Ghaziabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Ghaziabad Development Authority - GDA Tender

Works
Other Consultancy Services
Consultancy Services
Coronavirus COVID 19
Eprocure
Opening Date6 Feb 2019
Closing Date4 Mar 2019
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
REQUEST FOR PROPOSAL FOR SELECTION OF IMPLEMENTATION AGENCY FOR INTEGRATED TRAFFIC MANAGEMENT SYSTEM (ITMS) IN GHAZIBAD CITY
REQUEST FOR PROPOSAL FOR SELECTION OF IMPLEMENTATION AGENCY FOR INTEGRATED TRAFFIC MANAGEMENT SYSTEM (ITMS) IN GHAZIBAD CITY
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Galvanized Cantilever poles

328

-

-

... More
Galvanized Standard Poles

328

-

-

... More
300 mm diameter polycarbonate signal heads including aspect with LED based capsule, visor bracket frameworks, Supports, flexible wires, Wires glands and pipes etc (Actual quantity to be arrived at, for the solution (please specify)Rate Queted by one job for all project

1

-

-

... More
Traffic Light Aspects – Red

867

-

-

... More
Traffic Light Aspects - Green Arrow

2250

-

-

... More
Traffic Light Aspects - Amber

867

-

-

... More
Pedestrian lamp heads – Stop Man

578

-

-

... More
Pedestrian lamp heads – WalkMan

578

-

-

... More
Traffic simulation modelling and analysis software (offline)

1

-

-

... More
Junction Box/Cabinets

100

-

-

... More
Complete cabling and civil works as required including but not limited to: 50/90 mm HDPE Pipe at road crossing, island, median etc.; 90/120mm DWC pipe, 14/7 core 1.5SqmmArmoured cable; 3 Core, 2.5 SqmmArmoured Cable; jointing,compacting, backfilling terminating, trenching,

1

-

-

... More
Removing of existing poles, pole Foundations, Aspects, Damaged Cables, Existing Controller& Shifting to the location as per guideline of Authority/GDA

32

-

-

... More
UPS with Battery

1

-

-

... More
(Part-B :Traffic Surveillance System) Outdoor Box Cameras System with Complete mounting accessories as required

112

-

-

... More
PTZ Cameras System with Complete mounting accessories as required

110

-

-

... More
Emergency Call Box with complete hardware and accessories as required

10

-

-

... More
Poles/gantry for Cameras and Equipment’s (Actual quantity to be arrived at, for the solution (please specify)Rate Queted by one job for all project

1

-

-

... More
Edge level Industrial Switches for junctions

150

-

-

... More
Networking Cost (Passive Components including Patch Panel, LIU, OFC, Cat6 Cable, Power Cable, Patch Cords, Pipes, Installation & Labour Charges, etc.) (Actual quantity to be arrived at, for the solution (please specify) Rate Queted by one job for all project

1

-

-

... More
(Part-C : Traffic Enforcement System Red Light Violation Detection (RLVD) System) RLVD system including Evidence, ANPR cameras and IR illuminator with associated items

15

-

-

... More
Traffic Violation Cameras with ANPR capability for Wrong Way Movement violations with complete hardware, accessories mounting infrastructure as required (Actual quantity to be arrived at, for the solution lanes (please specify) Rate Queted by one job for all project

1

-

-

... More
Speed Detection System for covering 3 lanes in one direction (Actual quantity to be arrived at, for the solution locations (please specify) Rate Queted by one job for all project

1

-

-

... More
item No. 25A - Speed detection sofwtare

18

-

-

... More
item No.25B - ANPR cameras With IR Illuminator

18

-

-

... More
item No. 25C - Evidance camera for Speed evidance

6

-

-

... More
item No. 25D - LPU

15

-

-

... More
item No. 25E - cabling, accessories & mounting infrastructure as required.

15

-

-

... More
No Helmet detetction systems

10

-

-

... More
Triple rididng for two wheeler Systems

10

-

-

... More
E-Challan Hand held devices with E-Challan s/w for Handheld

80

-

-

... More
item No.33A - SIM cards

1

-

-

... More
UPS with Battery at Junction(appropriate Backup as per technical specification and SLA) (Actual quantity to be arrived at, for the solution locations (please specify) Rate Queted by one job for all project

1

-

-

... More
Junction connectivity to control room

1

-

-

... More
Public Address System with complete hardware and accessories as required

82

-

-

... More
(Part-D : Traffic Command Center) Laser Video Wall Cube- 70” in 2X8 matrix

1

-

-

... More
Video Wall System Controller

1

-

-

... More
Monitoring Workstations with 1 Monitors for Traffic Command and control Center

10

-

-

... More
Networking/IT Racks / switches / router and Passive components including Cabling and other accessories as required for Traffic Command and control Center

1

-

-

... More
Control Center infrastructure to provide secure and efficient environment including Access Control System Furniture fixtures, Fire Safety System and AC for approx. 3000 sqft area, including false ceiling, False floor, Fire alarms system

1

-

-

... More
Dome camera

10

-

-

... More
NVR for Control room with 16 channels with 2 TB Hard disk

1

-

-

... More
UPS at Traffic Command and control Center in High availability

1

-

-

... More
Server and Operating systems for(including but not limited to): Traffic Control System, Public Address (PA) System, Traffic Surveillance Cameras-Management ANPR, RLVD, Speed Detection, No Helmet and Triple Riding Database, e-Challan System, PAS & ECB SystemTraffic Command and Control Center

