GAIL Gas Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
GAIL Gas Limited Tender
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date3 Aug 2022
Closing Date16 Aug 2022
Tender Amount₹ 63,35,125 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,70,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_GAILG_124678_1Bid Award Id
ViewTender No
GAIL GAS/AG/CNP/22/C06/NEW/2022-23Tender Authority
GAIL Gas Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Drilling holes (approx. 5 cm width & approx. 250 cm depth) on concrete / paved road/Bituminous Road or any other kind of Road/area for survey purposes (Min 3 m interval between two consecutive Drilled holes) including Liasioning/permissions with/from all concerned authorities or persons for drilling holes This line item includes but not limited to the Following activities to be executed by Contractor/Bidder: Drilling holes will be required if identified during the Pre-Assessment step.
Liaisoning for obtaining permissions from Concerned Authorities or Personnel for drilling holes, will be in scope of Contractor/Bidder. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
1700
-
-
... More
ICDA Indirect Inspection for 2.5 Km ICDA Indirect Inspection - inclusive of Internal Corrosion Predictive Modelling (ICPM) for predicting liquid hold-up, predicting solid hold-up and for calculating corrosion rates
ICDA Indirect Inspection will include but not limited to Following activities to be executed by Contractor/Bidder: a. Prediction of historical uniform corrosion rates under normal operating conditions
b. Calculation of pressure change, and temperature drop along the line
c. Prediction of pH value at each pipeline sub-region
d. Calculation of pitting corrosion rates as a function of solids deposition, liquid deposition and utilizing SME experience in the field of microbiologically influenced corrosion (MIC)
e. Calculation of wall loss % for flowing and shut-in scenarios
f. Sensitivity tests of operational parameters with respect to general corrosion rates w.r.t amount of water
g. Assessment of localized pitting corrosion.
Where applicable, calculation of:
i. Liquid and Solid hold-up
ii. Critical angles for water accumulation and solids accumulation
iii. Critical velocity for water accumulation and solids accumulation
2.5
-
-
... More
h. Assessment of top-of-line corrosion (where applicable) w.r.t to: 1. Water dew point calculation
2. Hydrocarbon dew point calculation i. Assessment of Microbiologically Influenced Corrosion records associated with the pipeline
j. Assessment of erosion occurring in the pipeline
k. Assessment of corrosion due to oxygen occurring in the pipeline
l. Locating most susceptible regions for internal corrosion This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
-
-
-
... More
Excavation for Direct Inspection Excavation for Direct Inspection (8" pipeline) for ECDA, ICDA and SCCDA including Liaisoning/permissions with/from all concerned authorities for excavation. Excavation for Direct Inspection (8" pipeline) for ECDA, ICDA and SCCDA including Liaisoning/permissions with/from all concerned authorities for excavation. Liaisoning with whomsoever (personnel or Authority), to obtain permission for Excavation, will be in Scope of Contractor/Bidder. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
675
-
-
... More
Surface Preparation for Inspection Surface Preparation for Inspection including removal of old coating (if required). Pipe Surface will be developed using emery paper or any other suitable material as per Standard Engineering Practice, before application of Recoating. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
45
-
-
... More
Direct Examination Inspection
45
-
-
... More
Please refer Scope of Work, Special Conditions of Contract and other Tender Documents for Detail.
Recoating Material supply with Installation Supply and Installation/applying of New Coating Material, will be in Scope of Contractor.
60
-
-
... More
Backfilling and Restoring ROw in original Backfilling of Excavated portion of road/ground, will be in Scope of Contractor. Reinstatement/Restoration of ROW of Pipeline in its Original Condition, will also be in Scope of Contractor. Liaisoning for any permission associated with Backfilling or Restoration will be in Scope of Contractor. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
675
-
-
... More
Post assessment Final Report Post Assessment Final Report will be submitted by Contractor. Please refer SCC, SOW and Other Tender Documents of this Contract
1
-
-
... More
Coating Defect Identification on 3 locations. Coating Defect Identification and Repair, on three locations on GAIL Gas Firozabad Pipeline as per details (co-ordinates) which will be provided by Gail Gas Firozabad and it will include holiday testing for coating defect identification, old defective coating removal, coating material supply and application and submission of Report. These locations are on GAIL GAS Firozabad Pipeline but are different from 2.5 km long pipeline to be assessed. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
3
-
-
... More
Excavation and Backfilling for SOR 12 Excavation and Backfilling including coordination/Liaisoning/permission with concerned authorities for excavation, backfilling and restoration/reinstatement of service road (paved/bituminous/concrete or any type of road) to original condition on above mentioned three different locations (in SOR 12 where co-ordinates will be provided by Gail Gas Firozabad) other than 2.5 km pipeline. Above mentioned all the works will be done by Bidder/Contractor. Contractor (unless otherwise specified) in all the SORs of this Contract, will mean Eligible Bidder or awardee of Contract. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
20
-
-
... More
Supply of Cold Tape for SOR 12 Supply of Cold Tape for SOR item 12 and SOR item 13. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents. Measurement Unit M refers to running Metre of Pipe. For example, 5 M in this SOR item means appropriate Quantity of coating Material required to cover 5 Meter length of Pipe as per applicable standards and as per Sound Engineering Practices. This SOR item is to be read in Conjunction with Special Conditions of Contract, Scope of Work and Other Tender Documents.
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements