPPCL & Directed by E/I.
3500
-
-
Dismentling & Refixing of transformer distribution pillar including cartage/ loading/unloading complete in all respect.
6
-
-
Dismentling of ACSR condutor complete in all respect.
1400
-
-
Dismentling of doble pole Structure ST pole.
8
-
-
Evaluation Notes How It Works ?