Ghaziabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Ghaziabad Development Authority - GDA Tender

Works
Eprocure
Opening Date10 Jul 2018
Closing Date26 Jul 2018
Tender Amount₹ 12,95,51,535 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Development of Industrial Pocket at NH- 58 Madhuban Bapudham Scheme
Development of Industrial Pocket at NH- 58 Madhuban Bapudham Scheme
Development of Industrial Pocket at NH- 58 Madhuban Bapudham Scheme
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401, MORT&H - 401. (Without motor grader)

5925

-

3278

... More
Providing & laying spreading and compacting graded stone aggregate to wet mix macadam(WMM) specification including premixing the material with at OMC in mechanical mix plant close grade, mixing in metrial mix plant at OMC carriage of mixed material by tipper to site laying in uniform layer with paver in sub-base/base coarse on well prepared surface and compacting with vibratory roller to achieve the desired density, 406 MORT&H specification and as per directon of engineer incharge (AR) (9mtr & below road without paver finisher).

6418

-

3583

... More
Providing and applying tack Coat 80/100 (VG10) bitumen using emulsion pressure distributor at the of 1.00 kg. per sqm on the prepared bituminous/granular surface cleaned with mechanical broom including supply of all materials, labour T&P etc. required for proper completion of the work as per clause 503 MoRT&H specification as per direction of Engineer incharge. (A.R)

28545

-

33.5

... More
Providing and applying tack coat with 80/100 (vG10) bitumen on prepared surface of bitumenous / granular base including cleaning the road surface and spraying primer at the rate of 0.30 Kg/sqm using mechanical means including supply of all materials, labour, T&P etc. required for proper comletion of the work as per clause 503 of MORT&H specification and as per direction of the Engineer -in- charge (A.R. )

57090

-

11.3

... More
Providing and laying 75mm th. compacted bitmenous mecadam on prepared surface with 100-120 tonnes per hour batch type hot mix plant producing an average out-put of 75 MT per hour using crushed agregated of specified grading-II (91mm Nominal size) premixed with 80/100 (VG 10) bitmenous binder @ 3.30 % by weight of total mix and transporting the hot mix material to work site, laying with a hydrostatic pawer finisher with sensor control to the required grade, level and laignment rolling with smooth wheeled vibratory (8-10 tonnes) roller for intial brake down rolling, finish rolling by smooth wheeled tondom roller (8-10 tonn to achieve the desired compaction, includeing supply of all material, lab T& P etc. requeried for proper completion of the work as per clause 504 of MoRT&H Spacfication and as per direction of the Engineer Incharge (A.R.)

2141

-

7005

... More
Providing and laying bitmenous concrete with 100-120 tonnes per hour batch type hot mix plant producing an average out-put of 75 MT per hour using crushed agregated of specified grading-II premixed with 60/70 (VG 30) bitmenous binder @ 5 % by weight of total mix and filier @ 2% by weight total mix, transporting the hot mix material to work site, laying with a hydrostatic pawer finisher with sensor control to the required grade, level and laignment rolling with smooth wheeled vibratory (8-10 tonnes) roller for intial brake down rolling, finish rolling by smooth wheeled tondom roller (8-10 tonn to achieve the desired compaction, includeing supply of all material, lab T& P etc. requeried for proper completion of the work as per clause 509 Grade-II(13mm nominal size) of MoRT&H Spacfication and as per direction of the Engineer Incharge (A.R.)

1142

-

8818

... More
Earthwork in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.SI-251.a

90

-

95

... More
Concrete with 4cm guage brick ballast fine sand of 1.25 FM and cement in proportion of 10:5:1 in foundation and under floor including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.274

50

-

3050

... More
M-150 brick work in one cement & four coarse sand 2.2 FM (1:4)mortar in foundation and plinth including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.305 a

165.5

-

4450

... More
Concrete with 2cm guage stone ballast coarse sand of 2.20 FM and cement in proportion of 4:2:1 including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.279a

12

-

6250

... More
12mm thick plaster with cement and corse sand of 2.2 F.M. in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.SI 584 New item

460

-

165

... More
Engraving lines in plaster of outer face wall vertically and horizontally to display the surface as stone facing as directed by the E/I including supply of all mrials, labour and T & P etc. required for proper completion of the work.SI 598

460

-

4.5

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature,jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).

