Ghaziabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Ghaziabad Development Authority - GDA Tender

Works
Eprocure
Opening Date12 Mar 2019
Closing Date18 Mar 2019
Tender Amount₹ 41,23,101 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of Park Boundary Wall and Filling Work at Indraprasth Scheme, Pocket-H
Construction of Park Boundary Wall and Filling Work at Indraprasth Scheme, Pocket-H
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC work with cement, approved coarse sand and 2 cm guage stone grit in proportion of 1:1/2:3 for column excluding supply of reinforcement and its binding with 24 BWGGI binding wire ,and including necessary centering and shuttering etc. , all materials labour , T&P etc. required for proper completion of the work.The rate excludes making of drip course which shall be paid extra . SI 289

53.9

431200

8000

... More
M.S (tor steel or plain) in works such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.SI 504

72.45

405720

5600

... More
M-150 brick work in one cement & six fine sand 1.25 FM (1:6)mortar in foundation and plinth including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.303

17.65

69717

3950

... More
M-150 brick work in one cement & coarse sand 1.25 FM (1:4)mortar in super stucture including necessary cutting &moulding of brick as required thickness of wall to be half brick wall including supply of all materials , labour , T&P etc. required for proper completion of the work.S.I.305A+309+310A

18

90540

5030

... More
M.Sor Iron works of small size and section such as holding down bolts, hold fast for MS grill & Staircase railing. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of work, SI 502(A)

44.8

284480

6350

... More
Painting roofs are other iron work in large area with one coat priming and two coat approved (Above 1.00 Sqm) Paint (British antesol or equivalant) including supply of all materials, labour and T & P etc. required for proper completion of the work.Paint to be used should confirm the ISI no 103-109 SI no 644 + 645

230

16100

70

... More
12mm thick plaster with cement and fine sand of 1.25 F.M. in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.SI 584

770

115500

150

... More
Finishing wall with weather cement paint(Asian or Berger brand) of approved make and Quality on new wood with three coat to give an even shade including supply of all materials, labour and T & P . SI NEW ITEM (80+35)= 115.00

770

88550

115

... More
M.Sor Iron works of heavy size and section such as holding down bolts, hold fast , tie rods , grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of work, SI 503

2

12900

6450

... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the from of regular pits not exceeding 0.50M. in depth and earth work in embankemnt to be in 20cm. layers including remmeing and dressing the surface to required levels and slopes and also including 1.50M lift and 30M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30M. distances as directed by the Engineer incharge. and disposal of earth beyond 5.00 Km (173-95+45+90) = 213.00

11302

2407326

213



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.