GAIL Gas Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

GAIL Gas Limited Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date11 Aug 2022
Closing Date1 Sep 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Geotechnical ,Hydrological and Hydrographical survey data for Bore Holes is enclosed in bid document to the extent available. However MECON/GGL shall not be held responsible for the change of strata if found to be variable. Bidder/Contractor may ascertain the bore hole data by taking random samples if they feel the necessity. Carry out all other additional surveys, if required, for collecting data relevant to design & construction of crossing, engineering & design calculation, preparation of all necessary construction drawing duly approved by owner / concerned authority.

-

-

-

... More
Staking and installation of construction markers, clearing, fencing, grubbing, fullfilling all the requirements of various concerned statutory authorities to their entire satisfaction. Clearing & grading / cleaning of work area, shifting of all obstruction within the ROU/ pipeline corridor as per Pipeline route alignment viz. electrical lines/ poles, telephone line / poles, foreign pipeline/ utility cable, etc. Carryout liasioning & co-ordination works for Crossings and assistance in obtaining / getting permission from these authorities are covered in this item rate.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawings enclosed with tender document and to the entire satisfaction of Owner / Engineer-in-charge (EIC) / Resident construction manager (RCM).

-

-

-

... More
Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling after taking over from Owner by Contractor including management of their own dump site / yard, if required.

-

-

-

... More
Stringing of line pipes shall be kept / rested on straw/ sand/ soft soil bags (including supply) along the required alignment as per approved HDD profile. Additional space if required for string preparation and to keep pipeline string alignment in order shall be under contractor scope and included in this SOR items for all pipeline sizes.

-

-

-

... More
Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes to carry out welding and field adjustments including pipe fittings/flanges/valves etc. and their welding, carrying out destructive / non-destructive testing of welds as required as per the specification including 100% radiography by X-ray either by internal source or by external source based on site conditions/front availability and in this regard decision of EIC/RCM shall be final and binding to the contractor (In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC)/RCM based on site conditions) and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge (EIC) / RCM , carrying out re-radiography and other tests as required on repaired joints.

-

-

-

... More
Carrying out cleaning, gauging, water filling, pre-hydrotesting of complete pipeline string in one section/ test sections as approved by EIC/RCM to specified test pressures (i.e.1.5 times of Design pressure) for 4 hours hold period; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during pre-hydrotesting, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of pre-hydrotesting including dewatering of pipeline to acceptance criteria defined in the specifications. Supply of required quantity of corrosion inhibitor, if required for pre-testing of designated sections complete as per specification and approved by Engineer–in–charge (EIC)/ RCM. Note : 1. Leak detection, its rectification and successfully re-hydrotesting shall be carried out by Contractor with a view that completion of all activity for successful pre-hydrotesting should not be inordinately extended / delayed , which will hamper the overall project schedule. Further, no extra payment claim shall be entertained for re-hydrotesting, leak detection and their rectifications if defects found attributable to Contractor.

-

-

-

... More
Application of coating material on field joints of pipeline string after successful pre- hydrotest. Field joint coating material shall be supplied of special type "Dirax" or equivalent Heat Shrink Sleeve along with supply of special type coating repair patch material PERP -60E or equivalent compatible with 3-Layer PE coating as per tender/technical specifiations with prior approval of EIC/RCM.

-

-

-

... More
Preparation of pipe-book and other records as specified in the specifications

-

-

-

... More
Mobilization & demobilization as per contractor's scope of supply of all materials and consumables to work site's, HDD machine & other associated equipment, manpower and other resources including handling, loading, unloading, aligning, etc. Acquiring the required land by Contractor for storage, fabrication, site preparation and develop temporary approach access to work site for transportation of pipes and other construction equipments etc

-

-

-

... More
Getting permissions and work permit for river crossing as well as utility crossings (if any) encountered during river crossing prior to start the execution work from respective concerned authority.

-

-

-

... More
Drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata including soft & hard rock including pebbels, cobbles, boulders, structures.... etc., all depth to accommodate the pipeline at all conditions of the river crossings by HDD method.

-

-

-

... More
Installation of the proposed 12, 8", 6" & 4' inch pipeline at a minimum depth of 3 m (for normal soil)/ 2 m (for rocky strata) below the scour level or as desired by concerned authority (whichever is more stringent) or as per instruction of EIC by HDD method to the correct profile as per approved drawings. Decision of MECON/GGL on required depth of crossing shall be binding to the contractor.