836

-

475

... More
Supply and laying of 80 mm. thick I shaped mechanically compressed cement grey / ordinary red interlocking cement concrete paver blocks manufactured by high pressure and control vibration machine having plan dimension 200 x (160+120mm ) with minimum 5mm. thick topping of O.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less then 30 Mpa (M-30) including cost of material, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-Charge. (i) Cement grey

10158

-

640.5

... More
Supply, fixing & eraction of built up cantilever structuer 6m span comprising of one vertical posts of 6.00 m height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm MS plate at top & 12 mm M.S. Pipe and 40 mm dia heavy ms pipe as bracing & 50 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthtic enamel plant. The work included construction of RCC foundation of size 90x90m of required depth as per site condition for built up structure including earth work in excavation 100 mm thick lean concrete in 1:4:8 cement coarse sand and 20 mm stone grit including supply and fixing of 25mm dia foundation bolts 600mm long as per provision of structure design including cost of reinforcement & shuttering the lateral vertical clearances and complete. Installation work shall be as per relevant clauses of MORT&H specification section 800 and IRC 67 2010 complete in all respect the rates shall include cost of design fabrication supply, transportation, Local shifting Erection of Signage structure using crane, inclusive of all taxes royalty, VAT etc. all T&P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge. (sanction rate)

1

-

125000

... More
Providing and fixing of high intensing perfective sign Board made of 2mm thick aluminium sheet face to be fully covered with micro prismatic retro retro reflactive sheeting only duly framed with 1" M.S. square pipe and right intensity reflective sheeting base of required shade and on one side duly painted with black and white synthtic enamal paint with required size of pass complete in all respect. As per DSR 16.16/2016, @ 4722.20-4% High intensity reflective signboard Bothside. DSR 2016,

7

-

4540.57

... More
Earthwork in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.SI-251.a

2649

-

95

... More
Concrete with 4cm guage brick ballast fine sand of 1.25 FM and cement in proportion of 8:4:1 in foundation and under floor including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.275

644

-

3200

... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete 5.9.1 DSR

2880

-

171.1

... More
Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. 5.9.2 DSR

21656

-

284.8

... More
Suspended floors, roofs, landings, balconies and access platform 5.9.3 DSR

256.5

-

347.6

... More
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportionsas per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer -in - charge. 5.37.1 All works upto plinth level

1848

-

6351.8

... More
M.S (tor steel or plain) in works such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.SI 504

1847

-

5600

... More
Water Supply:-Providing & fixing of ISI marked HDPE (PE-100) pipes (6 kg/cm2) conforming to IS 4984, in trenches and making joints with bell cupler and solvent cement, including cost of special required fpr proper completion of works, including all taxes, labours, tools, night gaurds, light, barrier, red light to safegaurd against, all complete as per specification and direction of Engineer-in-charge. 110mm dia HDPE (PE 100)

2598

-

244.8

... More
160mm dia HDPE (PE 100)

808

-

504.3

... More
Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts,rubber insertions etc. (the tail pieces if required will be paid separately 100 mm diameter 18.59.3 DSR 2016 @7410.80-4% (A.V)

6

-

7125.76

... More
150 mm diameter 18.31.3 DSR 2016 (F.H) class-II @5387.20-4%

10

-

5179.99

... More
Constructing masonry Chamber 60x60x75 cm inside, in brick work incement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I.surface box 100mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 18.33.1 DSR 2016 @6849.60-4%

3

-

6586.15

... More
Constructing masonry Chamber 90x90x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : 18.34.1/2016 With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 @11842.16-4%

11

-

11387.25

... More
Supply and fixing of 1/2 Inch dia G.I. Pipe

294

-

104

... More
Sewer Work:-Excavation for depth upto 1.50m B.G.L for laying sewer line, manhole, gully traps etc. in ordinary soil (loam & clay) i/c cutting of joints pits,traiming,dressing. Leveling & refilling of trenches in 20cm layers, watering sand ramming the same i/c removal of surplus earth or other diamentel materials upto a distance of 50m from the center of trench.

