GAIL Gas Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

GAIL Gas Limited Tender

Works
Eprocure
Opening Date26 Oct 2023
Closing Date23 Nov 2023
Tender Amount₹ 26,72,86,798.76 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 32 mm), Warning Mat etc. Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route, laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipments, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store. -Laying of all PE pipe (PE 100 SDR11), Including supply of HDPE casing pipe (in case of HDD (with case).Moling(with case) , Couplers, End caps etc. (Ref. cl. 4.3 of Particular job specification). -Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge. -Casing details is as given below:- 1. For 20/32 mm PE pipe (in 75 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 2. For 63 mm PE pipe (in 125 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 3. For 90 mm pipe (in 180 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0). 4. For 125 mm pipe (in 250 mm dia. HDPE Casing Pipe, PE63/80 PN 6.0).

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings.

-

-

-

... More
Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:

-

-

-

... More
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval.

-

-

-

... More
Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area.

-

-

-

... More
Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawing enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.

-

-

-

... More
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)

-

-

-

... More
Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per standard drawings, data sheets & technical specifications, padding around pipeline including supply of suitable padding material duly approved by EIC, backfilling to its original condition with excavated earth / borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.

-

-

-

... More
The scope of work against this item also include Electro-fusion jointing of valves, fittings wherever required and as directed by Engineer-in-charge.

-

-

-

... More
The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).

-

-

-

... More
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) .

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ PMC.

-

-

-

... More
Preparation and submission of Daily progress report, Laying Graphs / PE line cards on daily basis.

-

-

-

... More
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.

-

-

-

... More
In case, the minimum required depth is not possible due to site condition, necessary mitigation measures (for minimum top cover of 600mm) shall be required to be taken by contractor in consultation with EIC as per PNGRB Guidelines. No additional payment shall be admissible against the same. However required top cover can further be reduce till 375mm and payment against the same shall be made according to SOR item no. 1.3 or 1.4 (whichever is applicable).

-

-

-

... More
Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
20 mm PE 100 pipe Service line laying upto 4 M length

32

-

-

... More
20 mm PE 100 pipe

320

-

-

... More
32 mm PE 100 pipe

89920

-

-

... More
63 mm PE 100 pipe

41920

-

-

... More
90 mm PE 100 pipe

3840

-

-

... More
125 mm PE 100 pipe

24320

-

-

... More
DELETED

-

-

-

... More
NOTE i) The lengths of pipelines are tentative. ii) For restoration of asphalt / concrete roads, the item for construction of asphalt top / concrete top / Tiles/Stone slab/Paver Blocks/Curb Stones shall be paid separately as per the rates quoted for the same elsewhere in the SOR. iii) In case, contractor prefers to lay the pipeline through HDD method in place of method as per SOR item- 1.1, contractor shall be required to lay the pipe upto a depth not more than 1.4 m. The payment shall however be made as per SOR item No.- 1.1 only. iv) In case quantity increases beyond 4 meter (against SOR item no 1.1.a) payment towards additional length shall be paid as per SOR item no. 1.1.b. v) For PE laying through casing pipe ,payment for length of PE pipe will be done as per casing pipe length. vi) Payment for items above under pipeline laying in all type of rocky strata shall be made only whereever hard rock is existing and supply and installationj of padding materails(i.e. sand/soft soil)shall be done as per the direction of EIC.Bidders to quote accordingly.

-

-

-

... More
Restoration

-

-

-

... More
Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required, as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to the satisfaction of Engineer-in-charge.

-

-

-

... More
Asphalting

7981

-

-

... More
Cement Concrete

7981

-

-

... More
Tiles / Paver / Blocks / Curb Stones, Red sand stone

19950

-

-

... More
Brick Soling / Channels, etc.

11966

-

-

... More
Providing, hoisting and placing of 75 mm thick precast reinforced cement concrete slab of M-20 grade over pipeline as mechanical protection including the cost of required centering, shuttering, reinforcement complete as per tender drawing and direction of the EIC. Note:- Size (Length x Width) of the precast slab will be decided as per site condition and as per instruction of EIC. Precast slab will be placed in multiple number and various location as per site condition and as per instruction of EIC.