-

-

-

... More
Carrying out cleaning, gauging and post installation hydrostatic testing of complete pipeline section laid by HDD method as approved by Owner to specified test pressure providing all equipment, pumps, test headers, fittings, instruments, dead weight tester, pressure recorder, etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required for successful completion of hydrotesting of pipeline to acceptance criteria defined in the specifications; complete dewatering and swabbing of the pipeline.

-

-

-

... More
Backfilling of the ditch / trench including restoration, clean-up of area, disposal of drilling fluid & waste, etc. to the satisfaction of Owner / Concerned Authority and getting NOC from concerned authority.

-

-

-

... More
Preparation and submission of as built drawings & other drawings, etc. duly approved by Owner.

-

-

-

... More
Final clean-up and restoration of additional land / right of use / corridor including obtaining NOC from respective land owners & statutory authorities if required, and disposal of debris and returning surplus material to Owner's designated disposal area(s)/ stockyard(s) as directed by Owner.

-

-

-

... More
IDENTIFIED CROSSINGS

-

-

-

... More
Vrindavan GA

-

-

-

... More
For All Type of Soil Strata

-

-

-

... More
Yamuna River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Vrindavan for carrier pipeline of size 150 NB x 6.4 mm thk. of API 5L Grade X-52.

900

-

-

... More
For Rocky Strata

-

-

-

... More
Yamuna River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Vrindavan for carrier pipeline of size 150 NB x 6.4 mm thk. of API 5L Grade X-52.

200

-

-

... More
Dakshin Kannada GA

-

-

-

... More
For All Type of Soil Strata

-

-

-

... More
Gurupur River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dakshin Kannada for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

180

-

-

... More
Nandini River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dakshin Kannada for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

180

-

-

... More
Netravati River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dakshin Kannada for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

120

-

-

... More
For Rocky Strata

-

-

-

... More
Gurupur River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dakshin Kannada for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

170

-

-

... More
Nandini River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dakshin Kannada for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

170

-

-

... More
Netravati River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dakshin Kannada for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

480

-

-

... More
Dhanbad GA

-

-

-

... More
For All Type of Soil Strata

-

-

-

... More
Sarsa Kundi River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 300 NB x 6.4 mm thk. of API 5L Grade X-52/56

300

-

-

... More
Bagh Mara Nala Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 300 NB x 6.4 mm thk. of API 5L Grade X-52/56

200

-

-

... More
Chas Nala River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

300

-

-

... More
Kandra Section Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

150

-

-

... More
For Rocky Strata

-

-

-

... More
Sarsa Kundi River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 300 NB x 6.4 mm thk. of API 5L Grade X-52/56

130

-

-

... More
Bagh Mara Nala Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 300 NB x 6.4 mm thk. of API 5L Grade X-52/56

400

-

-

... More
Chas Nala River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

180

-

-

... More
Kandra Section Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Dhanbad for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

200

-

-

... More
Rourkela GA

-

-

-

... More
For All Type of Soil Strata

-

-

-

... More
Distributary of Bramhi River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Rourkela for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

400

-

-

... More
Distributary of Sankh River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Rourkela for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

400

-

-

... More
For Rocky Strata

-

-

-

... More
Distributary of Bramhi River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Rourkela for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

200

-

-

... More
Distributary of Sankh River Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any at Rourkela for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

200

-

-

... More
UNIDENTIFIED CROSSINGS IN VRINDAVAN, DAKSHIN KANNADA , DHANBAD & ROURKELA GA

-

-

-

... More
For All Type of Soil Strata

-

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 300 NB x 6.4 mm thk. of API 5L Grade X-52/56

250

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

250

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 150 NB x 6.4 mm thk. of API 5L Grade X-52

250

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

250

-

-

... More
For Rocky Strata

-

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 300 NB x 6.4 mm thk. of API 5L Grade X-52/56

100

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 200 NB x 6.4 mm thk. of API 5L Grade X-52

100

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 150 NB x 6.4 mm thk. of API 5L Grade X-52

100

-

-

... More
Unidentified river Crossing along with adjacent road/asphalted road/ drain/ nala etc, if any for carrier pipeline of size 100 NB x 6.4 mm thk. of API 5L Grade X-52

100

-

-

... More
Notes: (i) Crossing length indicated here is tentative & may vary as per site condition. Bidders are advised to visit the site for actual assessment of extent of crossing and to assess the extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.