2547

-

131

... More
Excavation for depth 1.50m to 3.0 m from B.G.L for laying sewer line, manhole, gully traps etc. in ordinary soil (loam & clay) i/c cutting of joints pits,traiming,dressing. Leveling & refilling of trenches in 20cm layers, watering sand ramming the same i/c removal of surplus earth or other diamentel materials upto a distance of 50m from the center of trench.

62

-

185

... More
Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered): Depth not exceeding 1.5 m sqm 55.80 2.20.1 DSR 2.20.2

905

-

55.55

... More
Depth exceeding 1.5 m but not exceeding 3 m sqm 59.55

552

-

59.55

... More
Concrete with 4cm guage brick ballast fine sand of 1.25 FM and cement in proportion of 12:6:1 in foundation and under floor including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.273

266

-

2900

... More
Concrete with 2cm guage stone ballast coarse sand of 2.20 FM and cement in proportion of 4:2:1 including supply of all materials , labour , T&P etc. required for proper completion of the work in Craddle.S.I.279 a

171

-

6250

... More
Supply, Carting and jointing R.C.C. NP-3 & Special from store to site of works, lowering the same in trenches in depth BGL. True to alignment Cauking the joints with 1:2 cement & coarse sand mortar i/c excavation of earth below invert level of pipe, cost of all jointing materials, testing etc complete as per specification and direction of Engineer-in-charge. 300 mm dia RCC Pipe 0.00 to 1.5.0m below ground level @599.50+190+140=929.50

2532

-

929.5

... More
400 mm dia RCC Pipe 0.00 to 1.5.0m below ground level 1435.50+190+140=1765.50

730

-

1765.5

... More
Constuction of RCC circular manhole 1.200m internal dia at bottom and 0.56m dia at top in 1:1.5:3 (1 cement :5 coarse sand :3 stone aggregate 20mm nominal size) inside cement plaster 6mm thick 1:3 (1cement :3 fine sand) with foundation concrete 1:2:4 (1 cement :2 coarse sand :4 stone aggregate 20mm nominal size) over 1:4:8 base concrete (1 cement : 4 coarse sand : 8 stone aggregate 40 mm nominal size) and making necessary channel in cement concrete 1:2:4 ( 1 cement :2 coarse sand :4 stone aggregate 20mm nominal size) finished with float coat of neat cement all complete as per standard design of GDA. Including all for completing in all respect upto 1.50 mtr depth 1200mm internal dia

96

-

21686

... More
extra depth for circular manhole 1.2m internal dia (at bottom) with beyond 1.65m to 2.3m

66.5

-

3537

... More
PARK:-Earthwork in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.SI-251.a

99

-

95

... More
Concrete with 4cm guage brick ballast fine sand of 1.25 FM and cement in proportion of 10:5:1 in foundation and under floor including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.274

36

-

3050

... More
M-150 brick work in one cement & four coarse sand 2.2 FM (1:4)mortar in foundation and plinth including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.305a

126

-

4450

... More
12mm thick plaster with cement and coarse sand of 1.25 F.M. in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.SI 584 New item

593

-

150

... More
same as above S.I. No 305a but in super structure S.I. No-305a+309+310 in one brick wall

82

-

4990

... More
2.5 cm thick DPC with one part cement 1.5 part of approved coarse sand and three part approved grit of 10mm( 1:1.5:3 ) with and including water proofing as ordered by the E/I in the proportion as specified by the manufactured including supply of all materials , labour , T&P etc. required for proper completion of the work and including proper curing & shuttering as necessary.S.I.361

91

-

300

... More
One priming coat and one coat of dry distemper on new work including supply of all materials, labour and T & P etc. required for proper completion of the work.SI 681

593

-

35



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.