47

-

-

... More
Pipe laying inside Private Property i.e Multistory buildings / apartments with no movement of Heavy Vehicles, surrounded with Boundary wall where pipe top cover could not be achieved 600 mm.

-

-

-

... More
Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 110mbar.

-

-

-

... More
Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top, the RCC slab of the roof of basement shall be treated as bottom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.

-

-

-

... More
Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc. Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables,equipments, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.

-

-

-

... More
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawing enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.

-

-

-

... More
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)

-

-

-

... More
Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.

-

-

-

... More
The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).

-

-

-

... More
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) .

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ Consultant.

-

-

-

... More
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
20 mm PE 100 pipe / 32 mm PE 100 pipe

2331

-

-

... More
63 mm PE 100 pipe

264

-

-

... More
Pipe laying inside Private Property i.e Multistory buildings / apartments with no movement of Heavy Vehicles, surrounded with Boundary wall where pipe top cover could not be achieved 600 mm.

-

-

-

... More
Minimum pipe top cover of 375 mm is required and the line pressure shall not exceed 110mbar.

-

-

-

... More
Necessary mitigation measures such as RCC slab (150mm thick and 300mm width) at the top and RCC slab (100mm thick and 300mm width) at bottom. There shall be sand filling across three sides of the line pipe of 100mm each shall be required to be taken by contractor in consultation with EIC as per latest PNGRB Guidelines. No additional payment shall be admissible against the same.

-

-

-

... More
Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of 20mm, 32mm & 63mm PE pipe (PE 100 SDR11) including proper stacking, identification,and supply of accessories of below mentioned sizes & all thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc. Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route , laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables,equipments, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawing.

-

-

-

... More
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawing enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.

-

-

-

... More
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata (Rock Cutting to be paid separately as per SOR no 1.120) and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)

-

-

-

... More
Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per drawing and backfilling to its original condition with excavated earth / borrowed select soil / sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.

-

-

-

... More
The scope of work against laying of 20/32 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)),(H=300mm & will be as per site condition) ), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply).

-

-

-

... More
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) .

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ Consultant.

-

-

-

... More
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
20 mm PE 100 pipe / 32 mm PE 100 pipe

2331

-

-

... More
63 mm PE 100 pipe

264

-

-

... More
Supply of GI/ MS/ Concrete Sleeves (wherever required as a Special Case as per instructions of the Engineer-in-charge)

-

-

-

... More
Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. GI/MS Pipes shall be Heavy (C-Class) as per IS-1239

-

-

-

... More
GI Sleeves /Concrete Sleeves

-

-

-

... More
2 1/2” NB, 1’ Length

4

-

-

... More
4” NB, 1’ Length

4

-

-

... More
MS Enamel Coated

-

-

-

... More
4” NB, 3’ Length

2

-

-

... More
Concrete Sleeve (NP-2 Class)

-

-

-

... More
4” NB, 3’ Length

4

-

-

... More
6” NB, 3’ Length

2

-

-

... More
The decision regarding use of type of sleeves to be used at various locations shall be made by Engineer In-Charge / Owner

-

-

-

... More
Installation of valve in pit including supply of valves

-

-

-

... More
Supply of isolation valves (as per data sheet) and installtion of valves in the valve pits as per typical drawing and specification enclosed and instructions of Engineer-in-charge. Payment of valve pits shall be paid separately as per SOR.

-

-

-

... More
PE Valve 32 mm dia

106

-

-

... More
PE Valve 63 mm dia

21

-

-

... More
PE Valve 90 mm dia

21

-

-

... More
PE Valve 125mm dia

21

-

-

... More
PE Valve 180mm dia

-

-

-

... More
Construction of Valve Pits as per the enclosed tender drawing and specification. The item includes supply of all the material including Pre-cast RCC cover, shuttering, reinforcement, labour, curing etc as per the drgs, specification and instruction of EIC.

-

-

-

... More
Type-I having Internal size of Minimum 1000 x 1000mm

42

-

-

... More
Type-II having Internal size of Minimum 600 x 600mm

127

-

-

... More
Note: The tender drawing enclosed is only for reference purpose and contractor shall be required to prepare drawings (in line with reference tender drawing) for specific sizes of Valve pits and the same shall be approved by EIC.