-

-

-

... More
(ii) Geo-technical investigation, Hydrological and Hydrographical survey ( if required) shall be performed by the contractor as per item mentioned else where in SOR.The contractor shall submit design calculation and all construction (profile) drawings,survey data for GAIL Gas Limited / PMC approval. Work shall start only after approval of the above.

-

-

-

... More
(iii) Contractor shall not be entilted for any extra payment due to location / area constraint, capacity of rig, etc.

-

-

-

... More
(iv) Payment for above item no. shall be made only for the approved profile string length laid by HDD method inline with proposed allignment route.

-

-

-

... More
(v) Failure of activities ie; Pulling, Gauging, Post Hydro-testing etc…. shall be responsibility of Contractor and no payment shall be payable to contractor. Loss of free issue material occurred due to failure shall be treated in-line with the provision of reconciliation of free issue material.

-

-

-

... More
(vi) Contractor have to provide GPS co-ordinate (both ends) of all the above mentioned HDD's to GGL/MECON for their future reference and GIS mapping.

-

-

-

... More
(vii) Based on the soil strata, if bidder / contractor feels requirement of any additional protective coating over and above 3LPE coated pipe/ joint coating for successful pulling / execution of HDD, the same shall be supplied and installed by the contractor after due approval by EIC without any additional cost to company and cost for the same is deemed to be included in above quoted rate.

-

-

-

... More
(viii) Rock shall be considered at location at which the core recovery is min 25%. If rock is found in Geo-Technical Investigation or while execution in approved pilot drilling path then the entire HDD Crossing length shall be payable through rocky strata item rate. In this regards decision of EIC shall be final and binding to the contractor.

-

-

-

... More
(ix)Payment for Gauging activity mentioned above shall be made under item mentioned else where in SOR.

-

-

-

... More
(X)BASED ON THE REQUIREMENT RATE FOR UNIDENTIFIED CROSSINGS IN VRINDAVAN, DAKSHIN KANNADA , DHANBAD & ROURKELA GA MAY BE OPERATED IN OTHER GA's NOT MENTIONED ABOVE.

-

-

-

... More
GEOTECHNICAL INVESTIGATION, HYDROGRAPHICAL & HYDROLOGICAL SURVEY OF RIVER/CANAL/NALA/ WATERBODIES

-

-

-

... More
Carrying out Pre-construction survey and detail survey for crossings after liasioning & coordination from concerned authority. Detail survey includes minimum but not limited to carrying out complete Geotechnical Investigation ( including all laboratory test & field test) , Hydrographical & Hydrological Survey of River/Crossings for the purpose of crossing by HDD method including obtaining work permit / NOC from concerned authority complete in all respect as per Scope of Work & Technical Specification and instruction of Engineer-In-Charge (EIC)/RCM and submitting Final Report & Drawing (along with soft copy) incorporating all field and laboratory data, Drawings, Maps, Data etc. (One Set) in an approved format with full scale for Soil Investigation, Scour Depth etc. in accordance with the Technical Specification, Drawings/documents, implementation schedule and other provisions of the Tender Document and instructions of the Engineer-in-charge (EIC)/RCM. NOTE: Payment for carrying out liasioning & co-odrination works as well as utility/ foreign pipeline (if any) for Crossings and obtaining permission / NOC from these authorities is included in above item rate.

-

-

-

... More
GEOTECHNICAL INVESTIGATION, HYDROGRAPHICAL & HYDROLOGICAL SURVEY OF RIVER

-

-

-

... More
Vrindavan GA

-

-

-

... More
Crossing of River / Canal/ Nala/ Pond/ Other Water body Crossing

1350

-

-

... More
Dakshin Kannada GA

-

-

-

... More
Crossing of River / Canal/ Nala/ Pond/ Other Water body Crossing

1800

-

-

... More
Dhanbad GA

-

-

-

... More
Crossing of River / Canal/ Nala/ Pond/ Other Water body Crossing

2360

-

-

... More
Rourkela GA

-

-

-

... More
Crossing of River / Canal/ Nala/ Pond/ Other Water body Crossing

1700

-

-

... More
GEOTECHNICAL INVESTIGATION & CROSSING SURVEY OF RAILWAY / ROAD/ CULVERT/ OTHER THAN WATER BODY CROSSING

-

-

-

... More
Vrindavan GA

-

-

-

... More
Crossing of Road/Railway/Culvert etc.

250

-

-

... More
Dakshin Kannada GA

-

-

-

... More
Crossing of Road/Railway/Culvert etc.

250

-

-

... More
Dhanbad GA

-

-

-

... More
Crossing of Road/Railway/Culvert etc.

250

-

-

... More
Rourkela GA

-

-

-

... More
Crossing of Road/Railway/Culvert etc.

250

-

-

... More
Note : (i) For Nala/Water Bodies/River/Canal etc Bidder/contractor have to execute Geo-technical, hydrological & hygraphical survey as per technical specification and direction of EIC ii)for railway/ road/ Culvert crossings, contractor have to execute geotechnical & crossing survey as per technical specification and direction of EIC.

-

-

-

... More
(ii) For geotechnical survey/investigation: 1. For River/Canal - Two Nos Bore holes each at both banks of depth 15 meter and in river bed bore holes of depth 25 m at a distance of 75 meter centre to centre.

-

-

-

... More
2. For Nala/Other Water Body Crossings..etc - One No Bore holes each at both banks of depth 15 meter and on bed bore holes of depth 15 m at a distance of 75 meter centre to centre.

-

-

-

... More
3. For Railway /Road / Culvert Crossings ..etc - One No Bore holes each at both sides of depth 10 meter.

-

-

-

... More
4.Laboratory test & field test shall be as per technical specification & tender documents.

-

-

-

... More
5. Bank width for Canal/nala/other water body crossings and survey length for railway crossings/road etc will be as per site conditions. Survey has to be done of bank width/survey width and minimum 50 meter at both end expect at river Crossings. For River crossing survey has to be done of bank width and minimum 100 meter at both end.

-

-

-

... More
6. Rock shall be considered at location at which the core recovery is min 25%.

-

-

-

... More
REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)

-

-

-

... More
Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in following items, noted and recorded at the time of "receiving and taking over" by Contractor in the presence of Engineer-in-charge (EIC)/RCM.

-

-

-

... More
Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:

-

-

-

... More
Specified OD, mm

-

-

-

... More
323.9

2

-

-

... More
219.1

2

-

-

... More
168.3

2

-

-

... More
114.3

2

-

-

... More
Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:

-

-

-

... More
Specified OD, mm

-

-

-

... More
323.9

2

-

-

... More
219.1

2

-

-

... More
168.3

2

-

-

... More
114.3

2

-

-

... More
REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR)

-

-

-

... More
Repair of Holiday in Coating (Noted and recorded at the time of "receiving and taking over")

-

-

-

... More
Supply of all coating repair materials as per requirements of specification to be compatible with line pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of Engineer-In-Charge (EIC)/RCM. This rate shall be applicable per sq. cm of the exposed steel area.

-

-

-

... More
Vrindavan GA

50

-

-

... More
Dakshin Kannada GA

50

-

-

... More
Dhanbad GA

50

-

-

... More
Rourkela GA

50

-

-

... More
LEAK / BURST (ATTRIBUTABLE TO OWNER)

-

-

-

... More
All works for locating leak / burst in Company's supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner /Engineer-in-charge/ Engineer in-charge (EIC)/RCM

-

-

-

... More
For 12" NB Line

1

-

-

... More
For 8" NB Line

1

-

-

... More
For 6" NB Line

1

-

-

... More
For 4" NB Line

1

-

-

... More
Note:

-

-

-

... More
(i) This rate is applicable for manufacturing defects in Owner supplied material only.

-

-

-

... More
(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.

-

-

-

... More
Gauging (Applicable for Pre & Post installation of hydrostatic test)

-

-

-

... More
As per specification and procedure approved by Engineer–in–charge (EIC)/ RCM.

