GAIL India Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

GAIL India Limited - GAIL Tender

Services
Civil And Construction
Pipe Line Project
Eprocure
Opening Date20 Aug 2024
Closing Date10 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For Parallel length more than 5 Km up to 20 Km ( in single or multiple stretch on either side of road) per authority.

10

-

-

... More
For any Parallel length greater than 20 Km ( in single or multiple stretch on either side of road) per authority.

5

-

-

... More
SH / Other Roads (Crossing): Obtaining permission / NOC for SH / Other Road Crossings for laying of pipeline along with OFC.

725

-

-

... More
SH / Other Roads (Parallel): Obtaining permission / NOC for SH & Other Roads Crossing for laying of Gas Pipeline Parallel to & Within the RoW along with Optical Fiber Cable.

-

-

-

... More
For parallel length up to 5 Km ( in single or multiple stretch on either side of road) per authority.

50

-

-

... More
For Parallel length more than 5 Km up to 20 Km ( in single or multiple stretch on either side of road) per authority

25

-

-

... More
For any Parallel length greater than 20 Km ( in single or multiple stretch on either side of road) per authority

10

-

-

... More
Municipal Area: Obtaining permission / NOC for all crossings falling under the jurisdiction of one Municipal Area / Municipal Division as the case may be, for Roads ( Crossing & Parallel to & Within the RoW), Nalah, Drains, Water Pipelines and all other utilities for laying of Gas Pipeline along with OFC.

5

-

-

... More
River Crossing: Obtaining permission / NOC - for laying of Gas Pipeline along with OFC across River .

75

-

-

... More
Canals, Nallahs / Drains & Other Water Bodies (Crossing): Obtaining permission / NOC for laying of Gas Pipeline along with OFC across Canals, Nallahs / Drains & Other Water Bodies etc.

750

-

-

... More
River, Canals, Nallahs / Drains & Other water bodies (Parallel to with in Row): Obtaining permission / NOC for laying of Gas Pipeline along with OFC parallel to within RoW of Rivers, Canals, Nallahs / Drains & Other water bodies etc.

20

-

-

... More
Foreign Pipeline: Obtaining Permission / NOC for laying gas pipeline along with OFC across foreign pipelines such as Gas Pipelines, Oil Pipelines, Water Pipelines, Slurry Pipeline etc.

100

-

-

... More
Railway Track (Pipeline Crossing): Obtaining permission / NOC for laying of Gas Pipeline ( with or without OFC) across Railway Track (s) . The item includes clearance of proposal from all Railway Authorities / Departments such as DRM, DE's, Land Cell, Signals, CBE and CRS etc. complete in all respect for obtaining Final Permission.

40

-

-

... More
Railway Track (OFC Crossing): Obtaining permission / NOC for laying of Optical Feber Cable (OFC) across Railway Track (s) . The item includes clearance of proposal from all Railway Authorities / Departments complete in all respect for obtaining Final Permission.

40

-

-

... More
Protected / Reserved / Revenue Forest : Obtaining Permission / NOC for laying gas pipeline along with OFC through Protected / Reserved / Revenue Forest. Item includes all activities necessary for obtaining permission / NOC such as preparartion of Non-Forest Land Schedule ( Collection of Revenue Data ), obtaining FRA etc. as per new Forest Guidelines dated 29.11.2023 ( including subsequent amendtments , if any). The scope of work under this item includes but not limited to obtaining Stage- I , working permission and Stage-II or Final Permission. Permission required for Felling/cutting of trees, involved in the forest clearnce proposal is not covered under this item.

-

-

-

... More
All states of India except Jharkhand & Odisha .

-

-

-

... More
Obtaining Forest Permission by arranging Degraded Forest Land from State Forest Department for Compensatory Afforestation

10

-

-

... More
Obtaining Forest Permission by arranging Revenue Forest Land from Concerned State Authority (ies) for Compensatory Afforestation.

10

-

-

... More
Obtaining Forest Permission by arranging Non-Forest Land from Concerned State Authority (ies) / Other sources for Compensatory Afforestation.

5

-

-

... More
Forest permission in the State of Odisha & Jharkhand: The item includes identification of Forest and Non-Forest Area and all other necessary details / data as required for Forest Proposals in Odisha and Jharkhand. Item also includes but not limited to obtaining NOC from District Magistrate / Collector for Gair Majrua Jangal Jhadi in the State of Jharkhand. The item doesn't cover Forest Area Survey by ORSAC / Collection of maps from ORSAC in Odisha as per requirement of Odisha Forest Department .