-

-

-

... More
Fabrication & Installation of Markers

-

-

-

... More
RCC Route Markers

-

-

-

... More
Supply, fabrication and installation of RCC route markers as per the attached drawing in technical volume, along the route including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete.

3378

-

-

... More
Pole Markers with Foundation

-

-

-

... More
Supply, fabrication and installation of plate markers as per the attached drawings in technical volume including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete, cleaning, stencil let.

591

-

-

... More
VOID

-

-

-

... More
Paver Block-Tiles Markers

-

-

-

... More
Supply, fabrication and installation of Pvaer Block-Tiles markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the attached drawings to be installed on Paver Block/Tiles on foot Path/As per the instruction of EIC.

352

-

-

... More
Liaisoning with Land Owning Agencies for Permission

-

-

-

... More
Submission of applications as per approved drawing provided by owner / owner's representative (Initial Route survey, prepartion of drawing, measuring and providing details of surface type shall be in scope of contractor), obtaining and submission of demand note, coordination, Liaisoning, obtaining written permission from land owing agencies like NHAI, AAI,Indian Railways and any other government agencies who maintains the public lands and agencies owing Private lands etc. (all fee paid to authorities excluding demand charges or Bank Guarantees shall be reimbursed against documentary evidence). This rates are not applicable for Private lands i.e. Apartments etc. Permissions required from various authorities like NHAI / Railways / Irrigation (Canal) etc. falling enroute shall be inclusive in the item rate.

84

-

-

... More
Construction of RCC structure for protection of service line for drain/nallah Crossings

-

-

-

... More
Construction of Non suspended slabs/pavement slabs including pedestal/ramp etc.using reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix with 20 mm & down size graded crushed stone aggregates) to protect the PE pipe laid. All necessary form work, finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. shall be as specified and directed by EIC. The rates shall include grouting of pockets, supply of all material, tools, reinforcement steel etc.

2

-

-

... More
GPR Survey ( Scope includes submission of GPR survey report before/after obtaining permission for excavation from land owning agencies with complete satisfaction of the land owning agnency & Owner)

-

-

-

... More
GPR Survey - Length up to 100 meter

7

-

-

... More
GPR Survey - Length more than 100 meter Note :-In case GPR survey length exceeds 100m, for quantity beyond 100m, amount in addition to SOR item no.- 1.110.a, shall be payable based on per meter rate quoted against SOR item no. 1.110.b

275

-

-

... More
Excavation of Hard rock/surface

-

-

-

... More
Excavation of trench or pits, wherever hard rock presence is exceeding 1.5 m in any direction of the trench and excavation of trench or pits in Malba/Multiple layers of asphalt/ brick / PCC/RCC etc and removable only by pneumatic chisel / drill as per the specifications and direction of EIC. The rates are payable over and above the Laying rates as per relevant SOR no. 1.1

-

-

-

... More
Cutting of PCC/RCC surface with thickness more than 12" or Continuous asphalt multi-layer/ Malba/ Brick / Boulders more than 24".(Malba shall be considered as a strata where soil is in mixed form of debris/building rubbish or discarded pieces of bricks/stones )

26

-

-

... More
Rock Cutting encountered while excavation of trenches for item 1.1 of SOR, not exceeding 1.5 meter in width, and lift upto 1.5 meter, including getting out the excavated soil and disposal of excavated soil as directed within a lead of 50 meter. In case of rocky soil, the bedding shall be done with approved/ good quality packing sand, subject to the approval of the EIC, the size distribution of the sand / shall be the same as per soil. The packing sand shall be placed to a minimum thickness of 150mm around the pipe in case of rocky terrain.

4

-

-

... More
DRS/DCU/DRS cum DCU/MRS/Metering skid works

-

-

-

... More
Installation of DRS/DCU/DRS cum DCU

-

-

-

... More
Receiving and taking over, handling, loading, transportation and unloading of DRS/DCU/DRS cum DCU from Owner's designated stockyards to site, installation at foundation (including supply of all structural items) and hooking up with PE pipe including all works as required to complete the job as per the drawings and specification, scope of work mentioned in tender doucment. The scope includes supply of transition fittings and other PE and CS fittings as per requirements and various associated works (including steel welding) to commission DRS/DCU/DRS cum DCU. Note: 1) Amount towards civil work shall be payable as per related SOR items. 2) Rate to include cost of all labour, tools, tackles, equipment, hire charges. 3) Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the Contractor within the rate quoted. These items shall not be separately measured and paid.