-

-

-

... More
IDENTIFIED CROSSINGS

-

-

-

... More
Vrindavan GA

-

-

-

... More
150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

2700

-

-

... More
Dakshin Kannada GA

-

-

-

... More
200 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

3100

-

-

... More
Dhanbad GA

-

-

-

... More
300 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

2560

-

-

... More
100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

2160

-

-

... More
Rourkela GA

-

-

-

... More
200 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

1700

-

-

... More
100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

1700

-

-

... More
UN-IDENTIFIED CROSSINGS

-

-

-

... More
300 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

250

-

-

... More
150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

250

-

-

... More
200 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

250

-

-

... More
100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

250

-

-

... More
NOTE- (i) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during execution stage. (ii) The total quantities mentioned against the above SOR items are for multiple/various crossings at different location within GA . (iii) Payment for above item no. shall be made only for the approved pipeline string length for HDD. (iv) The requirement of gauging before prehydrotest & after pulling of HDD section shall be carried out as per MECON specification / OISD / PNGRB and same shall be approved by Engineer–in–charge (EIC)/ RCM. Execution of above item is subjected to clearance from EIC/GAIL Gas.

-

-

-

... More
Preservation of Pipeline

-

-

-

... More
Preservation of pipeline sections and associated facilities (in event of delay in permission, clearance from authority, comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge (EIC/RCM).

-

-

-

... More
Preservation of Identified Pipeline Crossing

-

-

-

... More
Vrindavan GA

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.

-

-

-

... More
Yamuna river Crossing- 6" NB Dia

1

-

-

... More
For every additional period of one month or part thereof

-

-

-

... More
Yamuna river Crossing- 6" NB Dia

1

-

-

... More
Dakshin Kannada GA

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.

-

-

-

... More
Gurupur River Crossing- 8" NB Dia

1

-

-

... More
Nandini River Crossing- 8" NB Dia

1

-

-

... More
Netravati River Crossing-8" NB Dia

1

-

-

... More
For every additional period of one month or part thereof

-

-

-

... More
Gurupur River Crossing- 8" NB Dia

1

-

-

... More
Nandini River Crossing- 8" NB Dia

1

-

-

... More
Netravati River Crossing-8" NB Dia

1

-

-

... More
Dhanbad GA

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.

-

-

-

... More
Sarsa Kundi River Crossing- 12’’ NB dia

1

-

-

... More
Bagh Mara Crossing - 12’’ NB dia

1

-

-

... More
Chas Nala River Crossing - 4’’ NB dia

1

-

-

... More
Kandra Section Crossing - 4’’ NB dia

1

-

-

... More
For every additional period of one month or part thereof

-

-

-

... More
Sarsa Kundi River Crossing- 12’’ NB dia

1

-

-

... More
Bagh Mara Crossing - 12’’ NB dia

1

-

-

... More
Chas Nala River Crossing - 4’’ NB dia

1

-

-

... More
Kandra Section Crossing - 4’’ NB dia

1

-

-

... More
Rourkela GA

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.

-

-

-

... More
Distributary of Bramhni River - 8’’ NB dia

1

-

-

... More
Distributary of Sankh River- 4’’ NB dia

1

-

-

... More
For every additional period of one month or part thereof

-

-

-

... More
Distributary of Bramhni River - 8’’ NB dia

1

-

-

... More
Distributary of Sankh River- 4’’ NB dia

1

-

-

... More
Preservation of Un-Identified Pipeline Crossing

-

-

-

... More
For 12" NB Line

250

-

-

... More
For 8" NB Line

250

-

-

... More
For 6" NB Line

250

-

-

... More
For 4" NB Line

250

-

-

... More
Notes: i) All accessories i.e.; required nos. of dished end caps and tappings of 3/4 inches, PG to be considered per section and the rates are inclusive in above item rate. ii) If month is partially complete, payment shall be made on prorata basis.

-

-

-

... More
iii) Quantity mention against each SOR item is for multiple crossing at various locations with in the of Vrindavan , Dakshin Kannada, Dhanbad & Rourkela GA.

-

-

-

... More
DIGITIZATION OF RADIOGRAPHY FILMS:

-

-

-

... More
Carrying out digitization of all radiographic films (HDD crossings) in the form of digital images (which can then be archived safely for long life and electronic retrieval) complying to all the legal local rules, codes and international standards. Submission of digital images of radiographic film along with compatible software in 6 sets of CD/DVD/Pendrive for electronic viewing /retreival.