-

-

-

... More
Obtaining Forest Permission by arranging Degraded Forest Land from State Forest Department for Compensatory Afforestation

2

-

-

... More
Obtaining Forest Permission by arranging Revenue Forest Land from Concerned State Authority (ies) for Compensatory Afforestation.

2

-

-

... More
Obtaining Forest Permission by arranging Non-Forest Land from Concerned State Authority (ies) / Other sources for Compensatory Afforestation.

1

-

-

... More
Social Forest: Obtaining Permission / NOC for laying gas pipeline along with OFC through Social Forest.

20

-

-

... More
National Park / Sanctuary / Eco Sensitive Area: Obtaining Permission / NOC for laying gas pipeline along with OFC through National Park / Sanctuary / Eco Sensitive Area complete in all respect..

2

-

-

... More
Wildlife Corridor : Obtaining Permission for Wildlife Corridor falling enroute pipeline. The scope of work under this item includes follow up with State Board of Wildlife ( SBWL), National Board of Wildlife ( NBWL), and National Tiger Conservation Authority ( NTCA) etc. The item includes providing all requisite documents to authorities such as Drone Survey report of the area, details of Animal Passage Plan, Biodiversity Impact Assessment Plan, etc. all complete as per requirement of concerned authrorities and directions of EIC.

2

-

-

... More
Industrial Area / Area Under Development Authorities / Special Economic Zone (SEZ): Obtaining permission / NOC for laying gas pipeline along with OFC in Industrial Area / Area Under Development Authorities / Special Economic Zone (SEZ) etc.

4

-

-

... More
Coastal Regulatory Zone (CRZ): Obtaining permission / NOC for laying gas pipeline along with OFC in Coastal Regulatory Zone (CRZ). EIA Report which includes MIA study reports, ERDMP, EMP, CRZ maps, kml/shapefile etc. prepared by authorized agencies as per latest CRZ notifications required for proposal shall be provided by GAIL.

4

-

-

... More
Mangroves Crossing : Obtaining Permission for laying Gas Pipeline through CRZ1A (Mangroves) and CRZ1A (Mangroves Buffer Zone) Area falling under Coastal Regulatory Zone (this permission is prerequisite for obtaining permission from various Statutory Authorities such Hon’ble High Court, CRZ Authorities etc. ). Item includes preparation and submission of all requisite documents required for obtaining permission .

2

-

-

... More
Hon’ble High Court Permission: Obtaining permission from Hon’ble High Court required for laying Gas Pipeline through CRZ1A (Mangroves) and CRZ1A (Mangroves Buffer Zone) Area falling under Coastal Regulatory Zone . Services of advocate / expenses occurred for hiring of advocate as the case may be for such permission from Hon’ble High Court will be provided / borne by GAIL.

2

-

-

... More
Consent to Establish (CTE): Obtaining NOC/consent to establish from SPCB's for laying Pipeline alongwith OFC for the project consisting of mainline along with associated SV/CP Station, Pumping Stations, Tap Off stations, Receiving Stations as per the project description including applicable consent for air & water as per the applicable Act for establishment, complete as per the terms & conditions and scope of work. In case of consoldated application or consolidated permission from one State Pollution Control Board as the case may be, One quantitity to be considered for payment for each Regional Office (RO) of respective State Pollution Control Board.

25

-

-

... More
Consent to Establish (Renewal): Renewal of NOC for CTE from respective State Pollution Control Board. One quantitity to be considered for payment for each Regional Office (RO) of respective State Pollution Control Board.

5

-

-

... More
Environment Clearance (EC): Obtaining permission / NOC for Environment Clearance (EC) for laying Gas Pipeline alongwith OFC.

2

-

-

... More
Underground Power Cable / OFC: Obtaining permission / NOC for underground power Cable / OFC Crossing .

100

-

-

... More
Services for Permanent Land Acquisition through direct negotiations:

-

-

-

... More
Identification of land: Identification of govt. land / plot en-route pipeline & if the same is not available, identifying private land with minimum two to three options acceptable by GAIL in writing depending upon site location and selection of most suitable land / plot & obtaining of revenue records such as Khatauni/Jamabandi, X- Sizara/ village- map, identification of survey no(s) on field and ascertaining ownership of land /plot to be purchased.

