Ghaziabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Ghaziabad Development Authority - GDA Tender

Works
Eprocure
Opening Date29 Jan 2019
Closing Date11 Feb 2019
Tender Amount₹ 4,22,20,323 
Notes
Download

Costs

Summary

Construction Of Approach Road .

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of Approach Road from NH-9 to Kudaghar at Galand on Patri of Gang Nahar
Construction of Approach Road from NH-9 to Kudaghar at Galand on Patri of Gang Nahar
Construction of Approach Road from NH-9 to Kudaghar at Galand on Patri of Gang Nahar
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded material, (Grade-1) spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Morth clause 401 (with out motor grader)

3690

12095820

3278

... More
Providing & laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant ckose grade mixing in mechanical mic plant at OMC, carriage of mixed Material by tipper to site, laying in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, 406 of Morht specification as per direction of E/I without Paver finisher.

2910

10426530

3583

... More
Providing and applying Tack coat with bitumen 80/100 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Including supply of all material labour T&P etc required for proper completion of woth as per clause 503 of Morth specification & as per direction of E/I.

14150

294320

20.8

... More
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with 60/70 (VG-30) bituminous binder @ 4.25 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 (Grade -II) "19.00mm nominal size of Morth Specification as per E/I.

1065

8630760

8104

... More
Providing and applying Tack coat with bitumen 80/100 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.30 kg/sqm using mechanical means. Including supply of all material labour T&P etc required for proper completion of woth as per clause 503 of Morth specification & as per direction of E/I.

14150

159895

11.3

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with 60/70 (VG-30) bituminous binder @ 5.00 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per complete in all respects, MORTH specification clause No. 509 Grarde-II "13.00 mm nominal size" of Morth specification as per direction of E/I.

570

5026260

8818

... More
Brick on edge pavement with straight over burnt bricks on paries with brick laid dry joints filled with local sand including preperation of sub grade to prescribed camber and including supply of bricks , filling joints with local earth of P.I. 5 to 7 spreading blinding coat 1 cm depth of local earth over the entire surface and including supply of all labour T & P etc. required for proper completion of the work. SI- 763

1300

448500

345

... More
Earthwork in Foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches.SI-251.a

355

33725

95

... More
Concrete with 4cm guage stone ballast coarse sand of 2.20 FM and cement in proportion of 8:4:1 including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.279

120

624000

5200

... More
M-150 brick work in one cement & coarse sand (1:4)mortar in foundation and plinth including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.303

550

2447500

4450

... More
Concrete with 2cm guage stone ballast coarse sand of 2.20 FM and cement in proportion of 4:2:1 including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.279

35

218750

6250

... More
12mm thick plaster with cement and coarse sand of 2.20 F.M. in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.SI 582

3335

550275

165

... More
Painting or Varnishing work in small area on new wood or iron work with two coat (upto one square meter) of approved superior quality ready mixed paint or varnishing including supply of all materials, labour and T & P etc. required for proper completion of the work.SI 642

2060

103000

50

... More
Providing wall putty on new surface with approved quality material of Berger ,J.K./Birla or Shalimar make two coats. New item

2060

123600

60



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.