-

-

-

... More
For 12" NB Line

110

-

-

... More
For 8" NB Line

220

-

-

... More
For 6" NB Line

110

-

-

... More
For 4" NB Line

160

-

-

... More
Note: (i) Quantity mentioned above is for Digitalization of RT films for various crossings with in the GA as per scope of work.

-

-

-

... More
(ii) Qty mentioned above is tentative and may increase or decrease as per site situation.

-

-

-

... More
Videography & Photography

-

-

-

... More
Carrying out the videography and photography of all the HDD construction activities.i.e. Stringing, Welding, Radiography,Pre hydrotesting, Joint Coating, all HDD activities, post hydrotesting, restoration etc performing all works as per specification & direction of EIC/RCM and other provision of contract document.

-

-

-

... More
For 12" NB Line

3

-

-

... More
For 8" NB Line

5

-

-

... More
For 6" NB Line

2

-

-

... More
For 4" NB Line

4

-

-

... More
Note : (i) Unit mentioned "Each" refers to number of HDDs.

-

-

-

... More
PERMANENT MARKERS

-

-

-

... More
Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of engineer-in-charge.

-

-

-

... More
Vrindavan GA

-

-

-

... More
Pipeline warning markers with post & foundations

4

-

-

... More
Navigable Waterway Markers

4

-

-

... More
Dakshin Kannada GA

-

-

-

... More
Pipeline warning markers with post & foundations

8

-

-

... More
Navigable Waterway Markers

8

-

-

... More
Dhanbad GA

-

-

-

... More
Pipeline warning markers with post & foundations

10

-

-

... More
Navigable Waterway Markers

10

-

-

... More
Rourkela GA

-

-

-

... More
Pipeline warning markers with post & foundations

6

-

-

... More
Navigable Waterway Markers

6

-

-

... More
Note: Qty of above markers are tentative and may increase or decrease as per site situation. Contractor have to take prior approval from EIC before fabrication or order placement.

-

-

-

... More
CATHODIC PROTECTION WORKS

-

-

-

... More
Vrindavan GA , Dakshin Kannada GA, Dhanbad GA & Rourkela GA

-

-

-

... More
Supply, packing, transportation to site, storage, installation, testing & commissioning of the temporary Cathodic protection system using Mg (Min 5.0 Kg Each) galvanic anodes to protect the external surface of 12"/8"/6"/4' dia, 3LPE Coated pipe at various river crossings (as per Annexure-I enclosed with PJS for CP system) in Vrindavan GA , Dakshin Kannada GA, Dhanbad GA & Rourkela GA and surrounding area by HDD against corrosion for a design life of minimum 2 year or till commissioning of PCP system/connenction of HDD segment with mainline whichever is earlier as per standard specification No.- MEC/S/05/E9/016A for temporary cathodic protection system, Scope of work/PJS, Data Sheets & tender drawings. Scope shall also include but not limited to the following for completion of jobs:

-

-

-

... More
Sacrificial anodes- Pre packed Mg anodes

-

-

-

... More
Prepacked Magnesium anodes for Carrier Pipe protection (Min 5.0 Kg Each) as per tender specification (1/2/3/4 Nos. of anodes) at both side of HDD crossing.

56

-

-

... More
Supply, laying, termination, Glanding and ferruling TCP-Cables--The Cables shall be annealed high conductivity, stranded copper conductor, 650/1100V grade, XLPE Insulated & PVC Sheathed in new/existing test stations.

-

-

-

... More
1c x 6 mm2 - Anode tail cable - unarmored

800

-

-

... More
1 core x 6 mm2 - Potential Measurement, ref Cell & measurement cable- armored

800

-

-

... More
1 core x 10 mm2 - current measurement cable & Pipeline to Test station- armored

1200

-

-

... More
Test Stations

-

-

-

... More
New test stations Normal Size-(Weather Proof with IP-55) as per tender drawings with name plate

28

-

-

... More
All Cable to pipe connections by Exothermic Process or Pin Brazing for all sizes (Upto 1C x 25mm2)

120

-

-

... More
Monitoring of the TCP system, on monthly basis, in HDD portion till commissioning of PCP system//connenction of HDD segment with mainline.

24

-

-

... More
Extended Stay Compensation (per month)- Refer clause 32.0 of ITB

1

-

-

... More
Total

-

-

-

... More
GST (CGST&SGST/UTGST or IGST) in percentage (%) on Total

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.