20

-

-

... More
Obtaining consent from land owners: Obtaining In-principle consent from the land owners, establishing correctness of ownership, establishing share of land owners, obtaining revenue records such as Non- Encumbrance Certificate etc., collecting Circle rates of land, obtaining sale deeds of similar type of land situated in the nearest vicinity during immediately preceding 03 years of the year in which purchase of land is proposed to be made as per Scope of Work & as directed by EIC.

20

-

-

... More
Signing of rate agreement: Obtaining consent to sale, rate agreement with owner, obtaining of statuary NOC's, approvals from authorities concerned, Legal Vetting, measurement of land etc. before registration of land as per Scope of Work & as directed by EIC.

20

-

-

... More
Obtaining Non-agriculture approval: Obtaining Non-Agricultural Approval for the land, Obtaining Town Planning Approval from concern authority if applicable, Preparing draft of sale deeds, vetting, liaisoning with Registrar /sub- registrar/Tehsil officials for execution of sale deeds as per Scope of Work & as directed by EIC.

20

-

-

... More
Physical possession of land: Execution of sale deed & Registration and Physical Possession of land as per Scope of Work & as directed by EIC.

20

-

-

... More
Mutation of land in revenue record: Mutation of land in Revenue Records and change of land use (wherever required) as per Scope of Work & as directed by EIC.

20

-

-

... More
Permanent land acquisition - Govt. procedure: Services for permanent land acquisition through Govt. land acquisition procedure.

-

-

-

... More
Identification of land: Identification of land /plot with alternative minimum 2 - 3 options, depending upon site location and selection of most suitable land/plot and obtaining of revenue records such Khautoni/Jamabandi/LPC, Khasra, X- Sizara/ village- map, identification of survey no(s) on field and ascertaining ownership of land /plot to be purchased.

10

-

-

... More
Obtaining consent from land owners: Obtaining In-principle consent from the land owner(s), Preparation of proposal and its submission to respective authorities. (ii) Follow up with concerned authorities for assistance & compliance of section (4), (5),(6), (7), (8) as the case may be.

10

-

-

... More
Follow-up publication of notification: Follow up for Publication of Notification under Section (11), Hearing of objections U/s (15) and compliance of section (17), (18), (19), wherever required. (ii) Assistance for serving notices to persons interested, compliance of Section (22), (23).

10

-

-

... More
Follow-up determination of market rate: Follow up for determination of market value of land, amount of compensation, value of things attached to land and award of solatium u/s (26) to (30) respectively. (ii) Follow up with authority concerned for compliance of section (33) to (38) respectively.

10

-

-

... More
Physical possession of land: Physical Possession of land, and all other miscellaneous activities related to Acquisition of Permanent Land under RFCTLARR Act, 2013.

10

-

-

... More
Mutation of land in revenue record: Mutation of land in Revenue Records and Change of Land Use (CLU), wherever required.

10

-

-

... More
DGPS Survey for Compensatory afforestation land: DGPS Survey for Compensatory afforestation land as required by Forest department including demarcation,fixing of pillers for forest boundary as desired by respective Forest Department and preparation, submission of report, Drawing, etc. (in soft and hard copies) Complete as per direction of EIC.

80

-

-

... More
DGPS Survey for pipeline route: DGPS Survey for pipeline route of Forest Area as required by Forest department including demarcation, fixing of pillers for forest boundary as desired by respective Forest Department and preparation, submission of report, Drawing, etc. (in soft and hard copies) Complete as per direction of EIC.

50

-

-

... More
GIS DATABASE CREATION: Creation of GIS Database and uploading all details / documents related to crossing permissions into GAIL's PGIS Server ( such as Applications , Demand Notes, Payment related Documents, Agreements and Final Permissions etc. ) as per directions of EIC.

1000

-

-

... More
Fixing of stone pillars: Providing & fixing of stone pillars upto 100 X 150 X 1200 mm size as per specification including soil excavation, compaction and embedding in 1:3:6 PCC in Forest / Non-forest area or as per the directions of respective authority & EIC.

400

-

-

... More
Fixing of Pre-cast RCC Pillars: Providing & fixing Pillars of high precast reinforced cement concrete 1:2:4 (1 Cement: 2 coarse sand: 4 Coarse aggregate) with reinforcement as per specification including soil excavation compaction and embedding in 1:3:6 PCC in Forest area or as per Forest Department specification.

20

-

-

... More
Note: The description of all items as mentioned above may be read in conjunction with detailed scope of works as elobareted elsewhere in the tender document.

-

-

-

... More
Total amount excluding GST

-

-

-

... More
GST (CGST&SGST/UTGST or IGST) in percentage (%) on Net Total Amount

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.