10

-

-

... More
Failover Server for every ITMS & Surveillance System module in N+1 mode

2

-

-

... More
Database

1

-

-

... More
Antivirus Server

15

-

-

... More
Traffic control System software application

1

-

-

... More
GIS/ e MAP Integration

1

-

-

... More
Enterprise Management System (including SLA Mngt, Help-Desk Mngt, Network Mngt, BMS) (Pl give the break-up if different s/w required)

1

-

-

... More
Customized GUI- Dashboard for Authority/GDA and Home Department (for various levels) with all required integrations as per SOW defined

1

-

-

... More
Speed Detection System (Software + License)

1

-

-

... More
ANPR (Software + License)

1

-

-

... More
RLVD(Software+ License)

1

-

-

... More
No helmet detection Software (Software+ License)

1

-

-

... More
Triple Riders Detection software (Software+ License)

1

-

-

... More
E-Challan System Software

1

-

-

... More
Video management Software

1

-

-

... More
ECB Software

1

-

-

... More
PA System Software

1

-

-

... More
Traffic Command and Control Center Software

1

-

-

... More
ITMS Integration application i.e. sharing data with Integrated Command and Control Center (ICCC) and etc as per RFP

1

-

-

... More
Any other server side Software required to cater Functional, Technical and SLA requirement specified in this RFP

1

-

-

... More
Storage Solution (Actual quantity to be arrived at, for the solution TB (please specify) Rate Queted by one job for all project

1

-

-

... More
Backup Storage software (Actual quantity to be arrived at, for the solution Lot (please specify) Rate Queted by one job for all project

1

-

-

... More
L3 Switches

2

-

-

... More
Firewall in High availability (Actual quantity to be arrived at, for the solution Lot (please specify) Rate Queted by one job for all project

1

-

-

... More
Intrusion Prevention System (Actual quantity to be arrived at, for the solution Lot (please specify) Rate Queted by one job for all project

1

-

-

... More
Lease line Network Bandwidth (Actual quantity to be arrived at, for the solution Lot (please specify) Rate Queted by one job for all project

1

-

-

... More
Internet bandwidth 18 Mbps all proposed locations

1

-

-

... More
Capacity Building

1

-

-

... More
DR cloud

1

-

-

... More
Network connectivity for DR cloud

1

-

-

... More
DC - DR network connectivity

1

-

-

... More
If any other items not specified in RFP required for ITMS project, including improvement of junctions for ITMS.

1

-

-

... More
The ITMS System Integrator shall provide connectivity with adequate bandwidth for various components/locations. The minimum bandwidth foreach component/location shall be as below: ITMS Solution/Module Min. Requirement 1. Junctions 18 Mbps 2. ICCC/ ITMSControlRoom 256 Mbps Service provider should be BSNL, Airtel & suitable for all location network availability of other companies.

1

-

-

... More
BOQ for OPEX Components Technical & Operational Manpower (Man year rate As per the project plan proposed by bidder) 1st Year

1

-

-

... More
item No.79A - 2nd year

1

-

-

... More
item No.79B- 3rd year

1

-

-

... More
item No.79C- 4th year

1

-

-

... More
item No.79D- 5th year

1

-

-

... More
Network Connectivity required for the project (LS ) 1st Year

1

-

-

... More
item No.84A - 2nd year

1

-

-

... More
item No.84B - 3rd year

1

-

-

... More
item No.84C - 4th year

1

-

-

... More
item No.84D - 5th year

1

-

-

... More
DR Cloud Recurring charges (LS ) 1st Year

1

-

-

... More
item No.89A - 2nd year

1

-

-

... More
item No.89B - 3rd year

1

-

-

... More
item No.89C - 4th year

1

-

-

... More
item No.89D - 5th year

1

-

-

... More
ICT Components (Inclusive of Comprehensive and preventive maintenance as per the required of successful operations of the project) 1st year

1

-

-

... More
item No.94A - 2nd year

1

-

-

... More
item No.94B - 3rd year

1

-

-

... More
item No.94C - 4th year

1

-

-

... More
item No.94D - 5th year

1

-

-

... More
Non – ICT Components (Inclusive of Comprehensive and preventive maintenance as per the required of successful operations of the project) 1st year

1

-

-

... More
item No.99A - 2nd year

1

-

-

... More
item No.99B - 3rd year

1

-

-

... More
item No.99C - 4th year

1

-

-

... More
item No.99D - 5th year

1

-

-

... More
Charges for 1 lakh challan per year for E-Challan Printing, Processing, Sorting, making Entry and insertion in the Envelope for Dispatch (1 lack challan per year /However Charges will be pay on acctual consumption ) 1st Year

1

-

-

... More
item No.104A - 2nd year

1

-

-

... More
item No.104B - 3rd year

1

-

-

... More
item No.104C - 4th year

1

-

-

... More
item No.104D - 5th year

1

-

-

... More
Charges for 1 lakh challan per yearE-Challan Delivery Charges by Hand/Post/ Courier (Per E-Challan) (1 lack challan per year /However Charges will be pay on acctual consumption ) 1st year

1

-

-

... More
item No.109A - 2nd year

1

-

-

... More
item No.109B - 3rd year

1

-

-

... More
item No.109C - 4th year

1

-

-

... More
item No.109D - 5th year

1

-

-

... More
Any other Item to complete this project 1st year

1

-

-

... More
item No.114A - 2nd year

1

-

-

... More
item No.114B - 3rd year

1

-

-

... More
item No.114C - 4th year

1

-

-

... More
item No.114D - 5th year

1

-

-

... More
Note1: All Components shall include 5 Years comprehensive onsite warranty Note2: All Price / Rate should be exclusive of applicable GST/Taxes Note3: The quantities given above are for the purpose of evaluation of price proposals only. GDA may change the quantities of any components at the time of signing of the Contract or any time during the ContractPeriod

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.