Ghaziabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Ghaziabad Development Authority - GDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Dec 2023
Closing Date16 Jan 2024
Tender Amount₹ 7,17,40,310
Costs
EMD
₹ 1,43,500Document Cost
₹ 15,930Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_GDAUP_870366_1Bid Award Id
ViewTender No
616/4/PA-T/2023-24 Dt. 08.12.2023 (S.no-7)Tender Authority
Ghaziabad Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of 30.00 mt wide zonal road from (Bhatta no-5 to Aggarwal Heights) including drainage and sewrage system in Rajnagar Extention.
Construction of 30.00 mt wide zonal road from (Bhatta no-5 to Aggarwal Heights) including drainage and sewrage system in Rajnagar Extention.
Construction of 30.00 mt wide zonal road from (Bhatta no-5 to Aggarwal Heights) including drainage and sewrage system in Rajnagar Extention.
BOQ Items
Providing, laying spreading and compaction wet mix macadam (W.M.M) specifications including premixing the material with water at OMC in mechanical mix plant, carriage of mixed materials by tipper to site laying in uniform layers with paver in sub-base /base cours on well preparsd surface and compacting with vibratory roller to achieve the desired density as per MORTH specification clause 406 Complete in all respects. (A.R)
2661.35
10560236
3968
Providing and applying Primer Coat with bitumen 80/100 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per MoRTH specification clause No. 502 complete in all respects. (A.R)
10750.8
373052
34.7
Providing and applying tack Coat 0.30 kg/sqm with bitumen 80/100 using emulsion pressure on the prepared bituminous/granular surface cleaned with mechanical broom as per MoRTH specification clause No. 503 complete in all respects. (A.R)
21501.6
404230
18.8
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness compressed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared bade, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. (A.R.)
10750.8
1859888
173
Providing and laying seal coat sealing the voids in a bitumeneous surfas laid to the specified level grade and cross fall using type B seal coats as per clause 513 of MoRTH sepcifications and as per direction of the Engineer-in-charge (A.R.)
10750.8
640747
59.6
Brick edging on both side of the road of M-150 bricks 7 cm. wide, 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Egineer-in-charge. (As per U.P.P.W.D.S.O.R.- SL. No. 765)/22
1240
111600
90
Drain Excavation in foundation in ordinary soil (loam clay or sand) including Lift up to 1.5 meter (5ft.) and lead up to 30m (100 ft.) and including filling, watering and raming of excavated earth into the trenches or into the space between the bulding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m (100 ft) from the foundation trenches UPPWD SOR 2022/251(a) I - 0.0-1.5 m BGL
5772
634920
110
II - same as item no- 10 1.50-3.0 m BGL
2135.5
298970
140
Cement Concrete 4cm. gauge approved stone ballast coarse sand and cement in proportion 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work (SI. No. 281/2022).
314.25
1916925
6100
RCC work with cement approved coarse sand and 2 cm (3/4) guage approved stone ballast in the proportions of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W. G.G.I binding wire and including neccessary centering and shuttering etc. and also including supply of all materials. labour and T & P etc. required for proper completion of the work excluding cost of binding wire. sor 2022
I- In RCC Raft foundation or drain SOR 2022 ITEM NO- 287 A
549.46
4549528
8280
same as item no- 13 II - In RCC wall SOR 2022/ ITEM NO- 289
1189.45
11073779
9310
same as item no- 13 III - IN RCC SLAB SOR 2022/ITEM NO -289
80.5
726915
9030
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and including cost of binding wire. (S.I. No. 504/SOR/22)
1785.3
13746810
7700
Cement Concrete 2cm. gauge approved stone ballast coarse sand and cement in proportion 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work (SI. No. 279A/2022).
39.15
276007
7050
Construction of weep holes with 110 mm dia (OD) RPVC pipe (IS : 4985) (6 kg/sqcm) in the RCC wall at an interval of 1.50 m horizontally & vrtically at the time of casting of wall with all materials labours etc required ofr proper completion of the work. sanctioned rate to file of Talab khasra no-1174
597.6
62449
104.5
SEWER
Excavation for laying sewer, manholes gully, pits, chambers, sumps etc. in ordinary soil (earth sand, loam & clay) including cutting of joints pits trimmimg dressing leveling refilling of trenches in 20 cm layers watering sand ramming the same including removal of surplus earth of other dismantled upto a distance of 50.00 m from the centre of trenches (A.R)
I - 0.00 -1.50MBGL
3930
966780
246
same as item no-19 II- 1.50-3.0 m BGL
2947.5
913725
310
same as item no-19 III - 3.0-4.5 M BGL
560
217840
389
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered). DSR 2.16/2022
1.5-3.0
2250
281520
125.12
S/C/L/Jointing RCC hume pipe of following depth and dia A.R. 300 MM DIA NP-3 1.5 TO 3.00
560
988400
1765
same as item no-23 450 MM DIA NP-3
3.0-4.50 M BGL
750
2385000
3180
Cement Concrete 4cm. gauge approved stone ballast coarse sand and cement in proportion 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work (SI. No. 281/2022).
168
1024800
6100
Constructing brick masonry circular manhole 1.52 m internal dia at bottom and 0.56 m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand) inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement, foundation concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design : 19.13.1 2.30 m deep with SFRC Cover and frame (heavy duty HD- 20 grade designation) 560 mm internal diameter conforming to I.S. 12592, total weight of cover and frame to be not less than 182 kg. fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12 mm thick cement plaster at the external surface shall be paid for separately) With Sewer bricks conforming IS : 4885 19.13.1.2/DSR 2021
44
1809184
41117.82
Extra depth for circular type manhole 1.52 m internal dia (at bottom) beyond 2.30 m With Sewer bricks conforming IS : 4885 19.14.2/ DSR 2021
44
-760879
17292.72
DIVIDER
Excavation in foundation in ordinary soil (loam clay or sand) including Lift up to 1.5 meter (5ft.) and lead up to 30m (100 ft.) and including filling, watering and raming of excavated earth into the trenches or into the space between the bulding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m (100 ft) from the foundation trenches UPPWD SOR 2022/251(a)
189
20790
110
Cement Concrete 4cm. gauge approved stone ballast coarse sand and cement in proportion 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the work (SI. No. 281/2022).
47.25
288225
6100
M-150 Brick Work in one 1:4 one cement & Coarse sand foundation and plinth including supply of all matarials labour, Tools & plants etc. requierd for proper completion of the work as per direction of Engineer-in-charge SI no. 305 (a)/2022
233
1204610
5170
Providing and fixing semi barrier type Kerb Stone (machine made) of with & m-20 grade concrete, size of Kerb Stone will be 0.4 x 0.3 x 0.13 cm and including outer surface finished with 1 : 3 cement and coarse sand, including supply of all materials labour T & P etc. required per peroer completion of work.(A.R.) sanctioned rate
1400
737800
527
12mm thick plaster with cement and coarse sand of 2.20 F.M. in 1:3 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work. SI 583/2022
700
147000
210
Painting two coat with priming coat on large area british paint Requirement indcluding supply of all material labour T & P etc. required for proper completion of the work paint to be used should confirm the. 644+645 sor 2022
1190
119000
100