-

-

-

... More
DCU/DRS cum DCU. (Maximum weight of single DCU/DRS cum DCU shall be about 6.0 T)

2

-

-

... More
MRS/Metering Skid(Maximum weight of single MRS/Metering skid shall be about 4T)

2

-

-

... More
Note: i) The quantities mentioned are indicative only. ii) For all the supply items mentioned above, procurement shall be made as per specification after due approval of engineer- in - charge. Iii) All inlet work of DRS/DCU/DRS cum DCU works will be in the scope of Steel laying /Composite work contractor.

-

-

-

... More
VOID

-

-

-

... More
CIVIL WORKS

-

-

-

... More
Earth Work

-

-

-

... More
Earth in excavation and filling to the grades and levels shown in the approved drawings in all kinds of conditions including for Road embakments, using approved quality good earth from designated borrow area, for all heights and depths including clearing and stripping (min. 150 mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading in layers not exceeding 150 mm thickness, breaking clods, watering (if reqd.), ramming and compacting by manual/ mechanical means to give minimum 92% of modified Proctor's density of earth, testing & dressing including disposal of all unserviceable material all complete as per specifications and directions of Engineer-in-charge.

23

-

-

... More
(Rate to include cost of all labour, tools, tackles, equipment, hire chanrges, cost of borrow earth by way of royalties, right of way, cess etc., as applicable with all bye works and sundry works).

-

-

-

... More
PCC 1:2:4

-

-

-

... More
1 Cement : 2 Coarse sand : 4 stone aggregate 20mm nominal size.

23

-

-

... More
PCC 1:4:8

-

-

-

... More
1 Cement : 4 Coarse sand : 8 stone aggregate 40mm nominal size.

23

-

-

... More
(Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering, earthwork in excavation and backfilling using approved earth in all conditions etc. with all bye works and sundry works.)

-

-

-

... More
Reinforced Cement Concrete

-

-

-

... More
Providing and laying reinforced cement of grade M-25 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers, column, equipment foundation, cable trench inlcuding construction joints, bitumen painting on surface in contact with soil, supplying and fixing reinforcing steel, shuttering, inserts, finishes etc. at all depths and heights complete as per drawings, specifications and direction of the Engineer-in-charge.

23

-

-

... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all maerials such as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/F steel, Inserts, bolts, conduits, bitumen, other minor constrcution materials, shuttering, stanging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.

-

-

-

... More
Concrete Pavement

-

-

-

... More
Providing and laying reinforced cement concrete of (M-25 grade) with 20mm and down grade crushed stone aggregate in pavement, including preparation of base (i.e. compacted subgrade, 200 thk sand and 50 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineer-in-charge.

-

-

-

... More
- 150mm thick (Type-I)

23

-

-

... More
Brick Work

-

-

-

... More
Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curring, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Enfineer-in-charge.

23

-

-

... More
(Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement, bricks, finishes, bitumen, other minor constrcution materials, shuttering, staging, masonry work, plastering, painting etc. with all bye-works and sundry works).

-

-

-

... More
Note: The quantites of individual item can varied as per site requirement.The payment will be made as per actual certified measurement at site.

-

-

-

... More
Laying of Brick layer/ Concrete

-

-

-

... More
Providing single layer of Brick / Concrete / or impact resistant tape to entire width of trench above Warning Mat placed in trench over the laid pipeline as per OISD 226, standard drawing, specification and instruction of Owner. (Rate to include cost of all labour, tools, tackles, equipment, hire charges & supply of all materials, etc)

-

-

-

... More
Brick Layer for width of PE pipeline trench as per drawing (75 mm thk.)

165

-

-

... More
Concrete for width of PE pipeline trench as per drawing (80 mm thk.)

111

-

-

... More
Demolition of PCC work below plinth level

-

-

-

... More
Demolishing plain cement concrete (PCC) work (taking all necessary safety precautions) for all depths below plinth level including supply of all tools & tackles, necessary scaffolding, propping, underpinning, etc. , disposal of unserviceable material outside the boundary limits keeping the owner indemnified of any liabilities from statutory/ local bodies, all complete work as specified and directed

4

-

-

... More
Excavation for foundation works

-

-

-

... More
Excavation as per plan, upto 3 meters and upto any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be levelled and neatly dressed complete in all respect as per scope of work, technical specification and directions of EIC.

-

-

-

... More
Upto 3.0 Mtrs

5

-

-

... More
Dismantling of RCC & cutting of reinforcement (Thickness above 3”)

5

-

-

... More
Core Cutting of RCC structure/Brick Wall

2

-

-

... More
Structural Works

-

-

-

... More
Providing and fixing Fencing Structure

-

-

-

... More
Supplying, fabricating & fixing steel structural fencing fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, including applying two coats of approved quality of synthetic enamel paint over a priming coat of in approved shade including supply of all raw materials, bolts, electrodes, transportation, including making pokets & pouring with PCC (1:2:4) in of block 500x500x500 for fixing of posts etc complete as per enclosed drawing, technical specifications, scope of works and directions of the Engineer-In-Charge.

-

-

-

... More
Fencing height 2.1m

67

-

-

... More
Providing and fixing Fencing Gates

-

-

-

... More
Supplying, fabricating & fixing fencing gates fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, painting with enamel paint in approved shade including supply of all raw materials, bolts, electrodes, transportation etc complete as per enclosed sketch, technical specifications and directions of the Engineer-In-Charge.

-

-

-

... More
4m Wide x 2.1m High

2

-

-

... More
3m Wide x 2.1m High

2

-

-

... More
1m Wide x 2.1m High

2

-

-

... More
Electrical

-

-

-

... More
Supply, Installation and testing of Galvanized iron earth electrode with 3mts long 65mm dia GI perforated pipe Class B, Complete with GI earth bus, test link in RCC / Brick earth pit, charcoal, salt, funnel and earth pit cover as per IS:3043, (as per drg. enclosed)

4

-

-

... More
Supply and installation of GI earthing conductor of the following sizes:-

-

-

-

... More
Above ground/buried under ground

-

-

-

... More
25X 6mm GI Strip

70

-

-

... More
2.5 sq.mm CuPVC wire

176

-

-

... More
10sq. Mm Cu PVC insulated cable

176

-

-

... More
Preservation of Pipeline

-

-

-

... More
Preservation of pipeline sections and associated facilities (in event of delay in comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month or part thereof.

-

-

-

... More
DELETED

-

-

-

... More
For 125 mm Pipeline

23572

-

-

... More
For 90 mm Pipeline

4046

-

-

... More
For 63 mm Pipeline

4046

-

-

... More
For 32 mm Pipeline

106587

-

-

... More
For 20 mm Pipeline

352

-

-

... More
For every additional period of one month or part thereof Limited to 6 month

-

-

-

... More
DELETED

-

-

-

... More
For 125 mm Pipeline

21110

-

-

... More
For 90 mm Pipeline

21110

-

-

... More
For 63 mm Pipeline

21110

-

-

... More
For 32 mm Pipeline

106587

-

-

... More
For 20 mm Pipeline

352

-

-

... More
Notes: i) The above length is not for a single section but for no. of sections. ii) All accessrious ie; End caps and two nos tappings of 3/4 inches, PG to be considered per section and rate for the same shall be quoted by bidder under this item. iii) If month is partially complete, payment shall be made on prorata basis. iv) Scope includes pressure holding for a period of 6 months or as per EIC and jointing of PE pipe (if required) due to damage by any means and further filling of nitrogen for pressure holding.

-

-

-

... More
Note:(i) The quantites of individual item can varied as per site requirement.The payment will be made as per actual certified measurement at site. For the supply items the quantities shall be procured after approval from client/ consultant/EIC. (ii) The bidder must indicate currency(ies) against each quoted item of the SOR. (iii) The total amount shall also be given by the bidder in the quoted currency(ies). (iv) Some of the may / may not be execute as per site requirements.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.